Electronic remote identification (ER-ID) is a new radio frequency (RF) technology that is initiated by the Federal Aviation Authorities (FAA). For security reasons, traffic control, and so on, ER-ID has been applied for drones by the FAA to enable them to transmit their unique identification and location so that unauthorized drones can be identified. The current limitation of the existing ER-ID algorithms is that the application is limited to the Wi-Fi and Bluetooth wireless controllers, which results in a maximum range of 10–20 m for Bluetooth and 50–100 m for Wi-Fi. In this study, a mathematical computing technique based on finite state automaton (FSA) is introduced to expand the range of the ER-ID RF system and reduce the energy required by the drone to use the technology. A finite number of states have been designed to include a larger range of wireless network techniques, enabling the drones to be recognized while they are further away and in remote areas. This is achieved by including other means of RF channels, such as 4G/5G, Automatic Dependent Surveillance-Broadcast (ADS-B), long range Internet of things (IoT), and satellite communications, in the suggested ER-ID algorithm of this study. The introduced algorithm is tested via a case study. The results showed the ability to detect drones using all types of available radio frequency communication systems (RF-CS) while also minimizing the consumed energy. Hence, the authorities can control the licensed drones by using available RF-CS devices, such as Bluetooth and Wi-Fi, which are already widely used for mobile phones, as an example.
The construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire
... Show MoreAsmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement insi
... Show MoreThe Electrical power system has become vast and more complex, so it is subjected to sudden changes in load levels. Stability is an important concept which determines the stable operation of the power system. Transient stability analysis has become one of the significant studies in the power system to ensure the system stability to withstand a considerable disturbance. The effect of temporary occurrence can lead to malfunction of electronic control equipment. The application of flexible AC transmission systems (FACTS) devices in the transmission system have introduced several changes in the power system. These changes have a significant impact on the power system protection, due to differences inline impedance, line curre
... Show MoreAsmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement inside the reser
... Show MoreBackground: World Health Organization (WHO) and United Nation International Children Fund (UNICEF) developed a strategy known as Integrated Management of Childhood Illness (IMCI); which aims to reduce less than five years children morbidity and mortality in developing countries.
Objective: To assess the completion of the IMCI format status in primary health care centers, Baghdad.
Methods: A cross sectional study with analytic element was conducted during the period from 15th of January till 15th May 2016 in selected Primary health centers in Baghdad, Iraq. The sample consists of form of child files less than 2 months and form from 2
... Show MoreContemporary life is racing against time in its temptations and variables, and it has become shaped and changed in an amazing way in its various aspects and fields. This was facilitated by intellectual and scientific communication between civilizations, and the rapid progression in successive inventions and discoveries in the fields of science and arts of knowledge. This contributed to a great economic and commercial renaissance. Then, these economic developments entered the world into a very strong competition, which forced producers to calculate all production costs, to reach the highest profits by reducing the price of the produced commodity on the one hand, and achieving quality in appearance (especially) on the other hand. Since the ma
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show More