Experimental tests were conducted to study the behavior of skirted foundations rested on dry medium sandy soil subjected to vertical and inclined loads. To achieve this goal, a small-scale physical model was designed and performed which contained an aluminum circular footing (100 mm) in diameter and (10 mm) in thickness and skirts with different heights, local medium poorly graded dry sand is placed in a steel soil container (2 mm) thick with internal dimensions (1000 mm x 1000 mm in cross section and 800 mm in height). The main objective of this study was to evaluate the response of skirt attached to the foundation at different skirt (L/D) ratios (0.0, 0.5, 1.0 and 1.5) and is subjected to point load at different angles of inclination (θ) (90 °, 80 °, 70 ° to 60 °) varying with the horizontal. In all tests, the relative density of sand was kept constant and equal to (60%). Four tests were conducted on a foundation without a skirt, for comparison reasons, and twelve tests were conducted on a skirt attached to foundation. The results showed that with decreasing the angle of inclination of load with the horizontal the load carrying capacity decreased due to increase the horizontal component of applied load which leads to increase the shear stresses under the foundation, however that effect decreases with increase the skirt height.
Many problems are facing the installation of piles group in laboratory testing and the errors in results of load and settlement are measured experimentally may be happened due to select inadequate method of installation of piles group. There are three main methods of installation in-flight, pre-jacking and hammering methods. In order to find the correction factor between these methods the laboratory model tests were conducted on small-scale models. The parameters studied were the methods of installation (in-flight, pre-jacking and hammering method), the number of piles and in sandy soil in loose state. The results of experimental work show that the increase in the number of piles value led to increase in load carrying capacity of piled raft
... Show MoreMany problems are facing the installation of piles group in laboratory testing and the errors in results of load and settlement are measured experimentally may be happened due to select inadequate method of installation of piles group. There are three main methods of installation in-flight, pre-jacking and hammering methods. In order to find the correction factor between these methods the laboratory model tests were conducted on small-scale models. The parameters studied were the methods of installation (in-flight, pre-jacking and hammering method), the number of piles and in sandy soil in loose state. The results of experimental work show that the increase in the number of piles value led to increase in load carrying ca
... Show MoreThe sensitive and important data are increased in the last decades rapidly, since the tremendous updating of networking infrastructure and communications. to secure this data becomes necessary with increasing volume of it, to satisfy securing for data, using different cipher techniques and methods to ensure goals of security that are integrity, confidentiality, and availability. This paper presented a proposed hybrid text cryptography method to encrypt a sensitive data by using different encryption algorithms such as: Caesar, Vigenère, Affine, and multiplicative. Using this hybrid text cryptography method aims to make the encryption process more secure and effective. The hybrid text cryptography method depends on circular queue. Using circ
... Show MoreSalah Al-Din Provence is an active agriculture and population region. One of its primary water sources is groundwater, which suffers from a lack of information regarding water quality and hydrochemistry. In order to study those missing variables, 27 samples from wells of shallow tubes were collected for analyzing the relevant physicochemical indices that help to produce the Schoeller index, Piper diagram, and Gibbs plot. Piper diagram revealed a hydrochemistry behavior of different values along with the groundwater samples. The chemistry of wells was controlled primarily by the evaporation process according to the Gibbs plot. The values of the Schoeller index of the studied samples stated that 59% of
Concrete columns with hollow-core sections find widespread application owing to their excellent structural efficiency and efficient material utilization. However, corrosion poses a challenge in concrete buildings with steel reinforcement. This paper explores the possibility of using glass fiber-reinforced polymer (GFRP) reinforcement as a non-corrosive and economically viable substitute for steel reinforcement in short square hollow concrete columns. Twelve hollow short columns were meticulously prepared in the laboratory experiments and subjected to pure axial compressive loads until failure. All columns featured a hollow square section with exterior dimensions of (180 × 180) mm and 900 mm height. The columns were categorized into
... Show MoreThis study reports testing results of the transient response of T-shape concrete deep beams with large openings due to impact loading. Seven concrete deep beams with openings including two ordinary reinforced, four partially prestressed, and one solid ordinary reinforced as a reference beam were fabricated and tested. The effects of prestressing strand position and the intensity of the impact force were investigated. Two values for the opening’s depth relative to the beam cross-section dimensions were inspected under the effect of an impacting mass repeatedly dropped from different heights. The study revealed that the beam’s transient deflection was increased by about 50% with gre
Massive multiple-input multiple-output (massive-MIMO) is considered as the key technology to meet the huge demands of data rates in the future wireless communications networks. However, for massive-MIMO systems to realize their maximum potential gain, sufficiently accurate downlink (DL) channel state information (CSI) with low overhead to meet the short coherence time (CT) is required. Therefore, this article aims to overcome the technical challenge of DL CSI estimation in a frequency-division-duplex (FDD) massive-MIMO with short CT considering five different physical correlation models. To this end, the statistical structure of the massive-MIMO channel, which is captured by the physical correlation is exploited to find sufficiently
... Show More