Preferred Language
Articles
/
joe-489
Regression Analysis Models to Predict the 28 -day Compressive Strength Using Accelerated Curing Tests
...Show More Authors

Regression analysis models are adopted by using SPSS program to predict the 28-day compressive strength as dependent variable and the accelerated compressive strength as independent variable. Three accelerated curing method was adopted, warm water (35ºC) and autogenous according to ASTM C C684-99 and the British method (55ºC) according to BS1881: Part 112:1983. The experimental concrete mix design was according to ACI 211.1. Twenty eight concrete mixes with slump rang (25-50) mm and (75-100)mm for rounded and crushed coarse aggregate with cement content (585, 512, 455, 410, 372 and 341)Kg/m3.

      The experimental results showed that the accelerated strength were equal to about (0.356), (0.492) and (0.595) of the 28-day compressive strength for warm water, autogenous and British curing methods respectively. A statistical regression analysis using SPSS program is implemented for the experimental results of the 28-day compressive strength ranging from (16 to 55.2)Mpa and accelerated strength for different curing methods. The linear models with high R2 and F-value are adopted for different curing methods while the Power model with constant is the best model for non parametric analysis.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Jun 30 2008
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Optimal Quantitave and Distributive Analysis of Thermal Pollution due to Heated Water Released to Rivers
...Show More Authors

To reduce the effects of discharging heated water disposed into a river flow by a single thermal source, two parameters were changed to get the minimum effect using optimization. The first parameter is to distribute the total flow of the heated water between two disposal points (double source) instead of one and the second is to change the distance between these two points. In order to achieve the solution, a two dimensional numerical model was developed to simulate and predict the changes in temperature distribution in the river due to disposal of the heated water using these two points of disposal.
MATLAB-7 software was used to build a program that could solve the governing partial equations of thermal pollution in rivers by using t

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Jun 26 2022
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The role of banking effort tests in the face of monetary credit risk and its impact on the profits and adequacy of the bank’s capital : / a case study of Sumer Commercial Bank for the period from 2015 to 2020
...Show More Authors

The research seeks to identify the proposed scenarios to predict and ward off monetary credit risks that the bank is exposed to in the future, using the banking stress tests model, and showing their impact on capital adequacy and profitability ratio,To achieve this purpose, Sumer Commercial Bank was taken as a case study, and mathematical equations were used to extract the results. Low percentage of profits and returns, strictness in the process of granting credit and financing operations in order to reduce credit risks.

View Publication Preview PDF
Publication Date
Fri Sep 01 2017
Journal Name
Ce/papers
16.15: Experimental evaluation of a novel demountable shear connector for accelerated repair or replacement of precast steel‐concrete composite bridges
...Show More Authors

A novel demountable shear connector for precast steel‐concrete composite bridges is presented. The connector uses high‐strength steel bolts, which are fastened to the top flange of the steel beam with the aid of a special locking nut configuration that prevents slip of bolts within their holes. Moreover, the connector promotes accelerated construction and overcomes typical construction tolerances issues of precast structures. Most importantly, the connector allows bridge disassembly, and therefore, can address different bridge deterioration scenarios with minimum disturbance to traffic flow, i.e. (i) precast deck panels can be rapidly uplifted and replaced; (ii) connectors can be rapidly removed and replaced; and (iii) steel beams can b

... Show More
View Publication
Crossref (2)
Crossref
Publication Date
Sun Nov 02 2025
Journal Name
Journal Of Physical Education
Proposed Exercises Using Flexible Resisters And Their Effect On Developing Strength Endurance And The Performance of Some Offensive Skills In Youth Basketball
...Show More Authors

View Publication
Publication Date
Sun Nov 02 2025
Journal Name
Journal Of Physical Education
Unbalanced Strength Exercises Using Designed Tools and Their Effects on Some Biomechanical Variables in Young 110m Hurdles
...Show More Authors

View Publication
Publication Date
Sat Dec 31 2022
Journal Name
Journal Of Economics And Administrative Sciences
Estimation of Causal Effect of treatment via Fuzzy Regression Discontinuity Designs
...Show More Authors

In some cases, researchers need to know the causal effect of the treatment in order to know the extent of the effect of the treatment on the sample in order to continue to give the treatment or stop the treatment because it is of no use. The local weighted least squares method was used to estimate the parameters of the fuzzy regression discontinuous model, and the local polynomial method was used to estimate the bandwidth. Data were generated with sample sizes (75,100,125,150 ) in repetition 1000. An experiment was conducted at the Innovation Institute for remedial lessons in 2021 for 72 students participating in the institute and data collection. Those who used the treatment had an increase in their score after

... Show More
View Publication Preview PDF
Publication Date
Mon Dec 10 2018
Journal Name
Day 1 Mon, December 10, 2018
Wellbore Trajectory Optimization Using Rate of Penetration and Wellbore Stability Analysis
...Show More Authors

Drilling deviated wells is a frequently used approach in the oil and gas industry to increase the productivity of wells in reservoirs with a small thickness. Drilling these wells has been a challenge due to the low rate of penetration (ROP) and severe wellbore instability issues. The objective of this research is to reach a better drilling performance by reducing drilling time and increasing wellbore stability.

In this work, the first step was to develop a model that predicts the ROP for deviated wells by applying Artificial Neural Networks (ANNs). In the modeling, azimuth (AZI) and inclination (INC) of the wellbore trajectory, controllable drilling parameters, unconfined compressive strength (UCS), formation

... Show More
View Publication
Publication Date
Mon Dec 10 2018
Journal Name
Day 1 Mon, December 10, 2018
Wellbore Trajectory Optimization Using Rate of Penetration and Wellbore Stability Analysis
...Show More Authors

Drilling deviated wells is a frequently used approach in the oil and gas industry to increase the productivity of wells in reservoirs with a small thickness. Drilling these wells has been a challenge due to the low rate of penetration (ROP) and severe wellbore instability issues. The objective of this research is to reach a better drilling performance by reducing drilling time and increasing wellbore stability.

In this work, the first step was to develop a model that predicts the ROP for deviated wells by applying Artificial Neural Networks (ANNs). In the modeling, azimuth (AZI) and inclination (INC) of the wellbore trajectory, controllable drilling parameters, unconfined compressive strength (UCS), formation

... Show More
View Publication
Crossref (12)
Crossref