This Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and the second is to maximize the amount produced from them, where the fuzzy data of the mathematical model were processed using the ranking function. Through the results obtained to solve the mathematical model using the Lingo program, we find that the mathematical model has achieved both objectives, i.e. reduce the total production costs of the main product to less than (4464254500) Iraqi dinars and maximize the amount produced from the main product for more than (17000) parts per month
Research summarized in applying the model of fuzzy goal programming for aggregate production planning , in General Company for hydraulic industries / plastic factory to get an optimal production plan trying to cope with the impact that fluctuations in demand and employs all available resources using two strategies where they are available inventories strategy and the strategy of change in the level of the workforce, these strategies costs are usually imprecise/fuzzy. The plant administration trying to minimize total production costs, minimize carrying costs and minimize changes in labour levels. depending on the gained data from th
... Show MoreABSTRUCT
This research aims at examining the expected gap between the fact of planning and controlling process of production at the State Company for Electric Industries and implementation of material requirements planning system in fuzzy environment. Developing solutions to bridge the gap is required to provide specific mechanisms subject to the logic of fuzzy rules that will keep pace with demand for increased accuracy and reduced waiting times depending on demand forecast, investment in inventory to reduce costs to a minimum.
The proposed solutions for overcoming the research problem has required some questions reflecting the problem with its multiple dimensions, which ar
... Show MoreThe exploitation of all available resources and benefiting from them is one of the most important problems facing the decision makers at the present time. In order to exploit these resources, it is necessary to organize the conflicting objectives, which is the main work in the project management, which enables the development of a plan that decision makers can use to shorten the total completion time and reduce the total cost of the project. Through the use of modern scientific techniques, and therefore the researcher using the critical path method using the technology of programming goals to find more efficient ways to make appropriate decisions where the researcher worked to solve the problems in the construction of the Departm
... Show MoreMaterial Requirements Planning System (MRP) is considered as one of the planning and controlling of production and inventory systems which is used to prepare plan of the final production requirements and its parts of subcomponents raw materials and the time at which it was needed for the purpose of preparing orders of production and purchase.
The problem of the present work is represented in the general company of electrical industrialization adoption of traditional methods and personal experience of the process of the products and\or purchase quantity and inventory quantities and limiting the required time for acquiring the required quantities of the materials and parts used in the finish product of the
... Show MoreThe transfer function model the basic concepts in the time series. This model is used in the case of multivariate time series. As for the design of this model, it depends on the available data in the time series and other information in the series so when the representation of the transfer function model depends on the representation of the data In this research, the transfer function has been estimated using the style nonparametric represented in two method local linear regression and cubic smoothing spline method The method of semi-parametric represented use semiparametric single index model, With four proposals, , That the goal of this research is comparing the capabilities of the above mentioned m
... Show MoreThe aim of this study is to use style programming goal and technical programming goal fuzzy to study assessing need annual accurately and correctly depending on the data and information about the quantity the actual use of medicines and medical supplies in all hospitals and health institutions during a certain period where they were taking the company public for the marketing of medicines and medical supplies sample for research. Programming model was built goal to this problem, which included (15) variable decision, (19) constraint and two objectives:
1 - rational exchange of budget allocated for medicines and supplies.
2 - ensure that the needs of patients of medicines and supplies needed to improve
As is known that the consumer price index (CPI) is one of the most important price indices because of its direct effect on the welfare of the individual and his living.
We have been address the problem of Strongly seasonal commodities in calculating (CPI) and identifying some of the solution.
We have used an actual data for a set of commodities (including strongly seasonal commodities) to calculate the index price by using (Annual Basket With Carry Forward Prices method) . Although this method can be successfully used in the context of seasonal&nbs
... Show MoreIn this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show MoreThe operation of production planning is a difficult operation and it's required High effect and large time especially it is dynamic activity which it's basic variables change in continuous with the time, for this reason it needs using one of the operation research manner (Dynamic programming) which has a force in the decision making process in the planning and control on the production and its direct affect on the cost of production operation and control on the inventory.
This research include building mathematical models for aggregating planning and shorting planning by using integer programming technique for planning master production scheduling in order to control on the operating production for manufacturing companies to achieve their objectives of increasing the efficiency of utilizing resources and reduce storage and improving customers service through deliver in the actual dates and reducing delays.