Preferred Language
Articles
/
roZjM4YBIXToZYAL3X5E
Optimization of Infill Drilling in Whicher Range Field in Australia
...Show More Authors
Abstract<p>Now that most of the conventional reservoirs are being depleted at a rapid pace, the focus is on unconventional reservoirs like tight gas reservoirs. Due to the heterogeneous nature and low permeability of unconventional reservoirs, they require a huge number of wells to hit all the isolated hydrocarbon zones. Infill drilling is one of the most common and effective methods of increasing the recovery, by reducing the well spacing and increasing the sweep efficiency. However, the problem with drilling such a large number of wells is the determination of the optimum location for each well that ensures minimum interference between wells, and accelerates the recovery from the field. Detailed 3-D numerical reservoir modelling is the most trusted method to determine the optimum locations of the infill wells, but it is time consuming and expensive. Therefore, the industry is on the lookout for methods that are fast and effective. Over the last few decades, researcher have come up with techniques like moving window, rapid inversion, Infill Well Locator Calculator (IWLC) etc. for infill drilling optimization of tight resources.</p><p>In this paper reservoir simulation modelling was combined with the Moving Window Method (MWM) to develop an optimum infill-drilling plan for Whicher Range (WR) Tight-gas Field in Western Australia. The accuracy and effectiveness of developed optimum plan are justified through comparative studies using standard reservoir simulation model; which demonstrates that the proposed plan effectively predicts the optimum number of wells including the production rate of each wells similar to that obtained from standard reservoir simulation studies. It is also inferred that reservoir simulation combined with MWM requires less data and much simpler as well as faster compared to standard reservoir simulation for optimizing an infill drilling plan for alike of Whicher Range tight gas field.</p>
Scopus Crossref
View Publication
Publication Date
Sat Jun 01 2024
Journal Name
Case Studies In Chemical And Environmental Engineering
Optimization of photocatalytic process with SnO2 catalyst for COD reduction from petroleum refinery wastewater using a slurry bubble photoreactor
...Show More Authors

View Publication
Scopus (8)
Crossref (7)
Scopus Crossref
Publication Date
Sat Feb 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Application Effect of the Conflict Management Strategies On Increasing Workers Productivity at the Electricity Company (IGEC) (Field Study Irbid Governorate)
...Show More Authors

Research aimed to explore the Application Effect of the Conflict Management Strategies by the managements to solve conflict between and inside the conflicted parties within (IGEC) to increase the productivity of the workers. To collect data, 110 questioners had been distributed among managers and heads of departments of all managerial levels, 102 answered questioners regained, 5 of them were disqualify for statistical analytic, only 97 were taking in consideration   for statistical analysis presenting 93% of the retained number.

SPSS Program supported with a group of statistical tools, had been used for analysis purposes such as Kronbach Alpha test to assure the validity & stability of the t

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Mar 01 2009
Journal Name
Baghdad Science Journal
Determination of Similarity and Variance in Energy and Depositional Environment, the Difference in Diagenesis and the Variance in the Petrophysical Properties of Reservoir Rocks in Zubair Formation , South Iraq
...Show More Authors

Records of two regionalized variables were processed for each of porosity and permeability of reservoir rocks in Zubair Formation (Zb-109) south Iraq as an indication of the most important reservoir property which is the homogeneity , considering their important results in criterion most needed for primary and enhanced oil reservoir .Z and F tests that were calculated for the two above mentioned properties of pair units of Zubair Formation have shown the difference in depositional energy and different diagenesis between units IL and AB , DJ and AB , and the similarity in grains size , sorting degree , depositional environment and pressure gradients between IL and AB units , LS and IL units ; also the difference in the properties above betw

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Reflection of selection of employee's strategy on human capital/ (Field research at the University of Baghdad)
...Show More Authors

Abstract:

This research aims to know the reflection of selection of employees strategy dimensions ( selection of employees strategy standards, procedures selection of employees strategy , efficiency based on a selection of employees strategy) on human capital (knowledge, skills, abilities) in a sample of Lecturers consists of (Deans and assistants and heads of departments) in ( Baghdad University) included nine colleges and university president as total sample size (54), which represent almost 50% of the total research community of 116, was used in the light of the objectives of the research descriptive and analytical approach, has been a resolution main tool for data collection as well as the interview p

