capable of the measuring with a high degree of precision in a single instrument. Total stations device are used for station setting up, setting-outmany points from one station. Their major purpose of this work is to take advantage of total station for setting up building and to establish 3D representation using AutoCAD program. The area of the study was Civil Engineering Department at Baghdad University campus AL Jadiriyah. The completion of the work is done in two stages; 1. The field work: In this stage, the Total Station Nikon Nivo-5C was selected for the current study. This device was measured horizontal and vertical distance, elevations, and coordinates from a single set up. This data directly stored on memory. 2. The office work: In this stage, AutoCAD program is adopted for design and establish 3D representation of the building to be completely faster and easier. Finally, AutoCAD models provided the basic building information such as boundaries, dimensions and positions. This method is used for construction surveys, designer works and other users.
Green buildings are considered more efficient than traditional buildings due to the incorporated techniques and the multidisciplinary specializations required to comply with their specifications, in addition to the advanced commissioning, which undergoes before handing over the buildings to the owners to ensure requirements conformance. As a result, the appropriate selection of a project delivery system acts as the essential factor that affects the performance of the project. This research aims at building a system that helps to select the best method to implement green buildings. Through studying the recent research approaches in project delivery systems, the factors that affect the selection of the optimal implementation method fo
... Show MoreTo translate sustainable concepts into sustainable structure, there is a require a collaborative work and technology to be innovated, such as BIM, to connect and organize different levels of industry e.g. decision-makers, contractors, economists, architects, urban planners, construction supplies and a series of urban planning and strategic infrastructure for operate, manage and maintain the facilities. This paper will investigate the BIM benefits as a project management tool, its effectiveness in sustainable decision making, also the benefit for the local industry key stakeholders by encouraging the BIM use as a project management tool to produce a sustainable building project. This p
The Indoor Environmental Quality (IEQ) describes an indoor space condition that the wellbeing and comfortability are provided for the users. Many researchers have highlighted the importance of adopting IEQ criteria, although they are not yet well defined in the Kurdistan region. However, environmental quality is not necessary for the contemporary buildings of the Kurdistan Region, and there is no measurement tool in the Region. This research aims to develop an IEQ assessment tool for the Kurdistan region using Mixed method methodology, both qualitative and quantitative. Therefore, a Delphi Technique was used as a method initially developed as systematic, interactive forecasting on a panel of experts. Thirty-five Delphi C
... Show MoreThe research problem arose from the researchers’ sense of the importance of Digital Intelligence (DI), as it is a basic requirement to help students engage in the digital world and be disciplined in using technology and digital techniques, as students’ ideas are sufficiently susceptible to influence at this stage in light of modern technology. The research aims to determine the level of DI among university students using Artificial Intelligence (AI) techniques. To verify this, the researchers built a measure of DI. The measure in its final form consisted of (24) items distributed among (8) main skills, and the validity and reliability of the tool were confirmed. It was applied to a sample of 139 male and female students who were chosen
... Show MoreA digital elevation model (DEM) is a digital representation of ground surface
topography or terrain. It can be represented as a raster (a grid of squares) and it is
commonly estimated by utilizing remote sensing techniques, or from land surveying.
In this research a 3D building of Baghdad university campus have been performed
using DEM, where the easting, northing, and elevation of 400 locations have been
obtained by field survey using global positioning system (GPS). The image of the
investigated area has been extracted from QuickBird satellite sensor (with spatial
resolution of 0.6 m). This image has been geo-referenced by selecting ground
control points of the GPS. The rectification is running, using 1st order
Objectives: To choose the best mode of delivery
for term, frank or complete, breech presentation
through studying the perinatal outcome of each mode of
delivery decided when managing a group of pregnant
ladies presented with breech delivery in our centre.
Methods: One hundred and fifty pregnant ladies
presented at term with singleton, frank or complete,
breech presentation for delivery in our centre during the
period from May 2004 toAugust 2005.
Mode of delivery, parity, gestational age, maternal age,
maternal medical illness, and birth weight where the
variables that have been tested in each delivery
included in the study to verify their relationship to
perinatal outcome.
Results: No significant
Strives Total Productive Maintenance to increase the overall effectiveness of the equipment through the early involvement in the design and manufacture of equipment productivity. It also operates in an environment of simultaneous engineering work on the synchronization of activities to take advantage of early information by maintenance engineers, design, operation, and that helps to reduce the faults and facilitate future maintenance tasks.
Has adopted a search in the theoretical concept of the total maintenance productivity and concurrent engineering activities carried out during which the conjunction a
... Show MoreAcute decompensated heart failure (ADHF) is a leading cause of hospital admission and many factors are known to precipitate decompensation. We aimed to assess the decompensating factors of heart failure and the management of patients admitted to the emergency department (ED). A total of 107 patients were examined, all diagnosed with ADHF in the ED of the Baghdad Teaching Hospital, from June 2017 to December 2017, and presenting with decom¬pensation (pulmonary oedema, peripheral oedema, and fatigue). The mean patient age was 62.5 ± 9.8 years (range: 43–85 years); the majority of them were in their 7th decade (37.4%), and men were slightly more than women. Hy¬pertension was the most commonly associated comorbidity (68.2%), follow
... Show More