There is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show MoreIn this research, damping properties for composite materials were evaluated using logarithmic decrement method to study the effect of reinforcements on the damping ratio of the epoxy matrix. Three stages of composites were prepared in this research. The first stage included preparing binary blends of epoxy (EP) and different weight percentages of polysulfide rubber (PSR) (0%, 2.5%, 5%, 7.5% and 10%). It was found that the weight percentage 5% of polysulfide was the best percentage, which gives the best mechanical properties for the blend matrix. The advantage of this blend matrix is that; it mediates between the brittle properties of epoxy and the flexible properties of a blend matrix with the highest percentage of PSR. The second stage
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show MoreThe Behavioral Disorders of Primary School pupils the son of Alcohol and Non Alcoholic
اثر التواجد العسكري الامريكي على النظام السياسي في العراق
The study aimed to identify the news framing on the Israeli Arabic-speaking i24 channel of the Israeli aggression on Gaza -2021 by analyzing the channel’s Program “this evening”. The study used the media survey method, and in its framework, it relied on the content analysis method for the program’s episodes from May 5, 2021 AD until June 4, 2021 AD, with 22 episodes. The study showed the program’s interest in launching the Palestinian resistance’s rockets significantly, followed by the Israeli military operations, and the program’s reliance on correspondents largely as a source of news material related to the aggression. It also proved that a news report and a reporter's report was the most important form of presenting news
... Show MoreThe objective of this research is to measure the training programs and identify the nature and then measure how it reflected on the quality of municipal services provided by the municipal departments investigated by measuring the quality of services based on quality standards, the researcher chose four municipal departments in the Rusafa / Baghdad (164 people) representing the directors and their assistants, officials of the municipal departments, the people and the engineering staff in charge of the task forces as well, including the survey of the views of the concerned persons in the management of the Vocational Training Institute in the Secretariat of the Republic, The quality of the municipal services
... Show MoreAbstract
Pneumatic processes sequence (PPS) is used widely in industrial applications. It is common to do a predetermined PPS to achieve a specific larger task within the industrial application like the PPS achieved by the pick and place industrial robot arm. This sequence may require change depending on changing the required task and usually this requires the programmer intervention to change the sequence’ sprogram, which is costly and may take long time. In this research a PLC-based PPS control system is designed and implemented, in which the PPS is programmed by demonstration. The PPS could be changed by demonstrating the new required sequence via the user by following simple series of manual steps without h
... Show MoreProducts’ quality inspection is an important stage in every production route, in which the quality of the produced goods is estimated and compared with the desired specifications. With traditional inspection, the process rely on manual methods that generates various costs and large time consumption. On the contrary, today’s inspection systems that use modern techniques like computer vision, are more accurate and efficient. However, the amount of work needed to build a computer vision system based on classic techniques is relatively large, due to the issue of manually selecting and extracting features from digital images, which also produces labor costs for the system engineers.
 
... Show More