Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadwork projects in Bahrain. The results are shown in terms of the sensitivity of changing one variable on the performance of all the 72 projects. These results can reflect on the methods currently used on contractors’ assessments in the tendering stage and support decision-makers in assessing contractors and selecting the best bidders.
This research aims to demonstrate the nature and concept of the Corona pandemic, its implications for the global economy, and the management and performance of companies in particular. Additionally, the research intends to measure the impact of the Corona pandemic on companies' financial performance. Listed on the Iraqi Stock Exchange, which has finished compiling its year-end financial statements for 2019-2020. The investigation arrived at several findings, the most significant of which was that most businesses were not prepared for such a crisis technologically or to develop human resources to deal with this pandemic. In addition, most companies experienced a decrease in their financial performance as a direct result of the Corona pandemi
... Show MoreAbstract :
The research aims to study the basic concepts of banking productivity and discuss different approaches to study what ends to identify the most important possible standards applied to measured within the Iraqi banking environment as well as research into the causes of low and high Iraqi banking productivity and identify possible treatments to curb those reasons as to ensure the rise. And in line with the research problem, which states what is the level of productivity and what are the causes of decline and the rise in private banking research sample individually. And what the Iraqi private banks and what is the relationship between performance and the impact of productivity change in the perform
... Show MoreThe last four decades have witnessed a number of rapid and successive international changes in terms of future impacts and orientations. International economy has transformed into a competitive small village due to the information technology revolution and the liberation processes and the economic openness that the market witnesses, there became one market and the activists in this international market are not governments only but rather international organizations and huge multinational corporations where each spares no effort to take every opportunity and face challenges within the frame of removing all impediments and release transactions under the auspices of these global developments, the idea of creating Islamic
... Show MoreObjectives: This study aimed to evaluate the performance of staff nurses at primary health care centers in Baghdad city and to compare them with their demographic characteristics of age, gender and education.
Methodology: A descriptive design was carried out at Baghdad City’s primary health care centers from January 2nd 2019 to May 1st 2020. An instrument was developed for the purpose of the study. A non-probability, multi-stage purposive sample of (52) staff nurses was recruited from nurses working at primary health care centers in Baghdad City. The instrument is used to evaluate staff nurses’ performance which includes (62) items. These items are divided to (13) main domains related to evaluation of work quantity, work quality,
Variation order plays an important role in calculating the final cost and time. The paper aims to determine the causes of variation orders in projects performed between 2007-2014 in Erbil governorate projects. Data was collected from contract documents. Performed in the Erbil governorate projects from 2007-2014. The study seeks to identify the most significant causes of delays by assessing the common causes of delays in terms of frequency, severity and
important indices of owners, consultants and contractors related to&n
... Show MoreThis paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t
... Show MoreThe study seeks the relationship between the mathematical-procedural Knowledge and the logical-mathematical intelligence among students at the third stage in mathematics department. To this end, three questions were arisen: what is the level of mathematical-procedural Knowledge among the third stage students in mathematics department regarding their gender? Do male or female students have more logical-mathematical intelligence and are there significant differences base on their gender? What kind of correlation is between the level of mathematical-procedural Knowledge and the logical-mathematical intelligence of male and female students in the third stage in the mathematics department? A sample of (75) male and female students at the thir
... Show MoreThat the building of the national economy depends on the extent of the possibility of transition from the rent economy seeking to increase GDP (GDP1), and the tendency to manage projects with external sources of funding, or allow projects with foreign capital is a necessity. The strategic challenges faced by the economy in countries that have experience in investment projects have faced several factors internal and external for a period of time and not a few and the pressures and difficulties and failures have affected in one way or another on the development work in that country. On this basis, the stakeholders have a role to pay attention to the issue of the feasibility of the pattern of foreign investment in the investment environment
... Show MoreIn this work, porous silicon (PS) are fabricated using electrochemical etching (ECE) process for p-type crystalline silicon (c-Si) wafers of (100) orientation. The structural, morphological and electrical properties of PS synthesized at etching current density of (10, 20, 30) mA/cm2 at constant etching time 10 min are studied. From X-ray diffraction (XRD) measurement, the value of FWHM is in general decreases with increasing current density for p-type porous silicon (p-PS). Atomic force microscope (AFM) showed that for p-PS the average pore diameter decreases at 20 mA. Porous silicon which formed on silicon will be a junction so I-V characteristics have been studied in the dark to calculate ideality factor (n), and saturation current (Is
... Show More