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Sep 30 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Identifying Average Reservoir Pressure in Multilayered Oil Wells Using Selective Inflow Performance (SIP) Method
...Show More Authors

The downhole flow profiles of the wells with single production tubes and mixed flow from more than one layer can be complicated, making it challenging to obtain the average pressure of each layer independently.  Production log data can be used to monitor the impacts of pressure depletion over time and to determine average pressure with the use of Selective Inflow Performance (SIP). The SIP technique provides a method of determining the steady state of inflow relationship for each individual layer. The well flows at different stabilized surface rates, and for each rate, a production log is run throughout the producing interval to record both downhole flow rates and flowing pressure. PVT data can be used to convert measured in-situ rates

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Sep 30 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Identifying Average Reservoir Pressure in Multilayered Oil Wells Using Selective Inflow Performance (SIP) Method
...Show More Authors

The downhole flow profiles of the wells with single production tubes and mixed flow from more than one layer can be complicated, making it challenging to obtain the average pressure of each layer independently.  Production log data can be used to monitor the impacts of pressure depletion over time and to determine average pressure with the use of Selective Inflow Performance (SIP). The SIP technique provides a method of determining the steady state of inflow relationship for each individual layer. The well flows at different stabilized surface rates, and for each rate, a production log is run throughout the producing interval to record both downhole flow rates and flowing pressure. PVT data can be used to convert measured in-situ r

... Show More
Preview PDF
Crossref
Publication Date
Wed Feb 16 2022
Journal Name
Journal Of Economics And Administrative Sciences
Solving Resource Allocation Model by Using Dynamic Optimization Technique for Al-Raji Group Companies for Soft Drinks and Juices
...Show More Authors

In this paper, the problem of resource allocation at Al-Raji Company for soft drinks and juices was studied. The company produces several types of tasks to produce juices and soft drinks, which need machines to accomplish these tasks, as it has 6 machines that want to allocate to 4 different tasks to accomplish these tasks. The machines assigned to each task are subject to failure, as these machines are repaired to participate again in the production process. From past records of the company, the probability of failure machines at each task was calculated depending on company data information. Also, the time required for each machine to complete each task was recorded. The aim of this paper is to determine the minimum expected ti

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Sep 04 2018
Journal Name
Al-khwarizmi Engineering Journal
Modified Elman Neural-PID Controller Design for DC-DC Buck Converter System Based on Dolphin Echolocation Optimization
...Show More Authors

This paper describes a new proposed structure of the Proportional Integral Derivative (PID) controller based on modified Elman neural network for the DC-DC buck converter system which is used in battery operation of the portable devices. The Dolphin Echolocation Optimization (DEO) algorithm is considered as a perfect on-line tuning technique therefore, it was used for tuning and obtaining the parameters of the modified Elman neural-PID controller to avoid the local minimum problem during learning the proposed controller. Simulation results show that the best weight parameters of the proposed controller, which are taken from the DEO, lead to find the best action and unsaturated state that will stabilize the Buck converter system performan

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Fri Nov 01 2019
Journal Name
Civil Engineering Journal
Time-Cost-Quality Trade-off Model for Optimal Pile Type Selection Using Discrete Particle Swarm Optimization Algorithm
...Show More Authors

The cost of pile foundations is part of the super structure cost, and it became necessary to reduce this cost by studying the pile types then decision-making in the selection of the optimal pile type in terms of cost and time of production and quality .So The main objective of this study is to solve the time–cost–quality trade-off (TCQT) problem by finding an optimal pile type with the target of "minimizing" cost and time while "maximizing" quality. There are many types In the world of piles but  in this paper, the researcher proposed five pile types, one of them is not a traditional, and   developed a model for the problem and then employed particle swarm optimization (PSO) algorithm, as one of evolutionary algorithms with t

... Show More
Scopus (9)
Crossref (9)
Scopus Clarivate Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Journal Of Engineering Science And Technology
Applying box-behnken design with statistical optimization for removal vat orange dye from aqueous solution using kaolin
...Show More Authors

Scopus (4)
Scopus