Punching Shear Behavior of Reinforced Concrete Slabs under Fire using Finite Elements
...Show More Authors

The main aim of this paper is studied the punching shear and behavior of reinforced concrete slabs exposed to fires, the possibility of punching shear failure occurred as a result of the fires and their inability to withstand the loads. Simulation by finite element analysis is made to predict the type of failure, distribution temperature through the thickness of the slabs, deformation and punching strength. Nonlinear finite element transient thermal-structural analysis at fire conditions are analyzed by ANSYS package. The validity of the modeling is performed for the mechanical and thermal properties of materials from earlier works from literature to decrease the uncertainties in data used in the analysis. A parametric study was adopted in this study,  it has many factors such as the ratios of length to thickness, fire temperature, time exposed to fire, concrete compressive strength, area exposed to fires and type of support. It can be concluded from this research the significant factors that affect the punching shear strength. However, the increasing ratio of length to thickness may be lead to increasing the deflection more than 123% at fire condition. Also, the increasing temperature leads to increasing the deflection about 40% at fire condition.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Aug 01 2020
Journal Name
Journal Of Constructional Steel Research
Demountable steel-concrete composite beam with full-interaction and low degree of shear connection
...Show More Authors

It is suitable to use precast steel-concrete composite beams to quickly assemble a bridge or a building, particularly in isolated regions where cast-in-situ concrete is not a practical option. If steel-concrete composite beams are designed to allow demountability, they can also be extremely useful in the aftermath of natural disasters, such as earthquakes or flooding, to replace damaged infrastructure. Furthermore, rapid replacement of slabs is extremely beneficial in case of severe deterioration due to long-term stressors such as fatigue or corrosion. The only way to rapidly assemble and disassemble a steel-concrete composite structure is to use demountable shear connectors to connect/disconnect the steel beams to/from the concrete slab. I

... Show More
View Publication
Scopus (41)
Crossref (32)
Scopus Clarivate Crossref
Publication Date
Sat Mar 31 2018
Journal Name
Journal Of Engineering
Seismic Response of Nonseismically Designed Reinforced Concrete Low Rise Buildings
...Show More Authors

In this paper, the time-history responses of a square plan two-story reinforced concrete prototype building, considering the elastic and inelastic behavior of the materials, were studied numerically. ABAQUS software was used in three-dimensional (3D) nonlinear dynamic analysis to predict the inelastic response of the buildings. Concrete Damage Plasticity Model (CDPM) has been used to model the inelastic behavior of the reinforced concrete building under seismic excitation. The input data included geometric information, material properties, and the ground motion. The building structure was designed only for gravity load according to ACI 318 with

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 01 2021
Journal Name
Civil Engineering Journal
Structural Behavior of BubbleDeck Slab under Uniformly Distributed Load
...Show More Authors

In structural construction fields, reducing the overall self-weight of the structure is considered a primary objective and substantial challenge in the civil engineering field, particularly in earthquake-affected buildings and tall buildings. Different techniques were implemented to attain this goal; one of them is setting voids in a specific position through the structure, just like a voided slab or BubbleDeck slab. The main objective of this research is to study the structural behavior of BubbleDeck reinforced concrete slabs under the effect of static uniformly distributed load. The experimental program involved testing five fixed-end supported two-way solid and BubbleDeck slabs of dimensions 2500×2500×200 mm. The considered par

... Show More
Scopus (8)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Sun Aug 01 2021
Journal Name
Journal Of Composites For Construction
Prediction of Concrete Cover Separation in Reinforced Concrete Beams Strengthened with FRP
...Show More Authors

View Publication
Publication Date
Sun Aug 01 2021
Journal Name
Journal Of Composites For Construction
Prediction of Concrete Cover Separation in Reinforced Concrete Beams Strengthened with FRP
...Show More Authors

Scopus (17)
Crossref (15)
Scopus Clarivate Crossref
Publication Date
Mon Aug 01 2022
Journal Name
Journal Of Engineering
The Behavior of Bond Strength between Rebar and Concrete in Rubberized Concrete : -
...Show More Authors

