Preferred Language
Articles
/
joe-170
Improvement of Gypseous Soil Using Cutback Asphalt
...Show More Authors

Gypseous soils are widely distributed and especially in Iraq where arid area of hot climatic is present. These soils are considered as problematic soils; therefore this work attends to improve the geotechnical properties of such soil and reduce the dangers of collapse due to wetting process. In this research, undisturbed soil sample of 30 % gypsum content from Karbala city is used. The Single Oedometer collapse test is used in order to investigate the collapse characteristics of natural soil and after treatment with 3%, 6%, 9%, 12% and 15% of Cutback Asphalt. Moreover, two selected additive percentages (9% and 12%) are used to evaluate the suitability of using the Cutback Asphalt for improvement of the bearing capacity of gypseous soils. A steel model box is used for this purpose, the treatment depth is equal to one and twice the footing width. The tests results showed that the total settlement of 25 mm of treated soil with (MC-30) material can be achieved at vertical stress lower than that value required for natural soil. Also, thickness of treated layer with (MC-30) material below the proposed foundation has a significant effect on the value of bearing capacity of the soil. The rate of salt dissolved (C.V) is extremely decreased especially at all percentages of Cutback Asphalt.  The best bearing improvement ratio is found at 9% asphalt and at a depth equal to foundation width. However, the Cutback Asphalt can be successfully used by 12% for collapse potential treatment while it is not suitable for improvement of the bearing capacity of gypseous soils.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Jun 01 2021
Journal Name
Journal Of Optical Communications
Improving the optical link for UVLC using MIMO technique
...Show More Authors
Abstract<p>This paper proposed a theoretical treatment to study underwater wireless optical communications (UWOC) system with different modulation schemes by multiple input-multiple output (MIMO) technology in coastal water. MIMO technology provides high-speed data rates with longer distance link. This technique employed to assess the system by BER, Q. factor and data rate under coastal water types. The reliability of the system is examined by the techniques of 1Tx/1Rx, 2Tx/2Rx, 3Tx/3Rx and 4Tx/4Rx. The results shows the proposed technique by MIMO can get the better performance compared with the other techniques in terms of BER. Theoretical results were obtained to compare between PIN and APD </p> ... Show More
View Publication
Scopus (20)
Crossref (20)
Scopus Crossref
Publication Date
Wed Jan 01 2025
Journal Name
International Journal Of Computing And Digital Systems
Digital Intelligence for University Students Using Artificial Intelligence Techniques
...Show More Authors

View Publication
Scopus (7)
Crossref (3)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Open Engineering
Producing low-cost self-consolidation concrete using sustainable material
...Show More Authors
Abstract<p>The disposal of the waste material is the main goal of this investigation by transformation to high-fineness powder and producing self-consolidation concrete (SCC) with less cost and more eco-friendly by reducing the cement weight, taking into consideration the fresh and strength properties. The reference mix design was prepared by adopting the European guide. Five waste materials (clay brick, ceramic, granite tiles, marble tiles, and thermostone blocks) were converted to high-fine particle size distribution and then used as 5, 10, and 15% weight replacements of cement. The improvement in strength properties is more significant when using clay bricks compared to other activated waste </p> ... Show More
View Publication
Crossref (12)
Crossref
Publication Date
Sat Nov 26 2022
Journal Name
Sensors
3D Object Recognition Using Fast Overlapped Block Processing Technique
...Show More Authors

Three-dimensional (3D) image and medical image processing, which are considered big data analysis, have attracted significant attention during the last few years. To this end, efficient 3D object recognition techniques could be beneficial to such image and medical image processing. However, to date, most of the proposed methods for 3D object recognition experience major challenges in terms of high computational complexity. This is attributed to the fact that the computational complexity and execution time are increased when the dimensions of the object are increased, which is the case in 3D object recognition. Therefore, finding an efficient method for obtaining high recognition accuracy with low computational complexity is essentia

... Show More
View Publication
Scopus (13)
Crossref (15)
Scopus Clarivate Crossref
Publication Date
Fri Jan 01 2016
Journal Name
International Journal Of Advanced Computer Science And Applications
Automatic Approach for Word Sense Disambiguation Using Genetic Algorithms
...Show More Authors

Abstract: Word sense disambiguation (WSD) is a significant field in computational linguistics as it is indispensable for many language understanding applications. Automatic processing of documents is made difficult because of the fact that many of the terms it contain ambiguous. Word Sense Disambiguation (WSD) systems try to solve these ambiguities and find the correct meaning. Genetic algorithms can be active to resolve this problem since they have been effectively applied for many optimization problems. In this paper, genetic algorithms proposed to solve the word sense disambiguation problem that can automatically select the intended meaning of a word in context without any additional resource. The proposed algorithm is evaluated on a col

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Oct 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Estimate The Survival Function By Using The Genetic Algorithm
...Show More Authors

  Survival analysis is the analysis of data that are in the form of times from the origin of time until the occurrence of the end event, and in medical research, the origin of time is the date of registration of the individual or the patient in a study such as clinical trials to compare two types of medicine or more if the endpoint It is the death of the patient or the disappearance of the individual. The data resulting from this process is called survival times. But if the end is not death, the resulting data is called time data until the event. That is, survival analysis is one of the statistical steps and procedures for analyzing data when the adopted variable is time to event and time. It could be d

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Feb 04 2019
Journal Name
Iraqi Journal Of Physics
Satellite image classification using proposed singular value decomposition method
...Show More Authors

In this work, satellite images for Razaza Lake and the surrounding area
district in Karbala province are classified for years 1990,1999 and
2014 using two software programming (MATLAB 7.12 and ERDAS
imagine 2014). Proposed unsupervised and supervised method of
classification using MATLAB software have been used; these are
mean value and Singular Value Decomposition respectively. While
unsupervised (K-Means) and supervised (Maximum likelihood
Classifier) method are utilized using ERDAS imagine, in order to get
most accurate results and then compare these results of each method
and calculate the changes that taken place in years 1999 and 2014;
comparing with 1990. The results from classification indicated that

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Apr 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Solving a three dimensional transportation problem using linear programming
...Show More Authors

Transport is a problem and one of the most important mathematical methods that help in making the right decision for the transfer of goods from sources of supply to demand centers and the lowest possible costs, In this research, the mathematical model of the three-dimensional transport problem in which the transport of goods is not homogeneous was constructed. The simplex programming method was used to solve the problem of transporting the three food products (rice, oil, paste) from warehouses to the student areas in Baghdad, This model proved its efficiency in reducing the total transport costs of the three products. After the model was solved in (Winqsb) program, the results showed that the total cost of transportation is (269,

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Dec 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Using Earned Value Method in Project Control Applied research
...Show More Authors

   There is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.

Earned Value Method is used in the project o

... Show More
View Publication Preview PDF
Crossref