In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
The main aim of this research study is to point out the vital importance of high-quality exterior audits to limit discretionary accounting, as it could distort a company’s commercial results. The research introduces a well-founded hypothesis on the preventive powers of high-quality audits, as it can act as a strong exterior control. The research focuses on testing the complex relationship between earnings management and investors’ behavior within the public-listed companies from the food industry. The research gathers credible annual comprehensive data from thirty-five publicly-listed firms from the United States. It encompasses the twenty years prior to 2024, as it includes the twenty years prior to 2024. Additionally, the gathered dat
... Show MoreAbstract: -
The concept of joint integration of important concepts in macroeconomic application, the idea of cointegration is due to the Granger (1981), and he explained it in detail in Granger and Engle in Econometrica (1987). The introduction of the joint analysis of integration in econometrics in the mid-eighties of the last century, is one of the most important developments in the experimental method for modeling, and the advantage is simply the account and use it only needs to familiarize them selves with ordinary least squares.
Cointegration seen relations equilibrium time series in the long run, even if it contained all the sequences on t
... Show MoreThe study objective was to conduct Pharmacoeconomics study (cost-effective analysis) between infliximab reference (Remicade) and its biosimilar (Remsima) in patients with rheumatoid arthritis (RA) in Iraqi hospitals.
This is a retrospective multicenter pharmacoeconomic analysis conducted at two large teaching governmental hospitals in Baghdad, Iraq which provided infliximab to patients with RA. Data were collected from patient’s medical records and face-to-face interviews with the patients from December 2021 to April 2022.
The study included 57 patients with rheumatoid arthritis (RA). The patients were categorized into two groups according to the type of infliximab they received over 30 weeks: 27 patients received
... Show MoreAbstract
Travel Time estimation and reliability measurement is an important issues for improving operation efficiency and safety of traffic roads networks. The aim of this research is the estimation of total travel time and distribution analysis for three selected links in Palestine Arterial Street in Baghdad city. Buffer time index results in worse reliability conditions. Link (2) from Bab Al Mutham intersection to Al-Sakara intersection produced a buffer index of about 36% and 26 % for Link (1) Al-Mawall intersection to Bab Al- Mutham intersection and finally for link (3) which presented a 24% buffer index. These illustrated that the reliability get worst for link
... Show MoreThe accounting information that is produced by any System a user either entering or leaving, since the needs of the users began to evolve where he became the information provided by the current reporting system that does not meet their requirements in terms of users began to demand information, more quickly, and as a result of the needs of the user accounting system and the development of information and communications technology has emerged a new system (real- time reporting system), which has the ability to produce information at the moment of data gathered, it is no longer dependent on local circumstance, but this case has become a global response where the computer has become a cornerstone of the culture of the communi
... Show MoreProject management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show More