Every so often, a confluence of novel technologies emerges that radically transforms every aspect of the industry, the global economy, and finally, the way we live. These sharp leaps of human ingenuity are known as industrial revolutions, and we are currently in the midst of the fourth such revolution, coined Industry 4.0 by the World Economic Forum. Building on their guideline set of technologies that encompass Industry 4.0, we present a full set of pillar technologies on which Industry 4.0 project portfolio management rests as well as the foundation technologies that support these pillars. A complete model of an Industry 4.0 factory which relies on these pillar technologies is presented. The full set of pillars encompasses cyberphysical systems and Internet of Things (IoT), artificial intelligence (AI), machine learning (ML) and big data, robots and drones, cloud computing, 5G and 6G networks, 3D printing, virtual and augmented reality, and blockchain technology. These technologies are based on a set of foundation technologies which include advances in computing, nanotechnology, biotechnology, materials, energy, and finally cube satellites. We illustrate the confluence of all these technologies in a single model factory. This new factory model succinctly demonstrates the advancements in manufacturing introduced by these modern technologies, which qualifies this as a seminal industrial revolutionary event in human history.
The aim of this paper is to shed the light on the concepts of agency theory by measuring one of the problems that arise from it, which is represented by earnings management (EM) practices. The research problem is demonstrated by the failure of some Iraqi banks and their subsequent placement under the supervision of the Central Bank of Iraq, which was attributed, in part, to the inadequacy of the agency model in protecting stakeholders in shareholding institutions, as well as EM, pushed professional institutions to adopt the corporate governance model as a method to regulate the problem of accounting information asymmetry between the parties to the agency. We are using the Beneish M-score model and the financial analysis equations in
... Show Morethis paper presents a novel method for solving nonlinear optimal conrol problems of regular type via its equivalent two points boundary value problems using the non-classical
Companies compete greatly with each other today, so they need to focus on innovation to develop their products and make them competitive. Lean product development is the ideal way to develop product, foster innovation, maximize value, and reduce time. Set-Based Concurrent Engineering (SBCE) is an approved lean product improvement mechanism that builds on the creation of a number of alternative designs at the subsystem level. These designs are simultaneously improved and tested, and the weaker choices are removed gradually until the optimum solution is reached finally. SBCE implementations have been extensively performed in the automotive industry and there are a few case studies in the aerospace industry. This research describe the use o
... Show MoreThe current research aims to :
•know the level of social intelligence of the sample as a whole .
. •taraf statistically significant differences in social intelligence between disadvantaged and
non-disadvantaged peers .
To achieve these objectives, the selected sample of Talbhalmrahlh medium and specifically
students of the second grade average, were chosen randomly stratified's (360) students
included sex (male, female) and (deprived of the Father and the non-deprived) for the
academic year (2013-2014) for the province of Baghdad on both sides (Rusafa-Karkh (
As applied to them measurements of social intelligence, which is prepared by the researcher,
having achieved _khasaúsma of psychometric (valid and re
This study came for the reason that some project administrations still do not follow the appropriate scientific methods that enable them to perform their work in a manner that achieves the goals for which those projects arise, in addition to exceeding the planned times and costs, so this study aims to apply the methods of network diagrams in Planning, scheduling and monitoring the project of constructing an Alzeuot intersection bridge in the city of Ramadi, as the research sample, being one of the strategic projects that are being implemented in the city of Ramadi, as well as being one of the projects that faced during its implementation Several of problems, the project problem was studied according to scientific methods through the applica
... Show MoreThe research study of the possibility of the application of the quality management system under the international standard ISO ISO9001: 2008 in the station project Rustumiya wastewater treatment of the Department of SEWER BAGHDAD - Baghdad MOREALITY as the first step in the right direction towards the implementation of total quality management (TQM), and the research Find the gap between the international standard and the quality system used in the organization surveyed through the use of checklists to analyze the gap, the checklist have included (191) items distributed on five basic requirements, according to the appearance in the international standard, namely, (quality management system, management responsibility, resource man
... Show MoreBackground Parkinson’s disease (PD) is currently the fastest-growing neurological disorder in the world. Patients with PD face numerous challenges in managing their chronic condition, particularly in countries with scarce healthcare infrastructure. Objective This qualitative study aimed to delve into neurologists’ perspectives on challenges and gaps in the Iraqi healthcare system that influence the management of PD, as well as strategies to mitigate these obstacles. Method Semi-structured interviews were conducted with neurologists from five different Iraqi provinces, working in both hospitals and private neurology clinics, between November 2024 and January 2025. A thematic analysis approach was employed to identify the main challenge
... Show More