Preferred Language
Articles
/
joe-1578
Evaluation of Elaj Irrigation Project in Babil Governorate
...Show More Authors

Climate change causes water shortage (water scarcity) in addition to the dams built by neighboring countries, which caused a lack of Iraq's water share. Therefore, evaluating the irrigation system requires considering its suitability, adequacy, and efficiency. Irrigation is considered adequate when it maintains water availability within the root zone, and if the amount to be added is determined, irrigation efficiency becomes possible by avoiding water loss. Babil Governorate is considered one of the agricultural governorates in the country that depends on its irrigation from Shatt Al-Hilla. The study area is the Elaj project. Three fields were selected for the project (B1, B2, and B3). These fields are located at the project's beginning, middle and end. The evaluation was based on the field measurements of water contents before and after watering during the growing season. Also, the root zone of each plant during the growing season is measured to give more accurate calculations. Accordingly, application efficiency, conveyance efficiency, distribution efficiency, storage efficiency, water productivity efficiency, and water use efficiency were calculated in the project. The application efficiency for the selected fields ranged between (33 to 39) % in B1, (32 to 38) % in B2, and (32 to 39) % in B3. The application efficiency in all fields increased by about 6% during the third watering period between (22/3/2021 to 4/4/2021) due to the low water level in Shatt Al-Hilla during maintenance work that lasted more than a month. The efficiency of the scheme [ηs%] in the project is 32.3%. This value is low and reflects the reality of irrigation in the Babil. Therefore, improvements must be made to the irrigation system.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Jan 01 2018
Journal Name
Biochemical And Cellular Archive
Irrigation intervals affect dhn1 expression and some physiological parameters in stay green and non-stay-green sorghum
...Show More Authors

Scopus (11)
Scopus
Publication Date
Thu Apr 11 2024
Journal Name
Euphrates Journal Of Agriculture Science
Effect of cultivars and irrigation periods on some growth and yield indicators for watermelon
...Show More Authors

Publication Date
Wed Mar 02 2022
Journal Name
Journal Of Educational And Psychological Researches
Organizational Loyalty according to Transformational Leadership of the Headmasters of Middle Schools in Wasit Governorate
...Show More Authors

The main aim of this research is to: 1) identify the Transformational Leadership of the Managers of higher School in ALkut district and its relationship with organizational Loyalty. 2) Clarify the relationship between Transformational Leadership and organizational Loyalty. Regarding the research methodology, the researcher used the descriptive method because it meets this research. The two research tools were a questionnaire and the statistical program (spss). The results revealed that there is a strong positive relationship between Transformational Leadership and organizational Loyalty, which means that when the managers have a Transformational Leadership leads to having organizational loyalty.

View Publication Preview PDF
Publication Date
Sat Feb 01 2020
Journal Name
Journal Of Green Engineering
Water distribution and interference of wetting front in stratified soil under a continues and an intermittent subsurface drip irrigation
...Show More Authors

Scopus (6)
Scopus
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Using Water Quality Index to Assess Drinking Water For AL-Muthana Project
...Show More Authors

The water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not been met du

... Show More
Crossref (3)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Using Water Quality Index to Assess Drinking Water For AL-Muthana Project
...Show More Authors

The water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
A spherical fuzzy AHP model for contractor assessment during project life cycle
...Show More Authors
Abstract<p>Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance pa</p> ... Show More
View Publication
Scopus (7)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Thu Jun 10 2021
Journal Name
Engineering, Technology &amp; Applied Science Research
Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive meas

... Show More
View Publication
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
...Show More Authors

Abstract

          The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the     life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's  management  experience is how to achieve thes

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue May 24 2022
Journal Name
International Journal Of Occupational Safety And Ergonomics
Contributions of safety critical success factors and safety program elements to overall project success
...Show More Authors

View Publication
Scopus (18)
Crossref (14)
Scopus Clarivate Crossref