In this study, the effect of construction joints on the performance of reinforced concrete beams was experimentally investigated. Seven beam specimens, with dimensions of 200×100×1000 mm, were fabricated. The variables were considered including; the location and configuration of the joints. One beam was cast without a joint (Reference specimen), two specimens were fabricated with a one horizontal joint located either at tension, or compression zone. The fourth
beam had two horizontal joints placed at tension, and compression area. The remaining specimens were with one or two inclined joints positioned at the shear span or beam’s mid-span. The specimens were subjected to a monotonic central concentrated loading until the failure. The results of the experimental program indicated that the best location of the construction joint is at the compression zone. The presence of the horizontal construction joint at tension zone resulted
in a reduction in strength of beams, about 5% - 7.5%, relative to the reference beam. However, the inclined construction joint had a little effect on the collapse load of beams, about 1.25% -2.5%.
Joints are among the most widespread geologic structures as they are found in most each exposure of rock. They differ greatly in appearance, dimensions, and arrangement, besides they occur in quite different tectonic environments. This study is important because joints provide evidence on what kind of stress produced them (history of deformation) and also because they change the characteristics of the rocks in which they occur. The Measured data of joints from the studied area which are located in the high folded zone – Northeast of Iraq, were classified according to their relationship with the tectonic axes by projecting them stereographically using Schmidt net in GEOrient ver.9.5.0 software. The joint systems revealed the orientation of
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreContracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag
... Show MoreBackground: The daily cleaning routine of the silicone maxillofacial prostheses by the patient may cause some alteration in the materials properties. The purpose of the present study was to investigate the effect of different disinfection procedures on some properties of silicon dioxide reinforced Cosmesil M511 HTV maxillofacial silicone. Materials and Methods: One hundred and sixty (160) specimens were prepared by mixing 5% SiO2 nano particles and 0.5% intrinsic cream color into the silicone polymer according to manufacturer's instructions. Specimens were divided into 4 groups according to the performed test (tear strength, surface hardness, surface roughness and color) with 40 specimens each. Each group was further subdivided according to
... Show MoreAbstract:
This study deals with the influence of the industrial buyer behavior in Channels of distribution. It concentrates on one section of management levels in the company. Which is that of administrative managers The research problem is attempt to study and analysis the influence of industrial buyer behavior in channels of distribution.. The aiming at achieving a number of applicable goals depending on one major hypotheses I set a questionnaire in collecting the data and information relating to the study، which was distributed to sample of ( 30) department manager heads of section states company . In order to process the data resorted to many statistical methods such as arithmetic means the sta
... Show MoreBearing capacity of a concrete pile in fine grained cohesive soils is affected by the degree of saturation of the surrounding soil through the contribution of the matric suction. In addition, the embedded depth and the roughness of the concrete pile surface (expressed as British Pendulum Number BPN) also have their contribution to the shear strength of the concrete pile, consequently its bearing capacity. Herein, relationships among degree of saturation, pile depth, and surface roughness, were proposed as a mathematical model expressed as an equation where the shear strength of a pile can be predicted in terms of degree of saturation, depth, and BPN. Rel