A Longitudinal opening is used to construct hollow core beam is a cast in site or precast or pre stressed concrete member with continuous voids provided to reduce weight, cost and, as a side benefit, to use for concealed electrical or mechanical runs. Primarily is used as floor beams or roof deck systems. This study investigate the behavior of six beams (solid or with opening) of dimension (length 1000 x height 180 x width120mm) simply support under partial uniformly distributed load, four of these beam contain long opening of varied section (40x40mm) or (80x40mm). The effect of vertical steel reinforcing, opening size and orientations are investigated to evaluate the response of beams. The experimental behavior based on load-deflection measured at central and quarter of tension zones. The experimental test result shows the presence of Hollow decrease the load carrying capacity by about (37.14% to 58.33%) and increased the deflections by about (71.6% for (Hollow ratio 7.4%) to 75.5% for (Hollow ratio 14.8%)) for same applied load
compared with solid beams with the same properties. The increase shear steel reinforcing will decrease all the deformations at all stages of loading, but particularly after initial cracking and give enhancement in ultimate load capacity of beams by about 31.5% with increasing the amount of shear steel reinforcing by about 50%. Finally, ductility is increased in all cases under partial uniformly distributed load when hollow ratio decreased by about 50% or increased in shear steel reinforcing by about 50%
Risk identification and assessment can be analysed using many risk management tools. Fishbone diagram is one of these techniques which can be employed, for the identification of the causes behind the construction failure, which has become a phenomenon that often gets repeated in several projects. If these failures are not understood and handled scientifically, it may lead to disputes between the project parties. Additionally, the construction failure also leads to an increase in the project budget, which in turn causes a delay in the completion of the projects. Punching shear in reinforcement slab may be one of the reasons for construction failures. However, there are many doubts about other causes that lead to this failure as w
... Show MoreOne of the Iraqi geotechnical problems is the presence of gypseous soils covering about (27-36) percentage of Iraq soils containing gypsum between (10-70) ratios. The main reason for soil problematic is the gypsum dissolution when these soils are inundated. However, the soluble gypsum can be leached out of the soil particles, so these problems can be led to cracking, tilting, and collapsing the related soil structure and changing the soil properties. The aim of this work is to investigate the performance of under-reamed piles as a new, improved method to reduce the moisture sensitive and the primary triggering mechanism for the volume reduction of collapsible soil, which is considered as a non-elastic deformation; this was done by c
... Show MoreThe economical design of plate loaded by pressure can be obtained by using stiffeners instead of increasing the thickness of plate. The main subject of this work is to obtain the effect of stiffener height on the maximum stress in the plate subjected to pressure load. Different plate-stiffener sets are selected to find the effects of stiffener thickness, plate dimensions and pressure, on the optimum stiffener height. The models under consideration are square plates clamped rigidly from four edges. Finite Element method is used to analyze 160 different models by using the Finite Element software package ANSYS version 11. Another analysis method based on maximum stress equation is used to analyze 30 models. The graphical comparison of results
... Show MoreThis study has been undertaken to postulate the mechanism of impact test at low velocities. Thin-walled tubes of 100Cr6 were deformed under axial compression. In the present work there are seven velocities (4.429,4.652,5.240,5.600,5.942,6.264, 6.569) m\sec were applied to show how they effect the load, change in length, also the kinetic energy. However, the comparison between the obtained results and the other studies (Alexandar[3] , Abramowicz[4], Ayad[5]) was made the present work and Ayad data show good agreement. Load, change in length, kinetic energy were determined to understand the impact test.
Direct measurements of drag force on two interacting particles arranged in the longitudinal direction for particle Reynolds numbers varying from J O to 103 are conducted using a micro-force measurement system. The effect of the interparticle distance and Reynolds number on the drag forces is examined. An empirical equation is obtained to describe the effect of the interparticle distance (l/d) on the dimensionless drag.
The research aims to extrapolate the repercussions of the use of expert systems in the work of the external auditor on the quality of audit, as the research problem was that despite the use of these techniques in audit work, there is a problem related to the efficiency and effectiveness of these technological systems used in audit work, the feasibility of their use and the extent of their impact: The quality of the audit process.
The researchers adopted the questionnaire as a tool for collecting study data from a community composed of auditors in auditing offices and companies in Iraq, and the auditors of the Iraqi Federal Financial Supervision Bureau. The number of recovered and valid qu
... Show MoreThe electrical properties of CdO/porous Si/c-Si heterojunction prepared by deposition of CdO layer on porous silicon synthesized by electrochemical etching were studied. The structural, optical, and electrical properties of CdO (50:50) thin film prepared by rapid thermal oxidation were examined. X-ray diffraction (XRD) results confirmed formation of nanostructured silicon layer the full width half maximum (FWHM) was increased after etching. The dark J-V characteristics of the heterojunction showed strong dependence on etching current density and etching time. The ideality factor and saturation current of the heterojunction were calculated from J-V under forward bias. C-V measurements confirmed that the prepared heterojunctions are abrupt
... Show More