The construction sector is considered an important and influential pivot in the national economy of any country. Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during technology transfer may lead to infractions in the company's budget. This manuscript aims to investigate the direct and indirect costs of transferring technology and the major factors constrained by this process. This work adopted a theoretical study and investigated the opinions of experts and engineers (by questionnaire) working in different construction sites. This Manuscript showed that the largest weight of the cost for both modern equipment and counsulant/designers is a direct cost and indirect cost, respectively, for transferring technology in the construction sector.
The research aims to use performance indicators and financial criteria in evaluating the economic feasibility of the company's insurance portfolios. In addition to identifying the strengths and weaknesses in portfolio's performance to enhance the strengths and address the weaknesses. This is consistent with research problem that dealt with the performance indicators, economic feasibility of company's portfolios and contributing to their improvement, reducing the financial and insurance risks associated with company's business. The research’ sample is represented by the Iraqi Insurance Company as it is one of the oldest financial institutions operating in the insurance sector. It has identified (5) insurance portfolios (marine, engineer
... Show MoreThe research aims to demonstrate the impact of the acceptable solvency of the National Insurance Company on the investment activity in it, as the research assumes the existence of a statistically significant relationship between the acceptable solvency variable and the investment variable, and the researcher took the National Insurance Company as a place to conduct the research, as it is the first insurance company Watania was established in the fifties of the last century, and it has a long history in the practice of investment activity, and the company’s financial statements for the period from (2010-2019) were relied on, and the annual reports issued by the company as well as records are tools for gathering information, and
... Show MoreThis work presents an experimental study of heat transfer and flow of distilled water and metal oxide nanofluid Fe3O4-distilled water at concentrations of (φ = 0.3, 0.6, 0.9 %) by volume in a horizontal pipe with constant magnetic field. All the tests are carried out with Reynolds number range (2900-9820) and uniform heat flux (11262-19562 W/m2). The results show that, the nanofluid concentration and magnetic intensity increase, the Nusselt number increases. The maximum enhancement in Nusselt number with magnetic nanofluid is (5.4 %, 26.4 %, 42.7 %) for volume concentration (0.3, 0.6, 0.9 %) respectively. The enhancement is maximized with magnetic intensity (0.1, 0.2, 0.3 tesla) respectively to (43.9, 44
... Show MoreDelays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in
... Show MoreIn this research, that been focused on the most important economic benefits expected when applying the three standards of sustainability in construction projects (economic, environmental and social). Fuzzy AHP, a multi-decision decision-making technique for evaluating construction projects. Which when used we get the speed and accuracy in the results. Using this technique will reduce uncertainties decisions significantly (fuzzy environment), that found in most projects .The results of the data analysis showed that the economic standards take the greatest relative importance (60%) among the three sustainability standards. Therefore, the implementation of any standards need a cost so the economic benefit of any proje
... Show MoreMany risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
The current research aims to identify the most important green productivity tools GPT and the possibility of applied in industrial companies in general and the companies operating in the province of Nineveh, in particular, as well as the study of some personality characteristics and functional, which is believed to be an impact on the application of these tools in industrial companies. Accordingly, the research community of managers in the company of medicines and medical supplies ready-made clothes _ operating in the province of Nineveh, who are (80) while the manager was subjected to research procedures (49) Director representing (61.25%)
... Show MoreThe researcher concluded that it consists of several types of structures, where the intellectual structure related to the choice of the idea, its treatment, its effect, the choice of the topic, the way ideas are addressed and presented in the film, and then the dramatic structure of the film's characters, the formulation of its events, its dramatic composition, its temporal arrangement, the identification of the parties to the conflict and their management, then these are formulated. Visions and ideas through the visual and audio signal systems, which work to highlight the stylistic features in the character of the film director.
Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo