Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Aug 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
The Economic Analysis for Construction in Ibn Khalduon s’ Muqaddimah
...Show More Authors

The specialist researcher  fined the relations between economic ideas with economic facts in his theory which called humanity building it is appeared clearly ( in Ibn Khalduons’ Muqaddimah) in a clothe of economic  social  phenomenon's as a systematical analysis in all fifty chapters of al Muqaddimah ,therefore this paper deal with  Ibn Khalduon economic thoughts as important says which describe the society building in its economic subjective  and  examine the relationship between The dissert and the city within economic says which are cover  the social analysis ,and determinate   the analysis objects  which clearly in this dualism  model ,between the state and economic bas

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Feb 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Arab spring and problematic prescriptions capitalist construction in transitional economy
...Show More Authors

ان الرأسمالية ليست بناءً هندسياً يتم انتظامه وفقاً للنظريات الهندسية والمعادلات الرياضية والفنون المعمارية، لأنها ببساطة نظاماً اجتماعياً يقوم على تشكيلة اقتصادية معينة، والأخيرة تقوم على مستوى معين لتطور قوى الانتاج (التكنولوجيا) والذي يقوم عليه مستوىً معين لعلاقات الإنتاج، ويقوم على التشكيلة الاقتصادية/ نمط الإنتاج نظاماً سياسياً، هو جزء من البناء الفوقي، ولأنها نظاماً اجتماعياً بالمواصفات انفة

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Feb 01 2023
Journal Name
Practice Periodical On Structural Design And Construction
Best Practice Strategies for Workforce Development and Sustainability in Construction
...Show More Authors

View Publication
Scopus (16)
Crossref (17)
Scopus Clarivate Crossref
Publication Date
Fri May 20 2022
Journal Name
Eai Endorsed Transactions On Internet Of Things
APP innovation to Control Projects Risks Management during Crises
...Show More Authors

The goal of this study is to build an application that can be used in difficult cases and sudden circumstances during the pandemic and post-disaster state, which can be the development of digital risk management and mitigating the difficult impact of the epidemic through the improvement of IT and IoT that can be fine by finding initial solutions and make the world like a digital city that could be managed by the network. We provide this study to gain an overview of reasons for delayed and exceeded costs in a select of thirty Iraqi case projects by controlling the time and cost. The drivers of delay have been investigated in multiple countries/contexts. however, there is little country data available under the conditions that have ch

... Show More
View Publication
Crossref (2)
Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling projects using dynamic programming style and smart algorithm
...Show More Authors

The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.

It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed 

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Apr 06 2014
Journal Name
Journal Of Educational And Psychological Researches
Effectiveness of cooperative learning in at the implementation of floral material for celli graph and decoration
...Show More Authors

The purpose of this resesrh know (the effectiveness of cooperative lerarning implementation of floral material for calligraphy and ornamentation) To achieve the aim of the research scholar put the two zeros hypotheses: in light of the findings of the present research the researcher concluded a number of conclusions, including: -
1 - Sum strategy helps the learner to be positive in all the information and regulations, monitoring and evaluation during the learning process.
2 - This strategy helps the learner to use information and knowledge and their use in various educational positions, and to achieve better education to increase its ability to develop thinking skills and positive trends towards the article.
In light of this, the

... Show More
View Publication Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Mechanical Engineering
Innovations and Requirements of Strategy for Digital Maintenance Management in Construction Project
...Show More Authors

Scopus (2)
Scopus
Publication Date
Tue May 09 2023
Journal Name
Buildings
Identification of Desired Qualifications for Construction Safety Personnel in the United States
...Show More Authors

Construction is a hazardous industry with a high number of injuries. Prior research found that many industry injuries can be prevented by implementing an effective safety plan if prepared and maintained by qualified safety personnel. However, there are no specific guidelines on how to select qualified construction safety personnel and what criteria should be used to select an individual for a safety position in the United States (US) construction industry. To fill this gap in knowledge, the study goal was to identify the desired qualifications of safety personnel in the US construction industry. To achieve the study goal, the Delphi technique was used as the main methodology for determining the desired qualifications for constructio

... Show More
View Publication
Scopus (9)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Tue Jun 30 2015
Journal Name
Al-khwarizmi Engineering Journal
Studying and Modeling the Effect of Graphite Powder Mixing Electrical Discharge Machining on the Main Process Characteristics
...Show More Authors

Abstract

This paper concerned with study the effect of a graphite micro powder mixed in the kerosene dielectric fluid during powder mixing electric discharge machining (PMEDM) of high carbon high chromium AISI D2 steel. The type of electrode (copper and graphite), the pulse current and the pulse-on time and mixing powder in kerosene dielectric fluid are taken as the process main input parameters. The material removal rate MRR, the tool wear ratio TWR and the work piece surface roughness (SR) are taken as output parameters to measure the process performance. The experiments are planned using response surface methodology (RSM) design procedure. Empirical models are developed for MRR, TWR and SR, using the analysis

... Show More
View Publication Preview PDF