Correction Factor for Methods of Installation of Piles Group in Sandy Iraqi Soils
...Show More Authors

Many problems are facing the installation of piles group in laboratory testing and the errors in results of load and settlement are measured experimentally may be happened due to select inadequate method of installation of piles group. There are three main methods of installation in-flight, pre-jacking and hammering methods. In order to find the correction factor between these methods the laboratory model tests were conducted on small-scale models. The parameters studied were the methods of installation (in-flight, pre-jacking and hammering method), the number of piles and in sandy soil in loose state. The results of experimental work show that the increase in the number of piles value led to increase in load carrying capacity of piled raft and decrease in settlement value for three methods of installation. The response of increases load capacity for hammering method is the same value of pre-jacking method at the number of piles less than (N=2), while when the number of piles are beyond (N=3 to 9). The load capacity of hammering method is more than pre-jacking method and the correction factor of method of installation depend on the type of method of installation and the piles number. The increase in carrying capacity by hammering method is due to mobilize the dynamic soil structure interaction (soil-pile and pile-pile interaction) and the change in properties for surrounding soil for loose state of sand is more effective than static soil structure interaction mobilize by pre-jacking method. The correction factor of increase in load capacity and the correction factor of the percentage of settlement reduction for pre-jacking and hammering methods are compared with in-flight method of installation are changed with the number of piles and these values are increased with increasing the number of piles.

Publication Date
Thu Sep 01 2016
Journal Name
Journal Of Engineering
Correction Factor for Methods of Installation of Piles Group in Sandy Iraqi Soils
...Show More Authors

Many problems are facing the installation of piles group in laboratory testing and the errors in results of load and settlement are measured experimentally may be happened due to select inadequate method of installation of piles group. There are three main methods of installation in-flight, pre-jacking and hammering methods. In order to find the correction factor between these methods the laboratory model tests were conducted on small-scale models. The parameters studied were the methods of installation (in-flight, pre-jacking and hammering method), the number of piles and in sandy soil in loose state. The results of experimental work show that the increase in the number of piles value led to increase in load carrying ca

... Show More
View Publication Preview PDF
Publication Date
Wed Sep 01 2021
Journal Name
Iop Conference Series: Earth And Environmental Science
Response of Piles Group embedded in Sandy Soil with Cavities to Seismic Loading
...Show More Authors

Scopus Crossref
Publication Date
Wed Oct 24 2018
Journal Name
European Journal Of Environmental And Civil Engineering
Investigation the impacts of fuel oil contamination on the behaviour of passive piles group in clayey soils
...Show More Authors

View Publication Preview PDF
Scopus (10)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Sun Dec 17 2017
Journal Name
Al-khwarizmi Engineering Journal
Helical Piles Embedded in Expansive Soil Overlaying Sandy Soil
...Show More Authors

In this study, the behavior of square helical piles models (5×5) mm2 embedded in expansive soil bed overlaying a layer of sandy soil was investigated. The sand layer 200mm thickness was compacted into four sub layers in a steel container with diameter 400mm in size. Sandy soil layer was compacted into two relative densities 40% and 80%. The bed of ثءحties 40% and 80%.The bed of o00mm in size.Sandy soil layer was compacted into two relative densities 40% and 80%.The bed of oexpansive soil 300mm thickness was compacted into six sub layers on sandy soil layer. Model tests are performed with helical pile length 350mm, 400mm and 450mm and with helix diameter 15mm and 20mm. Also, one helix and double helix were

... Show More
View Publication Preview PDF
Publication Date
Mon Jan 01 2018
Journal Name
Rehabend
Prediction of impact force-time history in sandy soils
...Show More Authors

Scopus
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Load-settlement Behavior of Steel Piles in Different Sandy Soil Configurations
...Show More Authors

In the case where a shallow foundation does not satisfy with design requirements alone, the addition of a pile may be suitable to improve the performance of the foundation design. The lack of in-situ data and the complexity of the issues caused by lagging in the research area of pile foundations are notable. In this study, different types of piles were used under the same geometric conditions to determine the load-settlement relationships with various sandy soil relative densities. The ultimate pile capacity for each selected pile is obtained from a modified California Bearing Ratio (CBR) machine to be suitable for axial pile loading. Based on the results, the values of Qu for close-ended square pile were increased by 15

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jan 30 2020
Journal Name
Journal Of Engineering
Comparison of Single and Group Bored Piles Settlement Based on Field Test and Theoretical Methods
...Show More Authors

 Bored piles settlement behavior under vertical loaded is the main factor that affects the design requirements of single or group of piles in soft soils. The estimation of bored pile settlement is a complicated problem because it depends upon many factors which may include ground conditions, validation of bored pile design method through testing and validation of theoretical or numerical prediction of the settlement value. In this study, a prototype single and bored pile group model of arrangement (1*1, 1*2 and 2*2) for total length to diameter ratios (L/D) is 13.33 and clear spacing three times of diameter, subjected to vertical axial loads. The bored piles model used for the test was 2000

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Rehabend
Damping characteristics of dry sandy soils under impact
...Show More Authors

Scopus
Publication Date
Sat Jan 01 2022
Journal Name
Geotechnical Engineering And Sustainable Construction
Numerical Modeling of Under Reamed Piles Behavior Under Dynamic Loading in Sandy Soil
...Show More Authors

Under-reamed piles defined by having one or more bulbs have the potential for sizeable major sides over conventional straight-sided piles, most of the studies on under-reamed piles have been conducted on the experimental side, while theoretical studies, such as the finite element method, have been mainly confined to conventional straight-sided piles. On the other hand, although several laboratory and experimental studies have been conducted to study the behavior of under-reamed piles, few numer­ical studies have been carried out to simulate the piles' performance. In addition, there is no research to compare and evaluate the behavior of these piles under dynamic loading. Therefore, this study aimed to numerically investigate bearing capaci

... Show More
View Publication
Scopus (1)
Scopus Crossref
Publication Date
Sat Apr 07 2018
Journal Name
Civil Engineering Journal
Ultimate Lateral Load Capacity of Piles in Soils Contaminated with Industrial Wastewater
...Show More Authors

The present study devoted to determine the ultimate lateral carrying capacity of piles foundation in contaminated clayey soils and subjected to lateral cyclical loading. Two methods have been used to calculate the lateral carrying capacity of piles foundation; the first one is two-line slopes intersection method (TLSI) and the second method is a modified model of soil degradation. The model proposed by Heerama and then developed by Smith has been modified to take into consideration the effects of heavy loads and soil contamination. The ultimate lateral carrying capacity of single pile and piles group (2×2) driven into samples of contaminated clayey soils have been calculated by using the two methods. Clayey soil samples are contami

... Show More
View Publication
Crossref (2)
Clarivate Crossref