Genetic Algorithms in Construction Project Management: A Review
...Show More Authors

Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problems associated with multi-modal, noisy, high dimensional and discrete functions. However, with a range of benefits, there are multiple challenges as well such as GA can be time consuming to restore the images and may provide partial solution to the problem.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Improving the Performance of Construction Project Information and Communication Management Using Web-Based Project Management Systems (WPMSs)
...Show More Authors

This paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Green Engineering
Sustainability and recovery project management implementation on construction projects in Iraq
...Show More Authors

Scopus (1)
Scopus
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Mechanical Engineering
Innovations and Requirements of Strategy for Digital Maintenance Management in Construction Project
...Show More Authors

Scopus (2)
Scopus
Publication Date
Fri Jul 01 2016
Journal Name
Journal Of Engineering
Identificatio n Of Key Factors Affecting Waste Management In Life Cycle Of The Construction Project By Using Delphi Technique
...Show More Authors

The problem of generated waste as a result of the implementation of construction projects, has  been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted  amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accom

... Show More
View Publication Preview PDF
Publication Date
Sun Dec 22 2024
Journal Name
Journal Of Petroleum Research And Studies
Optimizing Well Placement with Genetic Algorithms: A Case Study
...Show More Authors

Maximizing the net present value (NPV) of oil field development is heavily dependent on optimizing well placement. The traditional approach entails the use of expert intuition to design well configurations and locations, followed by economic analysis and reservoir simulation to determine the most effective plan. However, this approach often proves inadequate due to the complexity and nonlinearity of reservoirs. In recent years, computational techniques have been developed to optimize well placement by defining decision variables (such as well coordinates), objective functions (such as NPV or cumulative oil production), and constraints. This paper presents a study on the use of genetic algorithms for well placement optimization, a ty

... Show More
View Publication
Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
Scopus (5)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
View Publication
Scopus (5)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in