In this study, the electro-hydraulic servo system for speed control of fixed displacement hydraulic motor using proportional valve and (PID) controller is investigated theoretically ,experimentally and simulation . The theoretical part includes the derivation of the nonlinear mathematical model equation of (valve – motor ) combination system and the derivation of the transfer function for the complete hydraulic system , the stability test of the system during the operation through the transfer function using MATLAB package
V7.1 have been done. An experimental part includes design and built hydraulic test rig and simple PID controller .The best PID gains have been calculated experimentally and simulation, speed control performance tests for the system at different thermal conditions for hydraulic oil have been done , Simulation analysis for (EHSS) using Automation Studio package V5.2 have been done . Comparison was made between experimental work and simulation work .The experimental results show good performance for (EHSS) using simple (PID) controller at hydraulic oil temperature around (60 – 70 ) and good speed response and performance for hydraulic motor with constant rotation speed (700) rpm with different load disturbance applied on the hydraulic motor .
There are significant differences between the pre and post-tests in favor of the post-test in the tests) stroke volume (S.V), cardiac thrust (C.O.P), left ventricular volume, maximum oxygen consumption Vo2max), which indicates the effect of the proposed training approach.There are significant differences between the pre and post-tests in favor of the post-test in the achievement level test with air rifle shooting for young female shooters, which indicates the effect of the proposed training curriculum.There are no significant differences between the pre and post-tests in the tests (heart rate (HR) before exercise, heart rate (HR) after exercise, systolic blood pressure rate before exercise, systolic blood pressure rate after exercis
... Show MoreThis study included estimation of glutathione (GSH) and Malondialdehyde (MDA) levels in the serum of diabetic patients type II who are treated with a polyherbs mixture (Nigella sativa, Trigonella foenum-graeum, Cyperus rotundus and Teucrium polium) for three months of treatments. Seventy samples of diabetic patients Type II male and females with age about (35-60) years were taken including 44 samples for group one (24 male, 20 female) who used herbs accompanied with chemical treatment (drugs) and 26 samples for the second group (13male and 13 female) who used herbs only. These groups were compared with 60 samples obtained from healthy persons (29 male, 31 female) at the same age of patients as a control group. Effect of age and treatment fo
... Show Moreيسعى البحث إلى الاهتمام بإحدى الوظائف المهمة في إدارة الموارد البشرية وهي تقويم الأداء التي تواجه مجموعة من الانتقادات والآراء السلبية، اذ ظهر في الأّونة الأخيرة أنموذج جديد يمكن إن يتجاوز تلك السلبيات وهو أنموذج التغذية العكسية المتعدد المصادر درجة .وقد حاول الباحثان توظيف هذا المفهوم في اثنتين من المنظمات العامة العراقية هما (دائرة كهرباء الوسط) التابعة لوزارة الكهرباء
و (دائرة الماء والمجاري) ال
يلعب القطاع الصناعي التحويلي في أي قطر دوراً هاماً في تحقيق التنمية الصناعية، اذ تتحد تاثيراته فيها على طبيعة الدور المرسوم له وعلى مدى فاعلية هذا القطاع الحيوي الذي يعد اتجاه نحو التعاظم المضطرد لمستويات الانتاجية " Levels of productivity"والتنويع الانتاجي والتدفق المستمر للتجديد التكنولوجي من اهم دلائله.
ويعد مؤشر الانتاجية بصفة عامة وانتاجيتي العمل وراس المال بصفة خاصة من الم
... Show MoreIn this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive meas
... Show More
The research aims to identify the factors that affect the quality of the product by using the Failure Mode and Effect Analysis (FMEA) tool and to suggest measures to reduce the deviations or defects in the production process. I used the case study approach to reach its goals, and the air filter product line was chosen in the air filters factory of Al-Zawraa General Company. The research sample was due to the emergence of many defects of different impact and the continuing demand for the product. I collected data and information from the factory records for two years (2018-2019) and used a scheme Pareto Fishbone Diagram as well as an FMEA tool to analyze data and generate results.
Par
... Show MoreIn the last two decades, arid and semi-arid regions of China suffered rapid changes in the Land Use/Cover Change (LUCC) due to increasing demand on food, resulting from growing population. In the process of this study, we established the land use/cover classification in addition to remote sensing characteristics. This was done by analysis of the dynamics of (LUCC) in Zhengzhou area for the period 1988-2006. Interpretation of a laminar extraction technique was implied in the identification of typical attributes of land use/cover types. A prominent result of the study indicates a gradual development in urbanization giving a gradual reduction in crop field area, due to the progressive economy in Zhengzhou. The results also reflect degradati
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of
... Show More