The provision of electric power is necessary for the advancement of the country's economy. It is the main engine of the economy and its various activities. It is an indicator of social welfare and it is considered as the basic pillars for achieving sustainable development (economic, social, environmental and institutional) by raising the levels of performance and meeting local needs. The problem of research was the absence of a program to audit the performance of the electricity sector contributes to ensure the application of sustainable development. The research was based on the hypothesis that the preparation of a proposed program to audit the performance of the electricity sector contributes to the achievement of The researchers sought to employ indicators of sustainable development in auditing the performance of the electricity sector as well as the performance audit indicators issued by the Federal Audit Bureau in accordance with the dimensions of sustainable development, through the preparation of a model "proposed to audit the performance of the electricity sector to achieve sustainable development, To a set of conclusions, the most important of which is the absence of a performance audit program of public electricity institutions that contributes to ensuring the achievement of sustainable development. The study came out with a set of recommendations, the most important of which is the need for an audit program that includes auditing the performance of public electricity institutions ensuring the achievement of sustainable development, for the purpose of promoting the reality of electricity activity to serve current and future generations. of the activity of electricity to serve the current and future generations.
This paper deals with a Twin Rotor Aerodynamic System (TRAS). It is a Multi-Input Multi-Output (MIMO) system with high crosscoupling between its two channels. It proposes a hybrid design procedure that combines frequency response and root locus approaches. The proposed controller is designated as PID-Lead Compensator (PIDLC); the PID controller was designed in previous work using frequency response design specifications, while the lead compensator is proposed in this paper and is designed using the root locus method. A general explicit formula for angle computations in any of the four quadrants is also given. The lead compensator is designed by shifting the dominant closed-loop poles slightly to the left in the
... Show MoreBackground:This is a prospective study of three children presented to us in the Orbital clinic in AL ShahidGazi Al Hariri Hospital with painless proptosiswith suspension of Hydatid disease.Objectives: : Orbital hydatid disease is a rare lesion accounting for less than 1% of the total lesions of the body (1, 2). Orbital cysts presented as a primary lesion in our study which is rare to have such lesion without involvement of other organs (3). Humans represent the intermediate host where the commonly affected organ are liver and the lung (10-15%) (4). Methods:This is a prospective study of three Children presented to us in the Orbital clinic in Al Shahid Ghazi Alhariri Hospital with painless proptosis with suspension of Hydatid disease, dep
... Show MoreThe preparation of low cost activated carbon from date stones and microwave method by using K2CO3 as chemical activator were investigated.
The prepared activated carbon was used to remove fluoroquinolones antibiotics from aqueous solution. The characterizations of the activated carbon is represented by surface area, pore volume, ash content, moisture content, bulk density, and iodine number. The adsorbed fluoroquinolones antibiotics are Ciprofloxcin (CIP), Norfloxcin (NOR) and Levofloxcin (LEVO). Different variables as pH, initial concentrations and contact time were studied to show the efficieny of prepared activated carbon. The experimental adsorption data were analyzed by Lungmuir, Freundlich
... Show MoreThe main objective of this paper is to study the behavior of Non-Prismatic Reinforced Concrete (NPRC) beams with and without rectangular openings either when exposed to fire or not. The experimental program involves casting and testing 9 NPRC beams divided into 3 main groups. These groups were categorized according to heating temperature (ambient temperature, 400°C, and 700°C), with each group containing 3 NPRC beams (solid beams and beams with 6 and 8 trapezoidal openings). For beams with similar geometry, increasing the burning temperature results in their deterioration as reflected in their increasing mid-span deflection throughout the fire exposure period and their residual deflection after cooling. Meanwhile, the existing ope
... Show MoreBackground The traditional management of appendicular mass is an initial conservative treatment followed by interval appendectomy. Recently interval appendicectomy has been questioned.
Objective: The purpose of this study was to clarify the need and the role of interval appendicectomy after successful initial conservative treatment.
Method: This is a prospective study conducted in a major hospital in Basra from April 2006 to Septemper2010, included 65 patients with appendicular mass which subsequently proved postinflammmatory (phlegmonous) changes of the appendix were treated conservatively.
Results: Routine interval appendicectomy was not performed and needed after successful treatment in the majority of the patients (84.6%). F
Finite Element Approach is employed in this research work to solve the governing differential equations related to seepage via its foundation's dam structure. The primary focus for this reason is the discretization of domain into finite elements through the placement of imaginary nodal points and the discretization of governing equations into an equation system; An equation for each nodal point or part, and unknown variables are solved. The SEEP / W software (program) is a sub-program of the Geo-Studio software, which is used by porous soil media to compensate for the problems of seepage. To achieve the research goals, a study was carried out on Hemrin dam, which located in the Diyala River 100 km northeast of Baghdad, Iraq. Thus, o
... Show MoreBackground: Since the invention of laser in 1960, lasers have been developed and approved in many fields. Lasers can now be regarded as practical tools with unique properties that have been utilized effectively in several applications in fields of medical and biological sciences.Objectives: The aim of the current study was to preparation of vaccines (live attenuated and killed) by irradiation of the bacteria by the low level diode laser.Methods: six bacterial isolates were isolated from human samples of diabetic foot infections, which used for preparation of vaccines. The experiment was conducted on fifteen adult male rabbits; they were divided into three groups with 5 rabbits each. Blood samples were collected from the marginal ear vein
... Show MoreThis paper presents a study to investigate the behavior of post-tensioned segmental concrete beams that exposed to high-temperature. The experimental program included fabricating and testing twelve simply supported beams that divided into three groups depending on the number of precasting concrete segments. All specimens were prepared with an identical length of 3150 mm and differed in the number of the incorporated segments of the beam (9, 7, or 5 segments). To simulate the genuine fire disasters, nine out of twelve beams were exposed to a high-temperature flame for one hour. Based on the standard fire curve (ASTM – E119), the temperatures of 300◦C (572◦F), 500◦C (932◦F), and 700◦C (1292◦F) were adopted. Consequently,
... Show MoreIn this work, the switching nonlinear dynamics of a Fabry-Perot etalon are studied. The method used to complete the solution of the differential equations for the nonlinear medium. The Debye relaxation equations solved numerically to predict the behavior of the cavity for modulated input power. The response of the cavity filled with materials of different response time is depicted. For a material with a response time equal to = 50 ns, the cavity switches after about (100 ns). Notice that there is always a finite time delay before the cavity switches. The switch up time is much longer than the cavity build-up time of the corresponding linear cavity which was found to be of the order of a few round-trip ti
... Show More