Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadwork projects in Bahrain. The results are shown in terms of the sensitivity of changing one variable on the performance of all the 72 projects. These results can reflect on the methods currently used on contractors’ assessments in the tendering stage and support decision-makers in assessing contractors and selecting the best bidders.
The current research aims to analyze the content and and make a comparison based on the theory of art education as an organized cognitive area D.B.A.E. The researcher started by making a comparison followed by analysing the content to design a philosophical framework for content. He used these steps as starting point to study the comparison and some elements of art education due to the modern theories at the third intermediate stage in both Iraq and Egypt in light of the art education trend as an organizing cognitive area.
The study aims at showing the Importance of the Corporate of Governances to the Activate the quality and integrity of financial reports prepared inside the companies through explaining what they should be obliged to in writing the reports and financial and nonfinancial statements according to the international standards of accounting to be transparent and integral. It also aims at giving the independence that the auditors should enjoy through connecting them to an Auditing Commissions to submit additional services in addition to assessing the instrument of control to evaluate risks, give consultations and the services related to the governance and independence of Supervising Council. &
... Show MoreThe present research aims at identifying the effect of the cognitive discrepancy strategy on the fourth-stage students’ achievement in literature and texts. The researcher adopted the null hypothesis: there is no statistically significant difference at the level (0.05) between the average grades of the experimental group who study literature and texts following the discrepancies strategy, and those who follow the traditional method. A post-achievement test of (60) paragraphs was administered to (6) students as the study sample. The results showed that the experimental group who studied literature and texts with the strategy of cognitive achieved better than the control group who followed the traditional method in the post-achievement t
... Show MoreNear-ideal p-CdS/n-Si heterojunction band edge lineup has been investigated for the first time with aid of I-V and C-V measurements. The heterojunction was manufactured by deposition of CdS films prepared by chemical spray pyrolysis technique (CSP) on monocrystalline n-type silicon. The experimental data of the conduction band offset Ec and valence band offset Ec were compared with theoretical values. The band offset Ec=530meV and Ev=770meV obtained at 300K. The energy band diagram of p-CdS/n-Si HJ was constructed. C-V measurements depict that the junction was an abrupt type and the built-in voltage was determined from C-2-V plot
The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu
A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.
... Show More