Flexible job-shop scheduling problem (FJSP) is one of the instances in flexible manufacturing systems. It is considered as a very complex to control. Hence generating a control system for this problem domain is difficult. FJSP inherits the job-shop scheduling problem characteristics. It has an additional decision level to the sequencing one which allows the operations to be processed on any machine among a set of available machines at a facility. In this article, we present Artificial Fish Swarm Algorithm with Harmony Search for solving the flexible job shop scheduling problem. It is based on the new harmony improvised from results obtained by artificial fish swarm algorithm. This improvised solution is sent to comparison to an overall best solution. When it is the better one, it replaces with the artificial fish swarm solution from which this solution was improvised. Meanwhile the best improvised solutions are carried over to the Harmony Memory. The objective is to minimize a total completion time (makespan) and to make the proposed approach as a portion of the expert and the intelligent scheduling system for remanufacturing decision support. Harmony search algorithm has demonstrated to be efficient, simple and strong optimization algorithm. The ability of exploration in any optimization algorithm is one of the key points. The obtained optimization results show that the proposed algorithm provides better exploitation ability and enjoys fast convergence to the optimum solution. As well, comparisons with the original artificial fish swarm algorithm demonstrate improved efficiency.
KE Sharquie, RA Najim, RK Al-Hayani, AA Al-Nuaimy, DM Maroof, Saudi medical journal, 2008 - Cited by 74
Seventy four Iraqi breast cancer paraffin blocks were collected from patients were attended to center health laboratory, histopathology department, Bagdad, Iraq. The patients information’s which included: name, age, and the pathological stage, grade, tumor size were obtained from the clinical records of the patients also relation with sex hormones was recorded. The cases which has been taken included invasive ductal and invasive lobular carcinoma type Women age were ranged from 24-80 years peak age frequency of tumor occurred in the category of more than 40 years old. Immunohistochemical expression of her-2/neu was from total 74 cases of infiltrative ductal carcinoma cases, 27(36.49%)were positive for Her-2/neu expression, 47(63.51%) were
... Show MoreThe research aims to demonstrate the quality of the auditor’s report by analyzing a number of models represented by the auditor’s report based on the Iraqi audit evidence and the auditor’s report in light of the application of international auditing standards for the report and the auditor’s report in light of the application of the International Auditing Standard 701, in addition to explaining the impact of applying the International Auditing Standard 701. International Auditing 701 in enhancing the quality of the auditor's report, and in order to reach these goals, a comparison was made on international experiences before and after the application of the standard in addition to the results of the questionnaire distribut
... Show MoreHemogloin (Hb) and serum ferritin levels are used to assess anemia in pregnancy. Some studies referred to the influence of maternal age, body mass index (BMI) and parity on Hb and serum ferritin levels. The study aimed to examine the possible association of maternal Hb and serum ferritin with maternal age, parity, and BMI in a sample of pregnant women in Baghdad.
Ninety healthy pregnant women, grouped in three equal groups according to the pregnancy trimester, and thirty apparently healthy non-pregnant women from Baghdad were enrolled in this observational study. Blood and serum samples were obtained for the estimation of Hb and serum ferritin levels.
The pooled data of participants showed a n
... Show MoreKE Sharquie, AA Noaimi, RA Flayih, Am J Clin Res Rev, 2020 - Cited by 4