Many problems were encountered during the drilling operations in Zubair oilfield. Stuckpipe, wellbore instability, breakouts and washouts, which increased the critical limits problems, were observed in many wells in this field, therefore an extra non-productive time added to the total drilling time, which will lead to an extra cost spent. A 1D Mechanical Earth Model (1D MEM) was built to suggest many solutions to such types of problems. An overpressured zone is noticed and an alternative mud weigh window is predicted depending on the results of the 1D MEM. Results of this study are diagnosed and wellbore instability problems are predicted in an efficient way using the 1D MEM. Suitable alternative solutions are presented ahead to the drilling process commences in the future operations.
Abstract
Objective of this research focused on testing the impact of internal corporate governance instruments in the management of working capital and the reflection of each of them on the Firm performance. For this purpose, four main hypotheses was formulated, the first, pointed out its results to a significant effect for each of corporate major shareholders ownership and Board of Directors size on the net working capital and their association with a positive relation. The second, explained a significant effect of net working capital on the economic value added, and their link inverse relationship, while the third, explored a significant effect for each of the corporate major shareholders ownershi
... Show More