Preferred Language
Articles
/
joe-839
Building 1D Mechanical Earth Model for Zubair Oilfield in Iraq
...Show More Authors

Many problems were encountered during the drilling operations in Zubair oilfield. Stuckpipe, wellbore instability, breakouts and washouts, which increased the critical limits problems, were observed in many wells in this field, therefore an extra non-productive time added to the total drilling time, which will lead to an extra cost spent. A 1D Mechanical Earth Model (1D MEM) was built to suggest many solutions to such types of problems. An overpressured zone is noticed and an alternative mud weigh window is predicted depending on the results of the 1D MEM. Results of this study are diagnosed and wellbore instability problems are predicted in an efficient way using the 1D MEM. Suitable alternative solutions are presented ahead to the drilling process commences in the future operations.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Mar 27 2020
Journal Name
Solid State Technology
Seepage and Slope Stability Analysis for Hemrin Earth Dam in Iraq Using Geo-Studio Software
...Show More Authors

View Publication
Publication Date
Wed Jan 01 2020
Journal Name
Arab Journal Of Basic And Applied Sciences
Reliable iterative methods for 1D Swift–Hohenberg equation
...Show More Authors

View Publication
Crossref (5)
Crossref
Publication Date
Tue Sep 07 2021
Journal Name
Journal Of Petroleum Exploration And Production Technology
Wellbore instability management using geomechanical modeling and wellbore stability analysis for Zubair shale formation in Southern Iraq
...Show More Authors
Abstract<p>Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie</p> ... Show More
View Publication
Scopus (32)
Crossref (21)
Scopus Clarivate Crossref
Publication Date
Fri Jan 31 2025
Journal Name
Iraqi Geological Journal
1D Geomechanical Modeling to Detect the Deformation in Mishrif Formation at Nasriyah Oil Field, Iraq
...Show More Authors

Knowing the distribution of the mechanical rock properties and in-situ stresses for the field of interest is essential for many applications concerning reservoir geomechanics, including wellbore instability analysis, hydraulic fracturing, sand production, reservoir compaction, subsidence and water/gas injection throughout the filed life cycle. Determining the rock's mechanical properties is challenging because they cannot be directly measured at the borehole. The recovered carbonate core samples are limited and only provide discrete data for specific depths. This study focuses on creating a detailed 1D geomechanical model of the Mishrif reservoir in the Nasriyah oil field to identify the fault regime type for each unit in the format

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Evaluation of a fire safety risk prediction model for an existing building
...Show More Authors
Abstract<p>Fire is one of the most critical risks devastating to human life and property. Therefore, humans make different efforts to deal with fire hazards. Many techniques have been developed to assess fire safety risks. One of these methods is to predict the outbreak of a fire in buildings, and although it is hard to predict when a fire will start, it is critical to do so to safeguard human life and property. This research deals with evaluating the safety risks of the existing building in the city of Samawah/Iraq and determining the appropriateness of these buildings in terms of safety from fire hazards. Twelve parameters are certified based on the National Fire Protection Association (NFPA20</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Tue Mar 01 2011
Journal Name
Journal Of Economics And Administrative Sciences
Building a mathematical model for measuring and analyzing the general equilibrium in the Iraqi economy through the IS-lm-BP model
...Show More Authors

In order to achieve overall balance in the economy to be achieved in different markets and at one time (market commodity, monetary and labor market and the balance of payments and public budget), did not provide yet a model from which to determine the overall balance in the economy and the difficulty of finding the inter-relationship between all these markets and put them applied in the form of allowing the identification of balance in all markets at once.

One of the best models that have dealt with this subject is a model
(LM-BP-IS), who teaches balance in the commodity market and money market and balance of payments and the importance of this issue This research tries to shed light on the reality

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Nov 30 2022
Journal Name
Iraqi Geological Journal
A Predictive Model for Estimating Unconfined Compressive Strength from Petrophysical Properties in the Buzurgan Oilfield, Khasib Formation, Using Log Data
...Show More Authors

Unconfined compressive strength (UCS) of rock is the most critical geomechanical property widely used as input parameters for designing fractures, analyzing wellbore stability, drilling programming and carrying out various petroleum engineering projects. The USC regulates rock deformation by measuring its strength and load-bearing capacity. The determination of UCS in the laboratory is a time-consuming and costly process. The current study aims to develop empirical equations to predict UCS using regression analysis by JMP software for the Khasib Formation in the Buzurgan oil fields, in southeastern Iraq using well-log data. The proposed equation accuracy was tested using the coefficient of determination (R²), the average absolute

... Show More
View Publication
Crossref
Publication Date
Mon Apr 01 2019
Journal Name
Applied Water Science
Hydrochemistry as a tool for interpreting brine origin and chemical equilibrium in oilfields: Zubair reservoir southern Iraq case study
...Show More Authors

View Publication
Scopus (27)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Mon Jan 01 2018
Journal Name
Al–bahith Al–a'alami
The Communicative Integration in New Media: Building a Communicative Model
...Show More Authors

The internet, unlike other traditional means of communication, has a flexibility to stimulate the user and allows him to develop it. Perhaps, the reason for the superiority of the internet over other traditional means of communication is the possibility of change and transmission from one stage to another in a short period. This means that the internet is able to move from the use to the development of the use and then the development of means and innovation as the innovation of the internet is a logical product of the interaction of the user with the network. The internet invests all the proposals and ideas and does not ignore any even if it is simple. This is represented in social networking sites which in fact reflects personal emotio

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jun 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Probabilistic Model building using the Transformation Entropy for the Burr type –xii Distribution
...Show More Authors

Entropy define as uncertainty measure has been transfared by using the cumulative distribution function and reliability function for the Burr type – xii. In the case of data which suffer from volatility to build a model the probability distribution on every failure of a sample after achieving limitations function, probabilistic distribution. Has been derived formula probability distribution of the new transfer application entropy on the probability distribution of continuous Burr Type-XII and tested a new function and found that it achieved the conditions function probability, been derived mean and function probabilistic aggregate in order to be approved in the generation of data for the purpose of implementation of simulation

... Show More
View Publication Preview PDF
Crossref