The change in project cost, or cost growth, occurs from many factors, some of which are related to soil problem conditions that may occurs during construction and/or during site investigation period. This paper described a new soil improvement method with a minimum cost solution by using polymer fiber materials having a length of (3 cm) in both directions and (2.5 mm) in thickness, distributed in uniform medium dense .
sandy soil at different depths (B, 1.5B and 2B) below the footings. Three square footings has been used (5,7.5 and 10 cm) to carry the above investigation by using lever arm loading system design for such purposes.
These fibers were distributed from depth of (0.1B) below the footing base down to the investigated depth. It was found that the initial vertical settlement of footing was highly affected in the early stage of loading due to complex Soil-Fiber Mixture (SFM) below the footing. The failure load value for proposed model in any case of loading increased compared with the un-reinforced soil by increasing the depth of improving below the footing. The Bearing Capacity Ratio (BCR) for soil-fiber mixture has been increased by ratio of (1.4 to
2.5), (1.7 to 4.9), and (1.8 to 8) for footings (5, 7.5, and 10 cm) respectively. The yield load-settlement for soil-fiber mixture system started at settlement of about 1.1% B while the yield load in un-reinforced soil started at smaller percentage which reflects the benefits of using such fiber materialfor improving soil behavior. Comparison between experimental and predicted (calculated) settlement below the footings showed the difference in ranges were within accepted limits for foundation settlements design
Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie
Water supply networks are marred by serious risks of imperceptible pipeline leakage, posing sustainability and performance threats. This article highlights the use of vibratory signal features to get around the drawbacks of traditional methods in a highly detailed framework for leak detection based on CatBoost. demonstrated excellent diagnostic performance and carried out a thorough test performance evaluation on five leakage configurations . The expected system achieved an accuracy of 98.1% (variance (well within x/3% of expected):, beating traditional competitors such as Random Forest (97.3%) and Support Vector Machine (93.8%). For example, the area under the receiver-operating characteristic curve was 0.995, in
... Show MoreThis paper deals with prediction the effect of soil remoulding (smear) on the ultimate bearing capacity of driven piles. The proposed method based on detecting the decrease in ultimate bearing capacity of the pile shaft (excluding the share of pile tip) after sliding downward. This was done via conducting an experimental study on three installed R.C piles in a sandy clayey silt soil. The piles were installed so that a gap space is left between its tip and the base of borehole. The piles were tested for ultimate bearing capacity
according to ASTM D1143 in three stages. Between each two stages the pile was jacked inside the borehole until a sliding of about 200mm is achieved to simulate the soil remoulding due to actual pile driving. T
The primary objective of root canal therapy is adequate biomechanical preparation of root canal system followed by 3D obturation.in clinics we are encountered with several anatomical variations, which we need to manage efficiently. One of the major factors responsible for failure of root canal therapy is missed canals. Recent technological advances have given the clinician opportunity to identify anatomical variations and treat them to satisfaction.