Preferred Language
Articles
/
joe-1847
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Jan 01 2012
Journal Name
Conference
Identifying Causes of Variation in Construction Industry Based on Questionnaire
...Show More Authors

Publication Date
Tue Dec 15 2020
Journal Name
Al-academy
Dramatic Construction in Quranic Text Surah Taha – A model: جبار خماط حسن
...Show More Authors

There are many varied studies that dealt with the dramatic construction, especially books and studies that addressed drama in its construction and the method of writing it, that no textbook or a general cultural content is void of tackling the dramatic text in its construction and how the dramatic action develops in it. Therefore, a question occurs to the mind about the feasibility of dealing with the dramatic construction in this time, where many contemporary studies of dramatology and its relation and the contemporary critical directions are accumulating. This question many have two realistic aspects, yet the novelty and originality that this research shows lie in addressing a refined linguistic text in its style and connotations, such

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sun Mar 07 2010
Journal Name
Baghdad Science Journal
Implementation of Optical Coherent Communication System between Two Computers
...Show More Authors

This work represents implementation and investigation of optical coherent communication system between two computers. A single mode optical fiber is selected as transmission medium. The data are sent via the RS-232 standard interface with a bit rate of 9.6 kbps from personal computer (PC1) by line receive to convert the data from electrical levels (-12/+12 V) into TTL level (0/5 V). The modulation of this data was accomplished by internal modulation using laser diode type (HFCT-5208M) 1310 nm wavelength. The optical D-coupler was used to combine the optical signal that come from laser source with optical signal of laser local oscillator (OTS-304XI) at 1310/1550 nm wavelength to obtain coherent (homodyne and heterodyne) detection respective

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jan 01 2021
Journal Name
E3s Web Of Conferences
Selecting Appropriate Delivery System for Implementation of Green Buildings
...Show More Authors

Green buildings are considered more efficient than traditional buildings due to the incorporated techniques and the multidisciplinary specializations required to comply with their specifications, in addition to the advanced commissioning, which undergoes before handing over the buildings to the owners to ensure requirements conformance. As a result, the appropriate selection of a project delivery system acts as the essential factor that affects the performance of the project. This research aims at building a system that helps to select the best method to implement green buildings. Through studying the recent research approaches in project delivery systems, the factors that affect the selection of the optimal implementation method fo

... Show More
View Publication
Scopus (2)
Scopus Crossref
Publication Date
Tue Feb 28 2017
Journal Name
Journal Of Engineering
Design and Implementation of Enhanced Smart Energy Metering System
...Show More Authors

In this work, the design and implementation of a smart energy metering system has been developed. This system consists of two parts: billing center and a set of distributed smart energy meters. The function of smart energy meter is measuring and calculating the cost of consumed energy according to a multi-tariff scheme. This can be effectively solving the problem of stressing the electrical grid and rising consumer awareness. Moreover, smart energy meter decreases technical losses by improving power factor. The function of the billing center is to issue a consumer bill and contributes in locating the irregularities on the electrical grid (non-technical losses). Moreover, it sends the switch off command in case of the consumer bill is not

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 31 2019
Journal Name
Journal Of Engineering And Applied Sciences
Design and Implementation of Electronic Infrastructure for Academic Establishment
...Show More Authors

View Publication
Crossref
Publication Date
Mon Jul 10 2023
Journal Name
Journal Of Engineering
Design and Implementation of Single-Phase Boost PFC Converter
...Show More Authors

In this paper, a single-phase boost type ac-dc converter with power factor correction (PFC) technique is designed and implemented. A current mode control at a constant switching frequency is used as a control strategy for PFC converter. The PFC converter is a single-stage singleswitch boost converter that uses a current shaping technique to reshape the non-sinusoidal input current drawn by the bulky capacitor in the conventional rectifier. This technique should provide an input current with almost free-harmonics, comply with the IEC61000-3-2 limits, and a system operates with near unity power factor. The other function of the boost converter that should be
accomplished is to provide a regulated DC output voltage. The complete designed

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jan 01 2018
Journal Name
International Journal Of Science And Research (ijsr)
The Linear Delay Fourth Order Eigen-Value Problems Solved By the Collocation Method
...Show More Authors

Publication Date
Tue Oct 12 2021
Journal Name
Innovative Infrastructure Solutions
Facilitating claims settlement using building information modeling in the school building projects
...Show More Authors

View Publication
Scopus (10)
Crossref (9)
Scopus Clarivate Crossref
Publication Date
Thu Jun 01 2017
Journal Name
Professional Safety
Six Sigma & Construction Safety
...Show More Authors