Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on the project objectives, as well as the tools and methodologies that project managers and decision-makers could use to handle the risks to reduce the negative effects of risks on the success of the construction projects. This study concludes that risk response should be considered an essential activity to complete the RMP, which will lead to minimizing the losses due to risks, maximizing the benefits due to opportunities, and achieving the objectives of projects.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Sep 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
The method of ABC and it, s roules in the Determining the cost of the Project constraction sector
...Show More Authors

Abstract

The basic orientation of the research is an attempting to apply the cost determining method according in the contract sector projects for Al- Iraq ceneral company, that this subject has a big value according to its modernity and  its influence on the future  and the eaning of the company.

The research aims to find out the effect of the method for determining cost based on the activity in determining the cost of the construction sector projects.The research was conducted in Iraq General Company for the implementation of irrigation projects. Bani search on three assumptions, the first is (that the application of the method for determining the cost on the basis of

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Mar 30 2023
Journal Name
Journal Of Economics And Administrative Sciences
Using the Critical Path Method to Find Time of Constriction for Helicopters Airport Project in the Oil Fields
...Show More Authors

This research is considered one of the important researches in Maysan Governorate, as it focuses on the construction of helicopter airport project in the oil fields of the Maysan Oil Company, where the oil general companies in Maysan Governorate suffer from the cost of transporting the foreign engineering experts and the governing equipment of sustaining oil industry from Iraq's international airports to oil fields and vice versa. Private international transport companies transport foreign engineering from the oil fields to Iraqi airports and vice versa, and other international security companies take action to provide protection for foreign engineering experts during transportation. Hence, this process is very costly.

 &nbs

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identification of the main causes of risks in engineering procurement construction projects
...Show More Authors
Abstract<p>Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected <italic>via</italic> well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects throu</p> ... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Tue May 09 2023
Journal Name
Buildings
Identification of Desired Qualifications for Construction Safety Personnel in the United States
...Show More Authors

Construction is a hazardous industry with a high number of injuries. Prior research found that many industry injuries can be prevented by implementing an effective safety plan if prepared and maintained by qualified safety personnel. However, there are no specific guidelines on how to select qualified construction safety personnel and what criteria should be used to select an individual for a safety position in the United States (US) construction industry. To fill this gap in knowledge, the study goal was to identify the desired qualifications of safety personnel in the US construction industry. To achieve the study goal, the Delphi technique was used as the main methodology for determining the desired qualifications for constructio

... Show More
View Publication
Scopus (5)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
View Publication
Scopus (2)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Engineering
Economic Benefits for the Application of Standards of Sustainability in Construction Projects
...Show More Authors

In this research, that been focused on the most important economic benefits expected when applying the three standards of sustainability in construction projects (economic, environmental and social). Fuzzy AHP, a multi-decision decision-making technique for evaluating construction projects. Which when used we get the speed and accuracy in the results. Using this technique will reduce uncertainties decisions significantly (fuzzy environment), that found in most projects .The results of the data analysis showed  that the economic standards take the greatest relative importance (60%) among the three sustainability standards. Therefore, the implementation of any standards need a cost so the economic benefit of any proje

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
The Economic Feasibility of the beekeeping project Using the method of mobile promiscuous
...Show More Authors

               An update of our research is the first to develop and reform the agricultural sector . and promoting production and productivity of this sector multi-sources , which is the management and beekeeping one source . Been applied to the style of beekeeping mobile promiscuous includes twentieth cell in the Iraqe project of mussiab . in which there exist a variety of crops and trees .

Experiment had proved successful and led to raise the level of npoduction of single Dell of the honey to 49 kg over the previous year and surpassed the average production percell in the province of Babylon , which the amount of 13.945 kg , another

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Project Planning & Scheduling: بحث تطبيقي لمشاريع / مديرية الابنية المدرسية /دائرة المشاريع /مشروعالوزارةرقم (1)
...Show More Authors

Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholder needs , However, there is increasing concern about whether know-how effectively improves  understanding of underlying theories of project management processes for construction organizations and their project managers  Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance , but many worldwide construction projects appear to give insufficient attention to effective management and definition of  project  planning, including pre planning stages . Indeed, some planning issues indeed, some planning issues have been completely ove

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Mar 10 2021
Journal Name
Baghdad Science Journal
About the construction of fuzzy inner product
...Show More Authors

In this research for each positive integer integer and is accompanied by connecting that number with the number of Bashz Attabq result any two functions midwives to derive a positive integer so that there is a point

View Publication Preview PDF
Publication Date
Tue Jun 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
The Interactive Role of Organizational Elegance between Organizational Anomaly and Planned Human Resource Behavior A survey of a sample of workers in the Ministry of Construction and Housing
...Show More Authors

This study attempts to test the interactive role played by organizational agility in enhancing the effect of organizational anomie on the behavior of planned human resources. The study of organizational anomie has increased because of the moral and legal pressures facing the organization by the external environment within its framework. To adapt to all external developments faced by these organizations, the behavior of human resources planned reflects the ability of individuals to control their behavior in different situations and situations that face them in the work.

The problem of the research indicates that there is a clear lack of understanding of what is meant by the variables studied in the sample

... Show More