Preferred Language
Articles
/
joe-2169
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Aug 01 2021
Journal Name
Turkish Journal Of Physiotherapy And Rehabilitation
BUILDING AND RATIONING SCALE MANAGEMENT CONSTRAINTS OF E-LEARNING FROM THE PERSPECTIVE OF TEACHING THE FACULTY OF PHYSICAL EDUCATION AND SPORTS SCIENCE UNIVERSITY OF BAGHDAD
...Show More Authors

Publication Date
Sun Mar 01 2009
Journal Name
Journal Of Economics And Administrative Sciences
Simulation of five methods for parameter estimation and functionExponential distribution reliability
...Show More Authors
The estimation process is one of the pillars of the statistical inference process as well as the hypothesis test, and the assessment is based on the collection of information and conclusions about the teacher or the community's teachers on the basis of the result
... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Aip Conference Proceedings
Estimation of (S-S) reliability for inverted exponential distribution
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Engineering
Estimation of Mass Transfer Coefficient for Copper Electrowinning Process
...Show More Authors

Mass transfer was examined at a stationary rectangular copper electrode (cathode) by using the reduction of cupric ions as the electrochemical reaction. The influence of electrolyte temperature (25, 45, and 65 oC), and cupric ions concentration (4, 8, and 12 mM) on mass transfer coefficient were investigated by using limiting current technique. The mass transfer coefficient and hence the Sherwood number was correlated as Sh =

 

View Publication Preview PDF
Publication Date
Fri Jan 01 2021
Journal Name
Microchemical Journal
A flow analysis system integrating an optoelectronic detector for the quantitative determination of active ingredients in pharmaceutical formulations
...Show More Authors

View Publication Preview PDF
Scopus (24)
Crossref (17)
Scopus Clarivate Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Microchemical Journal
A flow analysis system integrating an optoelectronic detector for the quantitative determination of active ingredients in pharmaceutical formulations
...Show More Authors

Scopus (24)
Crossref (17)
Scopus Clarivate Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
The Evaluation of Information Security Management System in the Iraqi Commission for Computers and Informatics according to the International Standard (ISO 27001: 2013)
...Show More Authors

    The current research included (the evaluation of Information Security Management System on according to international standard (ISO / IEC 27001: 2013) in Iraqi Commission for Computers and Informatics), for the development of an administrative system for information security is considered a priority in the present day, and in the light of the organizations  dependence on computers and information technology in work and communication  with others. The international legitimacy (represented by the  International Organization for standardization (ISO)) remains the basis for matching and commitment and the importance of the application of information Security Management System accordi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jul 05 2017
Journal Name
International Journal Of Science And Research (ijsr)
Assessing BIM Integration with Sustainable Requirement for Buildings Construction
...Show More Authors

View Publication
Crossref (4)
Crossref
Publication Date
Tue Oct 12 2021
Journal Name
Innovative Infrastructure Solutions
Facilitating claims settlement using building information modeling in the school building projects
...Show More Authors

View Publication
Scopus (15)
Crossref (13)
Scopus Clarivate Crossref
Publication Date
Sun Dec 21 2025
Journal Name
Journal Of The Iraqi University
THE ROLE OF STRATEGIC AMBIGUITY IN BUILDING THE CUSTOMER’S MENTAL IMAGE: AN EXPLORATORY RESEARCH IN THE NATIONAL INSURANCE COMPANY
...Show More Authors

View Publication