The construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire survey was used as a data collection method. The participants in the survey were engineers from the Iraqi construction sector. The sample size was 121 engineers from 34 institutions with multidisciplinary backgrounds. The results showed that the engineers need to develop the training system and merge many methods and techniques in their institution to maximize the benefits using an integration model capable of dealing with the variable environment in construction, especially in developing countries like Iraq.
The study aims to clarify the impact of growth in the industrial sector on economic growth in the Iraqi economics according to the methodology of Kaldor for (2017-2030) , taking into consideration the effect of the accumulation of capital in the calculation of growth rates in the economy through productivity estimate of Total Factor Productivity (TFP) to growth in the economy, which is why the study assumes a formula to comply with the laws of Kaldor growth models developed requirements. This study is the most important to find out the development of the laws of Kaldor among Arabic studies, especially the first and third, so that the relationship between the growth of industrial production and economic growth as represented
... Show MoreCrop coefficient for cherries was evaluated by measure the water consumption in Michigan State to find its variation with time as the plant growth. Crop coefficients value (Kc) for cherries were predicated by Michigan State University (MSU) and also by Food and Agriculture Organization (FAO) according to consume of water through the season. In this paper crop coefficients for cherries are modified accordingly to the actual measurements of soil moisture content. Actual evapotranspiration (consumptive use) were measured by the soil moisture readings using Time Domain Reflectometers (TDR), and compared with the actual potential evapotranspiration that calculated by using modified Penman-Monteith equation which depends on metrological statio
... Show MoreThis study came for the reason that some project administrations still do not follow the appropriate scientific methods that enable them to perform their work in a manner that achieves the goals for which those projects arise, in addition to exceeding the planned times and costs, so this study aims to apply the methods of network diagrams in Planning, scheduling and monitoring the project of constructing an Alzeuot intersection bridge in the city of Ramadi, as the research sample, being one of the strategic projects that are being implemented in the city of Ramadi, as well as being one of the projects that faced during its implementation Several of problems, the project problem was studied according to scientific methods through the applica
... Show MoreThe normalized difference vegetation index (NDVI) is an effective graphical indicator that can be used to analyze remote sensing measurements using a space platform, in order to investigate the trend of the live green vegetation in the observed target. In this research, the change detection of vegetation in Babylon city was done by tracing the NDVI factor for temporal Landsat satellite images. These images were used and utilized in two different terms: in March 19th in 2015 and March 5th in 2020. The Arc-GIS program ver. 10.7 was adopted to analyze the collected data. The final results indicate a spatial variation in the (NDVI), where it increases from (1666.91 𝑘𝑚2) in 2015 to (1697.01 𝑘𝑚2)) in 2020 between the t
... Show MoreThe management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show MoreIntegrated project delivery is collaboratively applying the skills and knowledge of all participants to optimize the project's results, increase owner value, decrease waste, and maximize efficiency during the design, fabrication, and construction processes. This study aims to determine IPD criteria positively impacting value engineering. To do this, the study has considered 9 main criteria according to PMP classification that already covers all project phases and 183 sub-criteria obtained from theoretical study and expert interviews (fieldwork). In this study, the SPSS (V26) program was used to analyze the main criteria and sub-criteria priorities from top to bottom according to their values of the Relative Importance In
... Show MoreProjects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo
Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show More