Liquefied petroleum gases (LPG) consist of hydrocarbons obtained by refining crude oil, either from propane or butane or a mixture of the two. There are often other components such as propylene, butylene or other hydrocarbons, but they are not the main component. The study aims to review previous studies dealing with designing an LPG system to deliver gas to residential campuses and buildings. LPG is extracted from natural gas NG by several processes, passing through fractionation towers and then pressuring into CNG storage tanks. Gas contains several problems, including gas leakage through the pipes and leads to fires or explosions in LPG storage and distribution tanks, so safety conditions were taken in the design and implementation. The major results are the gas leak detector showed that rapid response to gas leakage sense, so it is recommended to place the device at a distance of 0.6-2 meters from the gas source and at a distance of 0.2 to 1 meter above the ground, and the major conclusion is new techniques for using hardware and software components must be demonstrated again that can be applied to models to show fast and effective results.
The environmental problems that have emerged recently as a result of pressure on the environment due to the increase in population size, especially in urban cities, where this increase was accompanied by the need for housing as well as the need for services and activities. This led to the establishment of many vertical residential buildings represented by residential complexes within the urban fabric of the city of Baghdad. As part of following the methodology of urban dictation policies in empty areas, and to accommodate the largest number of residents as a result of the multiplicity of floors and housing, these buildings must be subject to the standards and requirements of sustainability at the level of their spatial location and their
... Show MoreThe Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha
... Show MoreIn this work the design and construction of optical pumping system was presented. The parameters of the pumping source to obtain discharge current density sufficient to shift the flash lamp spectrum towards uv portion of spectrum were measured.The current density was supplied to the flash lamp must be greater than 4000Amp./cm2 to obtain the spectral range wavelength lies between 0.2 and 0.35?m. The current density was obtained by a capacitor 50?F, at 7KV discharge voltage. The applied electrical energy to the flash lamp was more than 1200 J, and the current density was around 5000 Amp./cm2.The electrical parameters of the flash lamp were calculated. The impedance parameters(K0) from the voltage and the peak current pulse was measured in ran
... Show MoreMany studies and researches represented the importance of the planning and designing criteria's. Planning and Designing issue influence by three factors, firstly: The Present situation of life is always exchanging and developing. Secondly: Design work represents views of problem that never appear at the beginning of the work but only by plan implementation which need to in some cases to modifying the specify aims and criteria's. Thirdly: Never establish criteria's and aims that can be used as a reference before starting design and planning process. This research will study present situation of the services for residential areas criteria's and planning legitimate in some designed cities in Iraq with different levels (neighborhood,
... Show MoreThe characterization and design of this study of new liquid crystals with a V shape compounds containing thiazolidine-2,4-dione and 1,3-phenylene as a core unite with mesophase properties were reported. Preparation and characterization of chloroacetic acid, water, and thiourea to produce thiazolidine-2,4-dione [I] in the presence of strong hydrochloric acid. The 4-hydreoxybenzaldehyde and n-alkyl bromide were reacted with potassium hydroxide to create the n-alkoxy benzaldehyde., then the compound [I] reacted with [II]n in presence of piperidine to produce compounds [III]n. Also, converted resorcinol to a corresponding compound [IV] by refluxing pyridine and DMF with two moles of chlora
... Show MoreThe characterization and design of this study of new liquid crystals with a V shape compounds containing thiazolidine-2,4-dione and 1,3-phenylene as a core unite with mesophase properties were reported. Preparation and characterization of chloroacetic acid, water, and thiourea to produce thiazolidine-2,4-dione [I] in the presence of strong hydrochloric acid. The 4-hydreoxybenzaldehyde and n-alkyl bromide were reacted with potassium hydroxide to create the n-alkoxy benzaldehyde., then the compound [I] reacted with [II]n in presence of piperidine to produce compounds [III]n. Also, converted resorcinol to a corresponding compound [IV] by refl
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show Morehave suffered from deteriorating residential neighborhoods, poor economic, social and urban living conditions of the population and deteriorating the infrastructural and superior services. These problems were the secretions of these cities' rapid urbanization. Based on the principles of sustainable urban planning and in order to achieve adequate opportunities for the lives of the population and provide them with sustainable livelihoods, policies have emerged to upgrade along the lines of community participation and programmes to reform and develop those neighbourhoods, raise their efficiency and make them livable. Thus, the problem of research was identified "The absence of a comprehensive cognitive perception of the most prominent facto
... Show More