Background: Acute cholecystitis is common surgical
problem, which was treated previously by conservative
treatment .Later early open has been introduced as an
alternative to interval for treatment of acute cholecystitis.
Early open was found to be a safe, successful with
comparable postoperative complication rate. With the
advent of laparoscopy laparoscopic have been used for
chronic cholecystitis and became the first line of
treatment. New reports have shown that laparoscopic can
be used as an alternative to open for surgical treatment of
acute cholecystitis.
Objectives: to compare the success, safety of early
laparoscopic versus early open as a primary treatment of
acute cholecystitis.
Methods: out of 68 patients were treated for clinical
acute cholecystitis between January 2002 and February
2004 in the department of surgery, at Al – Kindy teaching
hospital. A total of 62 patients underwent early for acute
cholecystitis as soon as possible after diagnosis. The
preferred preoperative imaging technique was ultrasound.
30 (48.3%) of the operations were attempted
laparoscopically, whereas the remaining 32 patients
(51.7%) underwent initial open .
Results: The mean operative time for the open cases
was 75 minutes versus 60 minutes for the laparoscopic
group. There was no perioperative mortality in either
group. The incidence of conversion to open was 10% (3
patients). Surgical complications related to laparoscopic
and open occurred in 2 (6.6%) and 3 (9.3%) cases,
respectively. There was no difference between the open
and laparoscopic groups in regard to the major
postoperative complications.
Conclusion: The current study shows that early
(whether performed by open or laparoscopically) is a
safe and effective treatment for acute cholecystitis. Low
conversion rates can be maintained with strict guidelines
for appropriate patient selection, adequate experience,
and proper laparoscopic technique.
Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies l
... Show MoreThe research aims to investigate the effects of GMAW or MIG welding process on the mechanical properties of dissimilar aluminum alloys 2024-T351 and AA 6061- T651. A series of experimental techniques have been conducted to evaluate mechanical properties of the alloys, by carrying out hardness, tensile and bending tests for welded and un-welded specimens.
Metal inert gas (MIG) has been carried out on sheet metal using ER- 4043(AlSi5) as a filler metal and argon as shielded gas. The welded joints were tested by X-ray radiography and Faulty pieces were excluded.
Welding joints without defects are subjected to heat treatment including heating the joints in furnace to 170 °C for half an hour then air cooling to rel
... Show MoreImproving the ability of asphalt pavement to survive the heavily repeated axle loads and weathering challenges in Iraq has been the subject of research for many years. The critical need for such data in the design and construction of more durable flexible pavement in bridge deck material is paramount. One of new possible steps is the epoxy asphalt concrete, which is classified as a superior asphalt concrete in roads and greatly imparts the level of design and construction. This paper describes a study on 40-50 penetration graded asphalt cement mixed with epoxy to produce asphalt concrete mixtures. The tests carried out are the Marshall properties, permanent deformation, flexural fatigue cracking and moisture damage. Epoxy asphalt mixes perf
... Show MoreBroyden update is one of the one-rank updates which solves the unconstrained optimization problem but this update does not guarantee the positive definite and the symmetric property of Hessian matrix.
In this paper the guarantee of positive definite and symmetric property for the Hessian matrix will be established by updating the vector which represents the difference between the next gradient and the current gradient of the objective function assumed to be twice continuous and differentiable .Numerical results are reported to compare the proposed method with the Broyden method under standard problems.