Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects
...Show More Authors

The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identify the values and principles of Agile project management, which can be applied in the Iraqi construction industry to be adopted it as a new method to manage the construction projects in Iraq. The researcher reviewed the relevant literature to define the method of Agile project management and its methods and impact on the construction project. Then, the researcher conducted a questionnaire survey of a sample of engineers' experts who work in four main parties in the construction project: (beneficiary, supervising, designer, and contractor). The results of this survey showed that it is possible to apply the four values of Agile project management for managing the Iraqi construction projects, and can apply eleven of the twelve principles of Agile project management for managing the Iraqi construction projects.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Engineering
Economic Benefits for the Application of Standards of Sustainability in Construction Projects
...Show More Authors

In this research, that been focused on the most important economic benefits expected when applying the three standards of sustainability in construction projects (economic, environmental and social). Fuzzy AHP, a multi-decision decision-making technique for evaluating construction projects. Which when used we get the speed and accuracy in the results. Using this technique will reduce uncertainties decisions significantly (fuzzy environment), that found in most projects .The results of the data analysis showed  that the economic standards take the greatest relative importance (60%) among the three sustainability standards. Therefore, the implementation of any standards need a cost so the economic benefit of any proje

... Show More
View Publication Preview PDF
Crossref (7)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identification of the main causes of risks in engineering procurement construction projects
...Show More Authors
Abstract<p>Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected <italic>via</italic> well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects throu</p> ... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Thu Jun 01 2023
Journal Name
Journal Of Engineering
Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints
...Show More Authors

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most ef

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Study on Safety Construction Management Plan
...Show More Authors

After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were ra

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Thu Jun 20 2019
Journal Name
Baghdad Science Journal
The Impact of Agile Methodologies and Cost Management Success Factors: An Empirical Study
...Show More Authors

Software cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on

... Show More
View Publication Preview PDF
Crossref (4)
Clarivate Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Wed Jan 01 2020
Journal Name
Periodicals Of Engineering And Natural Sciences
Using modified earned value for cost control in construction projects
...Show More Authors

Scopus (13)
Scopus
Publication Date
Sat Apr 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
Risk Analysis of Projects Accordance with the Professional Project Management System: A case- Study Mansur Construction Contracting Company here
...Show More Authors

The research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref