Preferred Language
Articles
/
joe-839
Building 1D Mechanical Earth Model for Zubair Oilfield in Iraq
...Show More Authors

Many problems were encountered during the drilling operations in Zubair oilfield. Stuckpipe, wellbore instability, breakouts and washouts, which increased the critical limits problems, were observed in many wells in this field, therefore an extra non-productive time added to the total drilling time, which will lead to an extra cost spent. A 1D Mechanical Earth Model (1D MEM) was built to suggest many solutions to such types of problems. An overpressured zone is noticed and an alternative mud weigh window is predicted depending on the results of the 1D MEM. Results of this study are diagnosed and wellbore instability problems are predicted in an efficient way using the 1D MEM. Suitable alternative solutions are presented ahead to the drilling process commences in the future operations.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Mar 06 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Building HEC-RAS model to detect the areas of Water Cycle Interruption in river stream and their sections
...Show More Authors

The purpose of this paper is to build a simulation model by using HEC-RAS software to simulate the reality of water movement in the main river of Basra City (South of Iraq) which is known as Siraji-Khoura River. The main objective of the simulation is to detect areas where the water cycle is interrupted in some stations of the river stream, as this river has become an outlet for the disposal of sewage, leading to pollution and causing weakness in some sections of the river & obstructing the water cycle that takes place between this river and Shatt al – Arab river. A field survey data of the river and its banks were adopted to derive the grades, longitudinal and cross sections of the river, these data included three-dimensional coordinates

... Show More
View Publication
Scopus (6)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sun Apr 11 2021
Journal Name
Environment, Development And Sustainability
Developing a system for assessing the sustainability in school building projects
...Show More Authors

View Publication
Crossref (8)
Clarivate Crossref
Publication Date
Tue Dec 01 2020
Journal Name
Marine And Petroleum Geology
Chemical and isotope composition of the oilfield brines from Mishrif Formation (southern Iraq): Diagenesis and geothermometry
...Show More Authors

View Publication
Crossref (19)
Crossref
Publication Date
Sat May 01 2021
Journal Name
Journal Of Physics: Conference Series
Finite element analysis of seepage for Kongele earth dam Using Geo- Studio software
...Show More Authors
Abstract<p>Seepage occurs under or inside structures or in the place, where they come into contact with the sides under the influence of pressure caused by the difference in water level in the structure U / S and D / S. This paper is designed to model seepage analysis for Kongele (an earth dam) due to its importance in providing water for agricultural projects and supporting Tourism sector. For this purpose, analysis was carried out to study seepage through the dam under various conditions. Using the finite element method by computer program (Geo-Studio) the dam was analysed in its actual design using the SEEP / W 2018 program. Several analyses were performed to study the seepage across Kongele </p> ... Show More
View Publication
Scopus (4)
Crossref (5)
Scopus Crossref
Publication Date
Thu Sep 10 2020
Journal Name
Diyala Journal Of Engineering Sciences
Finite Element Analysis of Seepage for Hemrin Earth Dam Using Geo-Studio Software
...Show More Authors

Finite Element Approach is employed in this research work to solve the governing differential equations related to seepage via its foundation's dam structure. The primary focus for this reason is the discretization of domain into finite elements through the placement of imaginary nodal points and the discretization of governing equations into an equation system; An equation for each nodal point or part, and unknown variables are solved. The SEEP / W software (program) is a sub-program of the Geo-Studio software, which is used by porous soil media to compensate for the problems of seepage. To achieve the research goals, a study was carried out on Hemrin dam, which located in the Diyala River 100 km northeast of Baghdad, Iraq. Thus, o

... Show More
View Publication
Crossref (8)
Crossref
Publication Date
Thu Dec 01 2022
Journal Name
Journal Of Engineering
The Effectiveness of a Simulation Model of Thermal Insulation in Building Materials Using Cellulose Extracted from Agricultural Waste in Baghdad
...Show More Authors

This study found that one of the constructive, necessary, beneficial, most effective, and cost-effective ways to meet the great challenge of rising energy prices is to develop and improve energy quality and efficiency. The process of improving the quality of energy and its means has been carried out in many buildings and around the world. It was found that the thermal insulation process in buildings and educational facilities has become the primary tool for improving energy efficiency, enabling us to improve and develop the internal thermal environment quality processes recommended for users (student - teacher). An excellent and essential empirical study has been conducted to calculate the fundamental values ​​of the

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Tue Jan 31 2023
Journal Name
Iraqi Geological Journal
Geological Model for Jeribe/Euphrates Formation, Tertiary Reservoir in Qaiyarah Oil Field, North of Iraq
...Show More Authors

Visualization of subsurface geology is mainly considered as the framework of the required structure to provide distribution of petrophysical properties. The geological model helps to understand the behavior of the fluid flow in the porous media that is affected by heterogeneity of the reservoir and helps in calculating the initial oil in place as well as selecting accurate new well location. In this study, a geological model is built for Qaiyarah field, tertiary reservoir, relying on well data from 48 wells, including the location of wells, formation tops and contour map. The structural model is constructed for the tertiary reservoir, which is an asymmetrical anticline consisting of two domes separated by a saddle. It is found that

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Nov 30 2024
Journal Name
Iraqi Journal Of Science
Utilizing the Gravity Method to Detect the Potential Effect of the Salt Dome in the Nahr Omar Oilfield, Southern Iraq
...Show More Authors

Geophysics is one of the branches of Earth sciences and deals with studying the Earth's interior by studying the variation of physical properties within rock layers. Applied geophysics depends on procedures that involve the measurements of potential fields, such as the gravitational method. One of the significant oil fields in southern Iraq is represented by the Nahr Omar structure. A power spectrum analysis (SPA) technique was used to collect gravity data within the chosen oil field area in order to confirm the salt dome in the subsurface layers. The analysis of SPA resulted from six surfaces representing the gravity variation values of the depths (m)14300, 3780, 3290, 2170, 810, and 93.5. Gravity surfaces have been converted to de

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Journal Of Economics And Administrative Sciences
Predicting Social Security Fund compensation in Iraq using ARMAX Model
...Show More Authors

Time series have gained great importance and have been applied in a manner in the economic, financial, health and social fields and used in the analysis through studying the changes and forecasting the future of the phenomenon. One of the most important models of the black box is the "ARMAX" model, which is a mixed model consisting of self-regression with moving averages with external inputs. It consists of several stages, namely determining the rank of the model and the process of estimating the parameters of the model and then the prediction process to know the amount of compensation granted to workers in the future in order to fulfil the future obligations of the Fund. , And using the regular least squares method and the frequ

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 12 2021
Journal Name
Innovative Infrastructure Solutions
Facilitating claims settlement using building information modeling in the school building projects
...Show More Authors

View Publication
Scopus (10)
Crossref (8)
Scopus Clarivate Crossref