Wastewater projects are one of the most important infrastructure projects, which require developing strategic plans to manage these projects. Most of the wastewater projects in Iraq don’t have a maintenance plan. This research aims to prepare the maintenance management plan (MMP) for wastewater projects. The objective of the research is to predict the cost and time of maintenance projects by building a model using ANN. The research sample included (15) completed projects in Wasit Governorate, where the researcher was able to obtain the data of these projects through the historical information of the Wasit Sewage Directorate. In this research artificial neural networks (ANN) technique was used to build two models (cost and time) for the maintenance of wastewater projects. The output shows there is a high correlation (R) between real and expected cost with 95.4%, minimized testing error (8.5%), and training error (19%). The mean absolute present error (MAPE) and Average Accuracy Percentage (AA) are (13.9% and 86.1%) respectively. Also, the results showed a strong correlation (R) between actual and predicted time (99.1%), minimized testing error (8%), and an additional MAPE% and AA% with (11.7% and 88.3%) respectively. These models are in agreement with the real values, as well as gives good prediction for future maintenance projects.
Three stations were chosen on the water treatment plan of al- madaan .The Samples collected from the (Raw water) and the Sedimentation, filtration and storage water and the drinking water of outlet. Coliform densities T.S and F.C and TS and F.S and total bacterial count as bacteriological pollution indicators, as moste probable number (MPN) method was studied in test. Also some of the chemical characteristics of the water like pH , total suspended solid T.S.S, T.D.D.and S04 , T.Hardness , Ca++ , Mg++ . From the results it were indicated . The study showed the drinking water of outlet (distriputed in system) was agree with WHO criteria and Iraqi limits standards .
Teaching through the system of personal learning, known as (Clare's plan) is amongst the most prominent plans which depend on self-education, as it received worldwide recognition. The plan lets the learner achieve learning by depending on himself after being familiar with the educational goals given to him, then he starts to solve the exercises and the drills accompanying the unit. After that, he checks his achievement by answering the self-evaluation tests. This method offers more opportunities for personal interaction than do the traditional systems, and individual leaning is a methodical expression aims at taking care of the learner and making him the locus of the processes of teaching and learning.
Aims of the study
... Show MoreIs to obtain competitive advantage legitimate objective pursued by all organizations to achieve, because they live today in environments of rapid change and dynamic in order to meet the demands of the customer changing as well as intense competition between the organizations, which requires them to get the location of competitive markets in order to do this will remain to do the building and strengthening competitive advantage to be able to achieve, but that this feature is not easy and is not only through the identification and use of a successful strategy for a competitive standard and then manage it successfully. Hence the research problem of determining the sources of differentiation strategy and its impact on the dimensions of compe
... Show More1.
Embryonic Origin of Neural Tube Defects.
Insaf Jasim Mahmoud
2.
Etiology of Neural Tube Defectss.
Ali Abdul Razzak Obed
3.
Epidemiology of Neural Tube Defects in Iraq.
Mahmood Dhahir Al-Mendalawi
4.
Surgical Management of Neural Tube Defects.
Laith Thamer Al-Ameri
5.
Prevention of Neural Tube Defects in Iraq.
Mahmood Dhahir Al-Mendalawi
The present study aims to establish an empirical correlation between biochemical oxygen demand (BOD5) and chemical oxygen demand (COD) of the sewage flowing in Al-Diwaniyah wastewater treatment plant. The strength of the wastewater entering the plant varied from medium to high. High concentrations of BOD5 and COD in the effluent were obtained due to the poor performance of the plant. This was observed from the BOD5 /COD ratios that did not confirm with the typical ratios for the treated sewage. Regression equations for BOD5 and COD removal percentages were suggested which can be used to evaluate rapid effluent assessment after the treatment processes or optimal process control to improve the performance of wastewater treatment plants.
... Show MoreThe present study investigates the application of a combined electrocoagulation-electrooxidation (EC-EO) process for the treatment of wastewater generated from Al-Dewaniya petroleum refinery plant in Iraq. The EC-EO process was examined in terms of its ability to simultaneously produce coagulant and oxidant agents by using a parallel plate configuration system composed of stainless steel plates as cathode and pair of aluminum and graphite plates as anode at two different current concentrations (1.92A/l and 0.96A/l). The results showed that the best conditions for treatment of Al-Dewaniya petroleum refinery wastewater using the combined approach were current concentration of (0.96A/l), current density
The research aims to show the relationship between artificial intelligence in accounting education and its role in achieving sustainable development goals in the Kingdom of Bahrain. The research dealt with the role of artificial intelligence applications in accounting education at the University of Applied Sciences as a model for Bahraini universities to achieve sustainable development goals. The application of artificial intelligence in accounting education achieves seven of the seventeen sustainable development goals. It also concludes that there is an artificial intelligence infrastructure in the Kingdom of Bahrain, as it occupies a leading regional position in digital transformation, as Bahrain ranks first in the Arab world i
... Show MoreIt is well known that the rate of penetration is a key function for drilling engineers since it is directly related to the final well cost, thus reducing the non-productive time is a target of interest for all oil companies by optimizing the drilling processes or drilling parameters. These drilling parameters include mechanical (RPM, WOB, flow rate, SPP, torque and hook load) and travel transit time. The big challenge prediction is the complex interconnection between the drilling parameters so artificial intelligence techniques have been conducted in this study to predict ROP using operational drilling parameters and formation characteristics. In the current study, three AI techniques have been used which are neural network, fuzzy i
... Show More