Preferred Language
Articles
/
joe-1776
Significant Safety Factors Affecting the Safety Performance in Iraqi Construction Projects
...Show More Authors

Despite recent attempts to improve safety in the construction sector, this sector is considered dangerous and unsafe. Iraq is one of the emerging nations that suffers from a lack of construction safety management. In 2018, the construction sector in Iraq was responsible for 38% of all industrial accidents. Creating a safety program minimizes this problem by making safety an intrinsic part of construction projects. As a result, this article aims to identify the crucial safety factors that affect the safety performance in Iraqi construction projects. After conducting a critical literature review of the related literature, a list of 35 sub-factors classified into nine categories of main factors was chosen to rank each factor according to significance. A total of 100 sets of questionnaires were delivered to respondents in various construction projects. It was discovered that the "Management Practices" factor was considered the most key safety performance factor among all the main factors. The results also showed that among all the sub-factors, "Personal protective equipment," "First aid and medical care," and "Contractor's site safety program" were considered the most influential sub-factors. Furthermore, "drug and alcohol tests for workers" are the least important safety sub-factors. On the other hand, five sub-factors were excluded as being unimportant and not affecting safety performance.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Jun 01 2022
Journal Name
Journal Of Engineering
Assessment Strategies of Fixed Firefighting system in Residential Multi-Story Building for Improving Fire Safety: A Review
...Show More Authors

A fixed firefighting system is a key component of fire safeguarding and reducing fire danger. It is installed as a permanent component in a structure to protect the entire or a portion of the building and its contents. The study aims to review the previous studies that deal with the evaluation of fire safety measures and their use in resolving problems associated with fire threats in buildings. For this reason, a number of previous studies in this field were reviewed compared with the NFPA code. The findings revealed that regulatory developments over the last several decades had created an atmosphere conducive to innovation. This has resulted in a growth in the number of fixed firefighting system types now obtainable. Th

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 29 2024
Journal Name
International Journal Of Safety And Security Engineering
Urban Safety is a Tool for Containing Slums to Reach a Sustainable Urban Structure
...Show More Authors

Many cities suffer from the large spread of slums, especially the cities of the Middle East. The purpose of the paper is to study the reality of informal housing in Al-Barrakia and the most important problems that it suffers from. The paper also seeks to study the presence or absence of a correlation between urban safety indicators and urban containment indicators as one of the methods of developing and planning cities. This can be achieved through sustainable urban management. The slums are a source of many urban problems that threaten the security and safety of the residents and represent a focus for the concentration of crimes and drugs. The paper seeks to answer the following question: How can urban safety be improved through urban cont

... Show More
View Publication Preview PDF
Scopus (4)
Scopus Crossref
Publication Date
Thu Jul 01 2021
Journal Name
Civil Engineering Journal
Factors Affecting Traffic Accidents Density on Selected Multilane Rural Highways
...Show More Authors

Estimations of average crash density as a function of traffic elements and characteristics can be used for making good decisions relating to planning, designing, operating, and maintaining roadway networks. This study describes the relationships between total, collision, turnover, and runover accident densities with factors such as hourly traffic flow and average spot speed on multilane rural highways in Iraq. The study is based on data collected from two sources: police stations and traffic surveys. Three highways are selected in Wassit governorate as a case study to cover the studied locations of the accidents. Three highways are selected in Wassit governorate as a case study to cover the studied locations of the accidents. The selection

... Show More
Preview PDF
Crossref (11)
Crossref
Publication Date
Thu Jul 01 2021
Journal Name
Civil Engineering Journal
Factors Affecting Traffic Accidents Density on Selected Multilane Rural Highways
...Show More Authors

Estimations of average crash density as a function of traffic elements and characteristics can be used for making good decisions relating to planning, designing, operating, and maintaining roadway networks. This study describes the relationships between total, collision, turnover, and runover accident densities with factors such as hourly traffic flow and average spot speed on multilane rural highways in Iraq. The study is based on data collected from two sources: police stations and traffic surveys. Three highways are selected in Wassit governorate as a case study to cover the studied locations of the accidents. Three highways are selected in Wassit governorate as a case study to cover the studied locations of the accidents. The se

... Show More
View Publication Preview PDF
Crossref (11)
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Aip Conference Proceedings
A study of the safety and security conditions followed in the X-ray clinics in the Al-Amiriya-Baghdad
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Identifying Failure Factors in the Implementation of Residential Complex Projects in Iraq
...Show More Authors

Residential complexes have witnessed a great demand in most countries worldwide, as they are one of the main infrastructure elements, in addition to achieving a developed urban landscape. However, complex residential projects in developing countries face various factors that could be improved in their implementation, especially in Iraq. Sixty-two experts in residential complex projects were interviewed and surveyed to verify these projects' failure factors,. Fifty-one factors were the main failure factors, divided into four main components (leadership, management system, external forces, and project resources). The Relatively Important Index (RII) is used to determine the relative importance factors and obtain the top tw

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Sun Jun 12 2022
Journal Name
Iraqi Journal Of Pharmaceutical Sciences ( P-issn 1683 - 3597 E-issn 2521 - 3512)
Understanding the Experience of Hospital Pharmacists with the Effectiveness, Safety, Adverse Drug Reaction Reporting and Interchangeability of Biopharmaceutical Medicines
...Show More Authors

The study objectives were to 1) explore the real-world experience of hospital pharmacists with the differences in effectiveness safety, and interchangeability between biosimilar medicines and their reference biological counterparts, 2) reveal pharmacist recommendations to enhance the safety of biopharmaceutical medicines in public hospitals.

The study has a mixed-method design where the core component was qualitative (interviews) and the supplemental component was quantitative (adverse drug reaction, ADR, reports). This qualitative component included semi-structured (mostly face-to-face) interviews involving hospital pharmacists from different hospitals with experience with biological or biosimilar medicines. The interviews were c

... Show More
View Publication Preview PDF
Scopus (9)
Crossref (3)
Scopus Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Periodicals Of Engineering And Natural Sciences
Using modified earned value for cost control in construction projects
...Show More Authors

Scopus (13)
Scopus