Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model will give project managers a significant tool for replanning projects allocation decisions in response events and outcomes. As a result, the uncertainty associated with such risky projects should be reduced.     

  No one factor can account for, or prevent, failure in a project. It is common practice for a project team to develop a comprehensive risk assessment and risk management plan. Identifying the most critical activities with regard to schedule risk is a problem faced by all project managers.

  The problem of identifying critical activities (CA) in a deterministic network is well understood, by standard Critical Path Method (CPM) known as Program Evaluation and Review Technique (PERT). Since a project could be delayed if these activities were not completed in the scheduled time. The classical PERT method is the probably is the best-known mechanism for considering the stochastic nature of activity durations, in which it is possible to develop estimates of the uncertainty of the project make span. For more details see [8] & [10 ].

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (4)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Sun Oct 27 2024
Journal Name
Journal Of Economics And Administrative Sciences
An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)
...Show More Authors

The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim

... Show More
Preview PDF
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
An Applying the Delphi Technique for Eliciting Criteria in Equipment and Materials Used in Highway Construction Projects
...Show More Authors

This article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a

... Show More
View Publication Preview PDF
Scopus (4)
Crossref (4)
Scopus Crossref
Publication Date
Thu Jun 20 2019
Journal Name
Baghdad Science Journal
The Impact of Agile Methodologies and Cost Management Success Factors: An Empirical Study
...Show More Authors

Software cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on

... Show More
View Publication Preview PDF
Crossref (5)
Clarivate Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
The Concept of Fairness Accounting and its Role in Reducing Earnings Management Practices
...Show More Authors

The aims of research is diagnose and indicate the role of fairness in the work of accounting, which is important in reducing the unacceptable practices to manage earnings by economic units, As well as the interpretation and indicate Ethical inside in the accounting and accountants in particular practices in the area of ​​earnings management to reduce the negative effects of the practice and display the results mentioned acts according to what is supposed to be for the purposes of service users, Researchers have identified that one hypothesis, that "Fairness of accountants in of their work accounting lead to a reduction of earnings management practices". The results suggest that the accounting practices that lead to the manipu

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 07 2019
Journal Name
Iraqi Journal Of Laser
Acne Scar Management by Fractional CO2 Laser
...Show More Authors

Acne scars are one of the most common problems following acne vulgaris. Despite the extensive list of available treatment modalities, their effectiveness depends upon the nature of the scar. Ablative lasers had been used to treat acne scars; one of them is the fractional CO2 laser. The aim of this study is to evaluate the outcome of fractional CO2 laser in the treatment of acne scars. Methods: Since January 2010 to June 2013, using 10600 nm fractional CO2 laser beams, the acne scar of 400 patients, 188 males and 212 females, mean age of 34 years, have been treated and classified according to severity into four grades following Goodman and Baron classification. Each patient underwent 3-5 sessions once monthly. The mean laser exposure time

... Show More
View Publication Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
4th International Conference On Distributed Sensing And Intelligent Systems (icdsis 2023)
EcoSavvy: revolutionizing waste management in smart cities
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Mon Apr 01 2019
Journal Name
Journal Of Educational And Psychological Researches
Life Management Strategies among Mosul University Academics
...Show More Authors

The study aims to measure life management (in its various approaches) among   university academics and to identify the differences among life management strategies (in its various approaches) in regard of gender (male, female), field of education (scientific, humanitarian) and title (assistant lecturer, lecturer, assistant professor, and professor). The study sample consisted of (246) male and female academics from four colleges (Arts, Science, Science education, and Humanitarian Science Education). To achieve the goals of the study, the researchers used the Freund & Baltes (2002) life-management strategies scale after translating it and determining its parameters of reliability and validity. The statistical analysis of the

... Show More
View Publication Preview PDF
Publication Date
Tue Mar 30 2021
Journal Name
Baghdad Science Journal
Delivery Route Management based on Dijkstra Algorithm
...Show More Authors

For businesses that provide delivery services, the efficiency of the delivery process in terms of punctuality is very important. In addition to increasing customer trust, efficient route management, and selection are required to reduce vehicle fuel costs and expedite delivery. Some small and medium businesses still use conventional methods to manage delivery routes. Decisions to manage delivery schedules and routes do not use any specific methods to expedite the delivery settlement process. This process is inefficient, takes a long time, increases costs and is prone to errors. Therefore, the Dijkstra algorithm has been used to improve the delivery management process. A delivery management system was developed to help managers and drivers

... Show More
View Publication Preview PDF
Scopus (4)
Scopus Clarivate Crossref