The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings
...Show More Authors

In the construction of buildings usually, problems occur because of the causes of change orders. The main causer of change orders is the owners, consultants, and contractors. These changes lead to conflicts among them which result in influencing building projects. Therefore, it is necessary to analyze the causes of change orders to reduce them and facilitate management. This paper determines the most critical factors that cause change orders from a different point of view, a consulting owner and a contractor, and a study of the reality of the management of change orders when constructing public buildings. The method employed in this research is a field survey using interviews with experts working in the construction of public buildings. Furthermore, the questionnaire was distributed manually and electronically.

In conclusion, it would appear that the causes of change orders have been hierarchically according to the viewpoint of the owner, contractor, and consultant. The analysis leads to the following conclusions: Agreement of viewpoints owners, contractors, and consultants on the critical causes of variation orders were: ( the difficult financial situation - change material specifications to benefit the project - technical necessity  - the nature of the site). Moreover, the point of view (owners and contractors) on the essential factors that cause change orders were: (preparing a bill of quantities is inaccurate - weak consultant guess ). In contrast, the consultant's point of view differs, as he considers these causes ineffective. It can be interpreted that the consultant sees these factors as insignificant because of his duty to implement the bill of quantities and designs. This research paper concludes that a complex causal relationship exists between the causes of change orders. The relative importance index (RII) for variation order causes varies among different groups' viewpoints (owners, contractors, and consultants).

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Apr 30 2025
Journal Name
Iraqi Journal Of Science
Calculating the Variation of the Universal Parameter (Variable) Using Kepler's Equation for Different Orbits
...Show More Authors

Stumpff functions are an infinite series that depends on the value of z. This value results from multiplying the reciprocal semi-major axis with a universal anomaly. The purpose from those functions is to calculate the variation of the universal parameter (variable) using Kepler's equation for different orbits. In this paper, each range for the reciprocal of the semi-major axis, universal anomaly, and z is calculated in order to study the behavior of Stumpff functions C(z) and S(z). The results showed that when z grew, Stumpff functions for hyperbola, parabola, and elliptical orbits were also growing. They intersected and had a tendency towards zero for both hyperbola and parabola orbits, but for elliptical orbits, Stumpff functions

... Show More
Preview PDF
Publication Date
Tue Dec 22 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The causes of the fire and its impact accidents compensation insurance companies: Applied Research in a sample of the general insurance companies
...Show More Authors

      The subject of the evolution of fire insurance of the hottest topics accidents, because it falls within the commercial insurance, as its importance is reflected for being a security source and contentment of the insured person and so it is worth pointing out the importance of fire insurance in enterprises and organizations of all kinds, because of the guarantee of its assets from meridian as well as protection from the effects of the fire therefore ensure continuity in the performance of their activities

View Publication Preview PDF
Publication Date
Sun Jul 01 2007
Journal Name
Journal Of Faculty Of Medicine Baghdad
A Comparative Study of the Frequency of Occurrence of Genetic Skeletal Disorders in Iraq before and after the Second Gulf War, 1991
...Show More Authors

BACKGROUND: Genetic skeletal abnormalities are a heterogeneous group of genetic disorders frequently presenting with disproportionate short stature. AIM OF THE STUDY: To give an idea about the frequency of genetic skeletal abnormalities, and to find out whether these disorders are really increasing in the last 16 years or not. METHODS: During the period extending from (Jan, 1st 2003-April, 1st 2007), all cases of genetic skeletal disorders referred to the Genetic Counseling Clinic, Medical City – Baghdad who were born after 1991 were included in this study as the post-war group; the pre-war group, included all cases of skeletal disorders referred prior to 1991 (Jan., 1st 1987-Jan., 1st 1990). The demographic parameters, family history of

... Show More
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Sat Sep 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Evaluation of the performance of scheduling The implementation of school buildings projects: (Project of the Ministry of Education No. 1)
...Show More Authors

It highlights the importance of construction projects because of its significant role in the development of society, including the buildings FEDE projects to their importance to raise the level of education through the conclusion of the special to implementation and the establishment of schools of contracts at the country level, which requires the completion of the project at less time and within the cost specified and the best quality and may highlight the importance of time on all the elements of what has an important role in setting up the project for various reasons may be the need for the use of schools as soon as possible, but the reality showed exceeded the completion of those schools could be up to 6 years and there are some cont

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo</p> ... Show More
Scopus (7)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Al-academy
Employing the elements of film construction in embodying the style cinematically: عامر الحديثي
...Show More Authors

The researcher concluded that it consists of several types of structures, where the intellectual structure related to the choice of the idea, its treatment, its effect, the choice of the topic, the way ideas are addressed and presented in the film, and then the dramatic structure of the film's characters, the formulation of its events, its dramatic composition, its temporal arrangement, the identification of the parties to the conflict and their management, then these are formulated. Visions and ideas through the visual and audio signal systems, which work to highlight the stylistic features in the character of the film director.

View Publication Preview PDF
Crossref
Publication Date
Mon Oct 31 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
The adoption of green management in Iraqi construction industry: The challenges and benefits
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Sun Jun 05 2011
Journal Name
Baghdad Science Journal
The study of antibacterial activity of some plant extracts against causes of pneumonia
...Show More Authors

Eighty five samples were taken from patients suffering from pneumonia. Seventy-eight isolates were diagnosed as following: Staphylococcus aureus (23), klebsiella pneumoniae (29), Streptococcus pneumoniae (15), Serratia sp. (4), Haemophilus influenzae (4) and Pseudomonas aeruginosa (3). The clinical isolates were tested for antibiotics sensitivity. They appeared highly resistance to penicillin G and Ampicillin at percentage 89.7 and 84.6% respectly while the results showed highly sensitivity to streptomycin at percentege of (12.8%). To study the antibacterial activity of Alium sativum, Eucalyptus microtheca leaves and Cydonia oblonga seeds extracts, five multi resistant strains were used by using agar well diffusion and disk methods at c

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref