The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of a construction project, this study constructed the matrix of probability and impact variables and put the periods based on the risk score. Finally, this study identified a fourth main risk group and twenty-two sub-risk factors that are appropriate for the tendering phase of construction projects in Iraq
In this paper, The transfer function model in the time series was estimated using different methods, including parametric Represented by the method of the Conditional Likelihood Function, as well as the use of abilities nonparametric are in two methods local linear regression and cubic smoothing spline method, This research aims to compare those capabilities with the nonlinear transfer function model by using the style of simulation and the study of two models as output variable and one model as input variable in addition t
... Show MoreSignificant advances in horizontal well drilling technology have been made in recent years. The conventional productivity equations for single phase flowing at steady state conditions have been used and solved using Microsoft Excel for various reservoir properties and different horizontal well lengths.
The deviation between the actual field data, and that obtained by the software based on conventional equations have been adjusted to introduce some parameters inserted in the conventional equation.
The new formula for calculating flow efficiency was derived and applied with the best proposed values of coefficients ψ=0.7 and ω= 1.4. The simulated results fitted the field data.
Various reservoir and field parameters including late
New designs of solar using ray tracing program, have been presented for improved the performance and the out put power of the silicon solar cell, as well as reducing the cost of system working by solar energy. Two dimensional solar concentrator (Fresnel lenses) and three dimensional concentrators (parabola dish and cassegrain) were used as concentrator for photovoltaic applications (CPV). The results show that the performance efficiency and out power for crystalline silicon solar cells are improved.
The migration from IPv4 to IPv6 can not be achieved in a brief period, thus both protocols co-exist at certain years. IETF Next Generation Transition Working Group (NGtrans) developed IPv4/IPv6 transition mechanisms. Since Iraq infrastructure, including universities, companies and institutions still use IPv4 protocol only. This research article tries to highlight, discuss a required transition roadmap and extend the local knowledge and practice on IPv6. Also, it introduces a prototype model using Packet tracer (network simulator) deployed for the design and implementation of IPv6 migration. Finally, it compares and evaluates the performance of IPv6, IPv4 and dual stack using OPNET based on QoS metrics such as throughput, delay and point to
... Show MoreAbstract
The research aims to study the problem of high production costs and low quality and the use of total quality management tools to detect problems of the high cost of failure and low quality products, diagnosis, and developing appropriate solutions.
To achieve the goal, we studied the overall quality tools and its relationship with the costs and the possibility of improving quality through the use of these tools.
Was limited to these tools and study the relation to the reduction of costs and improving quality have been studied serially by the possibility of the reduction.
To achieve the goal, the study of the concept of total quality management
Traditional accounting takes only one dimension (economic) in calculating the value added of the company, and all other aspects (including environmental and social) are neglected, and despite the emergence of Sustainability Accounting and the interest of companies in preparing sustainability reports, these reports are suffering from many problems, including multiple metrics used in measuring companies (cash, quantity and lavish). In addition, these reports may reach dozens of pages in some companies and this causes the problem (information overload) which affects the qualitative properties of accounting information such as appropriate and relative, which requires the need to find a tool that can measure the Sustainability Unit of
... Show MoreTraditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).