Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Mar 01 2019
Journal Name
Al-khwarizmi Engineering Journal
Design and Implementation of a Telemetry System for Environmental Applications
...Show More Authors

The Environmental Data Acquisition Telemetry System is a versatile, flexible and economical means to accumulate data from multiple sensors at remote locations over an extended period of time; the data is normally transferred to the final destination and saved for further analysis.

This paper introduces the design and implementation of a simplified, economical and practical telemetry system to collect and transfer the environmental parameters (humidity, temperature, pressure etc.) from a remote location (Rural Area) to the processing and displaying unit.

To get a flexible and practical system, three data transfer methods (three systems) were proposed (including the design and implementation) for rural area services, the fi

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 30 2017
Journal Name
Al-khwarizmi Engineering Journal
Design & Implementation of High Switching & Low Phase Noise Frequency Synthesizer
...Show More Authors

This research  describes the design & implementation of frequency synthesizer using single loop Phase lock loop with the following specifications: Frequency range (1.5 – 2.75) GHz,Step size (1 MHz), Switching time 36.4 µs, & phase noise @10 kHz = -92dBc & spurious -100 dBc

  The development in I.C. technology provide the simplicity in the design of frequency synthesizer because it implements the phase frequency detector(PFD) , prescalar &  reference divider in single chip. Therefore our system consists of  a single chip contains (low phase noise PFD, charge pump, prescalar  & reference divider), voltage controlled oscillator , loop filter & reference oscillator. The single chip

... Show More
View Publication Preview PDF
Publication Date
Fri Mar 01 2019
Journal Name
Al-khwarizmi Engineering Journal
Implementation of Neural Control for Continuous Stirred Tank Reactor (CSTR)
...Show More Authors

In this paper a dynamic behavior and control of  a jacketed continuous stirred tank reactor (CSTR)  is developed using different control strategies, conventional feedback control (PI and PID), and neural network (NARMA-L2, and NN Predictive) control. The dynamic model for CSTR process is described by a first order lag system with dead time.

The optimum tuning of control parameters are found by two different methods; Frequency Analysis Curve method (Bode diagram) and Process Reaction Curve using the mean of Square Error (MSE) method. It is found that the Process Reaction Curve method is better than the Frequency Analysis Curve method and PID feedback controller is better than PI feedback controller.

The results s

... Show More
View Publication Preview PDF
Publication Date
Mon May 27 2019
Journal Name
Al-khwarizmi Engineering Journal
Design and Implementation of SCADA System for Sugar Production Line
...Show More Authors

SCADA is the technology that allows the operator to gather data from one or more various facilities and to send control instructions to those facilities.  This paper represents an adaptable and low cost SCADA system for a particular sugar manufacturing process, by using Programmable Logic Controls (Siemens s7-1200, 1214Dc/ Dc/ Rly). The system will control and monitor the laboratory production line chose from sugar industry. The project comprises of two sections the first one is the hardware section that has been designed, and built using components suitable for making it for laboratory purposes, and the second section was the software as the PLC programming, designing the HMI, creating alarms and trending system. The system will ha

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Mar 31 2017
Journal Name
Al-khwarizmi Engineering Journal
Design and Implementation of a Pharmaceutical Inventory Database Management System
...Show More Authors

The main aim of this paper are the design and implementation of a pharmaceutical inventory database management system. The system was implemented by creating a database containing information about the stored medicines in the inventory, customers making transactions with the pharmaceutical trading company (which owns the inventory), medical suppliers, employees, payments, etc. The database was connected to the main application using C sharp. The proposed system should help in manag inginventory operations which include adding/updating employees’ information, preparing sale and purchase invoices, generating reports, adding/updating customers and suppliers, tracking customer payments and checking expired medicines in order to be disposed

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Aug 11 2021
Journal Name
Nauchforum
ROLE OF METAPHOR IN PUPPET IMPLEMENTATION (ON THE EXAMPLE OF D. RUBINA'S NOVEL «PETRUSHKA'S SYNDROME»)
...Show More Authors

The article examines metaphors as one of the fundamental means used by D. Rubina when writing the novel “Parsley Syndrome” to form images of dolls as equal heroes of the work. The author of the article continues research related to the work of Dina Ilinichna Rubina, a representative of modern Russian prose.

Publication Date
Mon May 01 2023
Journal Name
Environmental Nanotechnology, Monitoring & Management
A review study summarizes the main characterization techniques of nano-composite photocatalysts and their applications in photodegradation of organic pollutants
...Show More Authors

Scopus (43)
Crossref (14)
Scopus Crossref
Publication Date
Mon Mar 07 2022
Journal Name
Construction Research Congress 2022
Impact of Green Construction on Safety Performance in the Built Environment
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Professional Safety
Shedding Light on the Concept of Social Equity in SUSTAINABLE CONSTRUCTION
...Show More Authors

Publication Date
Sat Dec 01 2012
Journal Name
Iraqi Journal Of Science
Applications of Camera Total Station System (CTSS) in the Construction Surveying
...Show More Authors

AZ Khalaf, M kassim Haidir, LK Jasim, Iraqi Journal of Science, 2012

View Publication