This study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study, and they were asked to give weight to the factors using the Likert scale from 1 to 5. Finally, the Relative Importance Index RII was used to determine the factors statically with MS Excel 2015. In brief, all the respondents agreed upon “Economic condition in the country” is the first ranking factor. While “Site complication” was the last factor that affect labor productivity in construction. Last but not least, the “Motivation” group was the first ranked group. Apart from the factors, respondents agreed that Site Engineers have more effect on construction projects than Contractors and Designers.
Applying the constructability concept in the construction industry has proven many benefits in different projects; however, this concept still lacks usage in Iraq. Therefore, it is important to encourage usage of the constructability concept in the construction industry in Iraq. The main purpose of this study is to investigate the factors that affect constructability in Iraq and then classify them according to their importance. A total of 37 factors were collected from an intensive literature review, and they were classified under the sub and main categories. A survey was undertaken in two sessions with open questionnaire and close questionnaire. The results were analysed and the mean
|
Building Information Modeling (BIM) is becoming a great known established collaboration process in Architecture, Engineering, and Construction (AEC) industry. In various cases in many countries, potential benefits and competitive advantages have been reported. However, despite the potentials and benefits of BIM technologies, it is not applied in the construction sector in Iraq just like many other countries of the world. The purpose of this research is to understand the uses and benefits of BIM for construction projects in Iraq. This purpose has been done by establishing a fr |
Integrated project delivery is collaboratively applying the skills and knowledge of all participants to optimize the project's results, increase owner value, decrease waste, and maximize efficiency during the design, fabrication, and construction processes. This study aims to determine IPD criteria positively impacting value engineering. To do this, the study has considered 9 main criteria according to PMP classification that already covers all project phases and 183 sub-criteria obtained from theoretical study and expert interviews (fieldwork). In this study, the SPSS (V26) program was used to analyze the main criteria and sub-criteria priorities from top to bottom according to their values of the Relative Importance In
... Show MoreConstruction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at cr
... Show MoreExperiment was conducted in Baghdad, three factor were used in this research included Two types of Plows included moldboard and disk plows which represented the main plot, Three forward speeds of the tillage was the second factor included 1.85, 3.75 and 5.62 km / h which represented sup plot , and Three levels of Soil Moisture was third factor included 21, 18 and 14 % in all of Vertical and Lateral Plowing Deviation, Practical and specific productivity, actual time for plowing one donam and appearance (goodness) of Tillage represented by the number of clods > 10 cm in silt clay loam soil with depth 22 cm were studied. the experiment was used Split – split plot design under randomized complete block design with three replications and Le
... Show MoreIn terms of each party's contribution to the common venture, partnership felt in several categories. It would be a complete partnership, that is, one in which all partnership, both capital and service; It could be an arrangement like the commenda (Arabic : Mudãraba , muqãraba , girãd) in which one party supplied the capital and the other service .
In Malikite and Hanaifite Law, It would take the form of a labor partnership, that is, one in which the only investment on the part of all its members was their skill or labor. In this last category of partnership, the captil itself considered solely or primarily of the labor of the partners.