The construction sector is considered an important and influential pivot in the national economy of any country. Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during technology transfer may lead to infractions in the company's budget. This manuscript aims to investigate the direct and indirect costs of transferring technology and the major factors constrained by this process. This work adopted a theoretical study and investigated the opinions of experts and engineers (by questionnaire) working in different construction sites. This Manuscript showed that the largest weight of the cost for both modern equipment and counsulant/designers is a direct cost and indirect cost, respectively, for transferring technology in the construction sector.
This research after financial ratios in the detection of fraud to the financial statements published which enables specialists from the work of their studies and their conclusions to obtain the information they seek on the activities of the entity. Has provided researchers what these relics They then field study to test the validity and sincerity of the findings of the suggestions that have been upheld the need to study all financial ratios extracted in general, organized and used in decision-making processes necessary administrative.And that the financial management attention more financial analysis and extraction of financial ratios and compare them with industry standards taken from historical norms
Abstract
The basic orientation of the research is an attempting to apply the cost determining method according in the contract sector projects for Al- Iraq ceneral company, that this subject has a big value according to its modernity and its influence on the future and the eaning of the company.
The research aims to find out the effect of the method for determining cost based on the activity in determining the cost of the construction sector projects.The research was conducted in Iraq General Company for the implementation of irrigation projects. Bani search on three assumptions, the first is (that the application of the method for determining the cost on the basis of
... Show MoreConstruction is a hazardous industry with a high number of injuries. Prior research found that many industry injuries can be prevented by implementing an effective safety plan if prepared and maintained by qualified safety personnel. However, there are no specific guidelines on how to select qualified construction safety personnel and what criteria should be used to select an individual for a safety position in the United States (US) construction industry. To fill this gap in knowledge, the study goal was to identify the desired qualifications of safety personnel in the US construction industry. To achieve the study goal, the Delphi technique was used as the main methodology for determining the desired qualifications for constructio
... Show MoreEffective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul
The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show MoreThe research problem is that most of the construction projects exceed the planned value, due to the failure to implement the plans on time. The current study aims to monitor the implementation of the project and for each of the executed tasks of the table of quantities in order to detect deviations at the time they occur, evaluate the time and cost performance, and then identify the areas of waste and analyze the implementation of each task in order to diagnose the underlying problems and find possible and applicable solutions in the environment Iraqi. The research was applied in one of the companies specialized in the field of construction projects, and one of the most important conclusions reached is the possibility of applying
... Show MoreIn this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show MoreIn this paper, customers’ expectations are continually shifting due to the business environment’s growing competition and substantial changes. As a result, organisations no longer viewed it as a static objective but as an ever-evolving aim. From this vantage point, the research has explored the accounting literature in search of novel approaches to addressing the strategic dimensions of quality, cost and time. Getting them to respond positively to the customer’s requests also requires recognising their needs and controlling their impact on these dimensions. With the removal of operations that do not contribute any value to the product’s value chain and a reduction in manufacturing costs through continuous improvement, the ou
... Show More