Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints
...Show More Authors

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most effective project delivery method and shortening the design project life cycle. The building industry's procedures will incorporate suppliers. In contrast, the main constraints include the government rules and industry standards for BIM and LC are not obligatory, the absence of government funding and participation, and the industry's resistance to changing from customary operating methods. The study strategies and recommendations will enhance BIM-LC-LC implementation. It allows project partners to focus on addressing the challenges identified in this study and understand the benefits of BIM-LC to be an incentive to adopt them.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Mon Oct 01 2012
Journal Name
Al–bahith Al–a'alami
Technical Construction of Advertisements in Radio of the Republic of Iraq
...Show More Authors

Studies and scientific research conducted in the field of communication have shown that broadcasting has a clear impact on the ideas, attitudes and behavior of the masses if it is better used in making the media message studied.

The role of this means is not only to present opinions and ideas, but also to influence trends by supporting or changing them. This is of course a matter for the nature of the content in terms of its formulation and the way it is prepared and presented. The power and appeal of a radio message is not complete by simply creating content without creating a distinctive design; and to what extent this content depends on the logic and psychology of persuasion.

The conviction of the cont

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2011
Journal Name
Journal Of Engineering
CONSTRUCTION DELAY ANALYSIS USING DAILY WINDOWS TECHNIQUE
...Show More Authors

Delays occur commonly in construction projects. Assessing the impact of delay is sometimes a contentious
issue. Several delay analysis methods are available but no one method can be universally used over another in
all situations. The selection of the proper analysis method depends upon a variety of factors including
information available, time of analysis, capabilities of the methodology, and time, funds and effort allocated to the analysis. This paper presents computerized schedule analysis programmed that use daily windows analysis method as it recognized one of the most credible methods, and it is one of the few techniques much more likely to be accepted by courts than any other method. A simple case study has been implement

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Apr 28 2017
Journal Name
جامعة بغداد- كلية اللغات- قسم اللغة العبرية
The morphological construction of kitchen terms in Hebrew language
...Show More Authors

This research sheds light on the morphological construction of kitchen terms in Hebrew language, especially methods of derivation, by offering an extensive review of the most important methods of morphological derivation. The field of kitchen terms is a fertile and rich field, where we see daily production of new kitchen tools which require suitable names with specific meanings. Morphologically, the research interested in methods of morphological derivation. So as to know and identify the common and effective methods to derive the kitchen terms in Hebrew language, in addition to put a special glossary of these terms. The research found that most of the kitchen terms were derived according to the methods of derivation prevailing in Hebrew la

... Show More
Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies l

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Factors affecting time and cost trade-off in multiple construction projects
...Show More Authors

Scopus (7)
Scopus
Publication Date
Thu Oct 01 2020
Journal Name
Green Engineering
Sustainability and recovery project management implementation on construction projects in Iraq
...Show More Authors

Scopus (1)
Scopus
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Mon Oct 02 2023
Journal Name
Journal Of Engineering
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Wed Mar 10 2021
Journal Name
Baghdad Science Journal
About the construction of fuzzy inner product
...Show More Authors

In this research for each positive integer integer and is accompanied by connecting that number with the number of Bashz Attabq result any two functions midwives to derive a positive integer so that there is a point

View Publication Preview PDF