Abstract
This research aims to analyze the reality of the production process in an assembly line Cars (RUNNA) in the public company for the automotive industry / Alexandria through the use of some Lean production tools, and data were collected through permanence in the company to identify the problems of the line in order to find appropriate to adopt some Lean production tools solutions, and results showed the presence of Lead time in some stations, which is reflected on the customer's waiting time to get the car, as well as some of the problems existing in the car produced such as high temperature of the car, as the company does not take into account customer preferences,
... Show MoreThis Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and th
... Show MoreThe current study seeks to evaluate teacher preparation programs in the scientific disciplines at the College of Education in Al-Aqsa University in the light of the requirements of the labor market. It further aims to reveal the significance of the differences in the sample members’ response averages of to the availability of labor market requirements in the program that prepares the teacher of scientific disciplines at the Faculty of Education in Al-Aqsa University taking into account the (gender, program) variables. The study followed the descriptive analytical approach, and so a questionnaire was distributed to a sample of scientific discipline students in the teacher preparation program adopted in Al-Aqsa University, (200) male and
... Show MoreAbstract his study involved evaluation of side effects of two weight reduction pills that had been widely distributed in the last period. Two weight reduction compounds are studied, Reductil (containing chemical substances) and Chinese’s weight reduction herbs (containing natural substances). Two doses for each compound are used in this research; 5mg/ml and 0.5mg/ml for Reductil, while 30mg/ml and 10mg/ml for Chinese weight reduction herbs. To evaluate the toxic effects of these compounds, the following parameters were determined which include mitotic index (cytogenetic analysis), serum FSH and LH hormones level (follicles stimulation hormone/FSH and lutenising hormone/LH) and histological examination of female mice ovaries. Control group
... Show MoreThe printing designer's creative thinking is a deliberate mental process based on specific skills that stimulate the motivation of the student to learn and call for new information for the investigation and research to discover the problems and attitudes and through reformulating the experience in new patterns depending on the active imagination and the flexible scientific thinking through providing the largest number possible of various unfamiliar printing design models, and testing their suitability and then readjusting the results with the availability of suitable educational, learning and academic atmosphere.
The designer's creative thinking depends on main skills. Fluency skill is to put t
... Show MoreQuality control charts are limited to controlling one characteristic of a production process, and it needs a large amount of data to determine control limits to control the process. Another limitation of the traditional control chart is that it doesn’t deal with the vague data environment. The fuzzy control charts work with the uncertainty that exists in the data. Also, the fuzzy control charts investigate the random variations found between the samples. In modern industries, productivity is often of different designs and a small volume that depends on the market need for demand (short-run production) implemented in the same type of machines to the production units. In such cases, it is difficult to determine the contr
... Show More