Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at crisis management, specifically in the basic stages chosen for its development, which are before, during, and after a crisis. Therefore, an effective crisis management system has been developed consisting of 20 critical success factors with devising 59 actions that can be taken for each proposed criterion for each of the three stages of crisis.
The current research aims to test the relationship of the entrepreneurial leadership and its factors (strategic factors, communication factors, personal factors, motivational factors) in managing the organizational crisis and its stages (detection of warning signs, readiness and prevention, containment of damages, restoration of activity, learning) among a sample of companies of the Ministry Water resources (Al-Fao State Company for the implementation of irrigation projects, Al-Rafidain Company for the implementation of dams, Iraq Company for the implementation of irrigation projects), as well as standing at the level of interest of the research companies in the search variables and their factors and stages, there is no doubt tha
... Show MoreMany risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreThe problem of the paper focused on the role of the learning organization in the crisis management strategy, and the extent of the actual interest in both the learning organization and the crisis management and aimed at diagnosing and analyzing that and surrounding questions. The Statistical Package for the Social Sciences (SPSS) program was used to calculate the results and the correlation coefficient between the two main variables. The methodology was descriptive and analytical. The case study was followed by a questionnaire that was distributed to a sample of 31 teachers. The paper adopted a seven-dimensional model of systemic thinking that encourages questioning, empowerment, provision of advanced technologies, and strategic lea
... Show MoreConstruction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show MorePortable devices such as smartphones, tablet PCs, and PDAs are a useful combination of hardware and software turned toward the mobile workers. While they present the ability to review documents, communicate via electronic mail, appointments management, meetings, etc. They usually lack a variety of essential security features. To address the security concerns of sensitive data, many individuals and organizations, knowing the associated threats mitigate them through improving authentication of users, encryption of content, protection from malware, firewalls, intrusion prevention, etc. However, no standards have been developed yet to determine whether such mobile data management systems adequately provide the fu
... Show MoreThe banking industry, as a result of the great challenges it faced, required continuous development of the principles of management, control and mechanisms used. The Basel Committee on Banking Supervision has played a leading role in legalizing many of these developments and has been able to contribute significantly to establishing a common framework for banking supervision, The central role in the various countries of the world is based on coordination between the various regulatory authorities and thinking about finding mechanisms to confront the risks faced by banks, recognizing the importance of the banking sector in the stability of domestic and international banking systems or the danger of this sector in the emergence of F
... Show MoreThe reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual
... Show More