Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of completed project meets those requirements.

Therefore it has been necessary to focus in this paper on the design stage also demonstrated and analysis the most important risk facing this stage and their impact on a construction project by introducing a questionnaire to identify the most important risks factors at this stage affecting on the project.

The paper had been shown that the effect of the design stage on Lump sum type of project contract was higher than the unit price, while the most important factor effect on a project its fast response of design team to prepare the design documents in order to facilitate the workflow and sequence of execution with effect level 3.714.

 

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Jan 01 2019
Journal Name
Cpwr
Development of a workforce sustainability model for construction
...Show More Authors

Publication Date
Sat Sep 21 2019
Journal Name
Journal Of The College Of Education For Women
Measuring the Social Phobia Fifth-Secondary Stage Female Students
...Show More Authors

The current research aims to know the measurement of the fifth- secondary stage female  students' affliction with the social phobia . The research is confined to General directorate of Education in Baghdad / Al-Karkh/2 / for the academic year 2015-2016 and fifth-secondary stage female students. It has been used descriptive method and  exposed theoretical sides and previous studies concerning with the  social phobia.The procedures of the research include the application of the  social phobia scale on random sample of  fifth- secondary stage female  students ( both  branches scientific and literary). The current study has concluded  that the  fifth- secondary stage female  students have&nbs

... Show More
View Publication Preview PDF
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
...Show More Authors

Abstract

          The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the     life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's  management  experience is how to achieve thes

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Dec 01 2020
Journal Name
Journal Of Economics And Administrative Sciences
Select the optimal project by using two methods of analytic hierarchy and goal programming
...Show More Authors

      The aim of this research is to solve a real problem in the Department of Economy and Investment in the Martyrs establishment, which is the selection of the optimal project through specific criteria by experts in the same department using a combined mathematical model for the two methods of analytic hierarchy process and goal programming, where a mathematical model for goal programming was built that takes into consideration the priorities of the goal criteria by the decision-maker to reach the best solution that meets all the objectives, whose importance was determined by the hierarchical analysis process. The most important result of this research is the selection of the second pro

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue May 24 2022
Journal Name
International Journal Of Occupational Safety And Ergonomics
Contributions of safety critical success factors and safety program elements to overall project success
...Show More Authors

View Publication
Scopus (23)
Crossref (21)
Scopus Clarivate Crossref
Publication Date
Tue Jan 01 2019
Journal Name
Advances In Informatics And Computing In Civil And Construction Engineering: Proceedings Of The 35th Cib W78 2018 Conference: It In Design, Construction, And Management
Technology alternatives for workplace safety risk mitigation in construction: Exploratory study
...Show More Authors

Publication Date
Sat Aug 01 2020
Journal Name
Practice Periodical On Structural Design And Construction
Case Study to Evaluate Work-Zone Safety Technologies in Highway Construction
...Show More Authors

View Publication
Scopus (17)
Crossref (17)
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Factors affecting time and cost trade-off in multiple construction projects
...Show More Authors

Scopus (8)
Scopus
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Mon Mar 01 2021
Journal Name
Iop Conference Series: Materials Science And Engineering
Structural Design According to Constructal Theory in Architecture
...Show More Authors
Abstract<p>Constructal theory plays a major role in the conceptual design stage of the structural system in architecture. It provides a conceptual framework for predicting the form depending on natural systems to model those systems geometrically according to the constructal law that works in two directions: the first is towards predicting the general form of the structural system, and the second is the physical application of the law in the process of detailed design of the parts of the system. The aim of this paper is to determine the mechanism adopted in the structural design according to the constructal theory, assuming that the structural design according to the constructal theory achieves </p> ... Show More
View Publication Preview PDF
Crossref (2)
Crossref