Preferred Language
Articles
/
jkmc-73
Electrocautery versus cold steel tonsillectomy comparison study
...Show More Authors

Objective: the objective of this study was to compare the intraoperative blood loss, intraoperative time, postoperative pain and secondary hemorrhage between electrodissection and cold steel dissection tonsillectomy.

Methods: One hundred and six patients were enrolled in this study, the patients were randomly allocated into electrodissection group A (n=51) and cold steel dissection tonsillectomy group B (n=53). All patients are above 7 years and had history of recurrent tonsillitis and/or tonsillar hypertrophy with obstructive symptoms. Intraoperative parameters and postoperative outcome were assessed.

Results: In group A patients had statically significant less operative time and blood loss than group B early postoperative pain was not differ significantly between the two groups, however late onset pain (pain on the 7th day) was significantly higher in group A. There was no significant difference between the groups regarding secondary hemorrhage.

Conclusion: Electrodissection tonsillectomy is rapid, safe and effective method of tonsillectomy with obvious advantage of minimum perioperative blood loss, lower operative time and without early post-operative pain difference when compared to cold steel dissection tonsillectomy. Although it has some disadvantage of late postoperative pain.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Structures
Horizontal pushout tests and parametric analyses of a locking-bolt demountable shear connector
...Show More Authors

A ‘locking-bolt’ demountable shear connector (LBDSC) is proposed to facilitate the deconstruction and reuse of steel-concrete composite structures, in line with achieving a more sustainable construction design paradigm. The LBDSC is comprised of a grout-filled steel tube and a geometrically compatible partially threaded bolt. The latter has a geometry that ‘locks’ the bolt in compatible holes predrilled on the steel flange and eliminates initial slip and construction tolerance issues. The structural behaviour of the LBDSC is evaluated through nine pushout tests using a horizontal test setup. The effects of the tube thickness, strength of concrete slab, and strength of infilled grout on the shear resistance, initial stiffness, and du

... Show More
View Publication
Scopus (25)
Crossref (24)
Scopus Clarivate Crossref