A Program Applying Professional Safety Basics in Construction Projects
...Show More Authors

When industrial and  constructional renaissance started in the world, the great interest was going on towards the equipment’s,  which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry.

     The professional safety is concerned as restrict which aims to take care of humanitarian and material principles also to raise the production of these principles, in the aspect of safety, health and providing the suitable healthy condition to the worker so he can feel safety, confidence and sociological settle, this will increase the production. So In order to maintain the manpower of business risks and to enable them to fulfill their role better to increase production and improve the quality and maintain the machine and supporting the national economy and keep pace with industrial developments and technological came the idea of research to focus on the importance of studying the subject of occupational safety by conducting a field survey to see the reality of professional safety in the relevant departments and work sites and through a questionnaire on the subject and conduct personal interviews with those concerned in this area and to prepare a program for the application of professional safety for each resource (labor, machines, materials, money) in construction sites and departments concerned.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identification of the main causes of risks in engineering procurement construction projects
...Show More Authors
Abstract<p>Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected <italic>via</italic> well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects throu</p> ... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (3)
Clarivate Crossref
Publication Date
Wed Jul 01 2020
Journal Name
Journal Of Engineering
Examining sensitivity of financial performance at construction projects prequalification stage
...Show More Authors

Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial ‎requirements restrict the ‎contractors to meet minimum limits in financial criteria such as net worth, working capital and ‎annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 08 2024
Journal Name
Engineering, Technology &amp; Applied Science Research
Applying the Analytical Hierarchy Process to Identify the Challenges and Priorities of Reconstruction Projects in Iraq
...Show More Authors

Reconstruction project management in the cities of Mosul, Anbar, and Tikrit, in Iraq still faces major obstacles that impede the comprehensive performance of these projects. It is thus necessary to improve the arising challenge estimation in the implementation of reconstruction projects and evaluate their components: time, cost, quality, and scope. This study used the Analytical Hierarchy Process (AHP) to prioritize major and minor criteria in the influential causes of challenges and formulate a mathematical model to help decision-makers estimate them. Using the Super Decisions software, the final results indicated that changes in scope reached 40.8%, which is the greatest difficulty, followed by changes in cost at 27.6%, changes in

... Show More
View Publication
Crossref (1)
Scopus Crossref
Publication Date
Fri Jan 01 2021
Journal Name
E3s Web Of Conferences
Investigation the Opportunity of BIM with Agile Management Approach in Iraqi Construction Projects
...Show More Authors

The construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim

... Show More
View Publication
Crossref (4)
Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Application of Total Quality Management (TQM) Requirements in Risk Management in Construction Projects in Iraq
...Show More Authors

Total quality management  considers one of the modern scientific entrances  which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have  in a manner in which they can be addressed and find ways to avoid them in the future when repeated.                          &n

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identifying the selection criteria of design consultant for Iraqi construction projects
...Show More Authors
Abstract<p>The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Wed Mar 01 2023
Journal Name
Shift
Construction Safety Personnel Qualifications: The Impact of Education, Experience, and Certificate Programs
...Show More Authors

Publication Date
Sun Jul 01 2018
Journal Name
Journal Of Construction Engineering And Management
Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach
...Show More Authors

View Publication
Scopus (66)
Crossref (51)
Scopus Clarivate Crossref