Through an experimental program of eighteen specimens presented in this paper, the bond strength between reinforcing bar and rubberized concrete was produced by adding waste tire rubber instead of natural aggregate. The fine and coarse aggregate was replaced in 0%, 25%, and 50% with the small pieces of a waste tire. Natural aggregate replacement ratio, rebar size, embedded rebar length, the rebar yield stress of rebar, cover, and concrete compressive strength were studied in this investigation. Ultimate bond stress, bond stress-slip response, and failure modes were presented. The experimental results reported that a reduction of 19% in bond strength was noticed in 50% replaced rubberized concrete compared with convention

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun May 01 2016
Journal Name
Journal Of Engineering
Three-Dimensional Finite Element Simulation of the Buried Pipe Problem in Geogrid Reinforced Soil
...Show More Authors

Buried pipeline systems are commonly used to transport water, sewage, natural oil/gas and other materials. The beneficial of using geogrid reinforcement is to increase the bearing capacity of the soil and decrease the load transfer to the underground structures.

This paper deals with simulation of the buried pipe problem numerically by finite elements method using the newest version of PLAXIS-3D software. Rajkumar and Ilamaruthi's study, 2008 has been selected to be reanalyzed as 3D problem because it is containing all the properties needed by the program such as the modulus of elasticity, Poisson's ratio, angle of internal friction. It was found that the results

... Show More
View Publication Preview PDF
Publication Date
Sat Oct 01 2022
Journal Name
Structures
Behaviour and design of the ‘lockbolt’ demountable shear connector for sustainable steel-concrete composite structures
...Show More Authors

In order to promote sustainable steel-concrete composite structures, special shear connectors that can facilitate deconstruction are needed. A lockbolt demountable shear connector (LB-DSC), including a grout-filled steel tube embedded in the concrete slab and fastened to a geometrically compatible partial-thread bolt, which is bolted on the steel section's top flange of a composite beam, was proposed. The main drawback of previous similar demountable bolts is the sudden slip of the bolt inside its hole. This bolt has a locked conical seat lug that is secured inside a predrilled compatible counter-sunk hole in the steel section's flange to provide a non-slip bolt-flange connection. Deconstruction is achieved by demounting the tube from the t

... Show More
View Publication Preview PDF
Scopus (18)
Crossref (18)
Scopus Clarivate Crossref
Publication Date
Sun Mar 01 2015
Journal Name
Journal Of Engineering
Retrofitting of Reinforced Concrete Damaged Short Column Exposed to High Temperature
...Show More Authors

Experimental research was carried out to investigate the performance of CFRP wrapping jackets used for retrofitting twelve square reinforced concrete (CR) column specimens damaged by exposure to fire flame, at different temperatures of  300, 500 and 700ºC, except for two specimens that were not burned. The specimens were then loaded axially till failure after gradual or sudden cooling. The specimens were divided into two groups containing two main reinforcement ratios, ρ= 0.0314 and ρ= 0.0542. This was followed by the retrofitting procedure that included wrapping all the specimens with two layers of CFRP fabric sheets. The test results of the retrofitted specimens showed that the fire damaged RC

... Show More
View Publication Preview PDF
Publication Date
Thu Sep 01 2022
Journal Name
Journal Of Engineering
Experimental Investigation of Crack Initiation and Growth in Concrete Slabs Placed Directly on Clayey Soil
...Show More Authors

The main objective of this study is to examine the impact of moisture concrete of clayey soil on the concrete slabs placed directly over it. This experimental study presents the mechanical properties of the concrete slab when placed on different clayey soil moisture content ranging from 0% to the optimum moisture content of 35%. The tests were performed on soil concrete specimens of 25*30*50 mm exposed to sprayed water curing conditions for 28 days. Tests of compressive strength, ultrasonic pulse velocity, crack depth and crack width were investigated through this paper. An ejection relationship between compressive strength of concrete and water content in the soil was observed, with a 26% increase with water increasing from 0% to 35%. T