This paper deals with constructing a model of fuzzy linear programming with application on fuels product of Dura- refinery , which consist of seven products that have direct effect ondaily consumption . After Building the model which consist of objective function represents the selling prices ofthe products and fuzzy productions constraints and fuzzy demand constraints addition to production requirements constraints , we used program of ( WIN QSB ) to find the optimal solution
The purpose of this paper is use the Dynamic Programming to solve a deterministic periodic review model for inventory problem and then to find the optimal policies that the company must uses in the purchase or production (in the practical application example the Al Aksa company purchase the generators from out side country).
Reliability has an important role in both the industrial and engineering applications. So the need for Reliability Tests appeared are series of tests a discover out of factors that appear through the test, knowledge limit of fit a specifics production addition for getting on goodness of production.
Therefore, the need for research to test for censor data from ( Type II ) for exponential distribution with one parameter and that test it’s (Reliability Growth) includes three curves are Idealized Growth curve estimation parameters and reliability with maximum likelihood method, Duane Growth curve takes estimation parameters and reliability with least squares method, Exponential Reliability Growth Cur
... Show MoreThe main purpose of this work is to introduce some types of fuzzy convergence sequences of operators defined on a standard fuzzy normed space (SFN-spaces) and investigate some properties and relationships between these concepts. Firstly, the definition of weak fuzzy convergence sequence in terms of fuzzy bounded linear functional is given. Then the notions of weakly and strongly fuzzy convergence sequences of operators are introduced and essential theorems related to these concepts are proved. In particular, if ( ) is a strongly fuzzy convergent sequence with a limit where linear operator from complete standard fuzzy normed space into a standard fuzzy normed space then belongs to the set of all fuzzy bounded linear operators
This Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and th
... Show MoreThis research deals with the attitude of oil press towards oil industry in the world and the extent of their concerns with the stages of oil industry relating to the abundance of oil and natural gas, as it is an international strategic and complementary industry. The researcher uses the survey method for content analysis of the initial article and the press news for two: years (2011-2012). The results if the study are as follows
1- Oil press is concerned with developing and the stages of the Arabic oil industry in the interest of OAPEC in the first place.
2- It is concerned with exploring, extracting, and marketing oil in the first place, then with refining operations in refineries and petrochemical plants in the second place, an
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show MoreThe present research aims to test the effect of cognitive complexity as an independent variable in organizational agility as a responsive variable among the leaders working at the headquarters of the Iraqi Petroleum Products Distribution Company.
To conclude a number of recommendations that contribute in the organizational agility in the company, and due to the importance of this research in public organizations and its notable role in community organizations. The research was carried out on a random sample of 101 individuals out of a total of 308, which represents the high leaders in the company (general managers, head of departments, and division officials). A questionnaire was used as information
... Show MoreIn this research was to use the method of classic dynamic programming (CDP) and the method of fuzzy dynamic programming (FDP) to controlling the inventory in N periods and only one substance ,in order to minimize the total cost and determining the required quantity in warehouse rusafa principal of the ministry of commerce . A comparison was made between the two techniques، We found that the value of fuzzy total cost is less than that the value of classic total cost
The linear segment with parabolic blend (LSPB) trajectory deviates from the specified waypoints. It is restricted to that the acceleration must be sufficiently high. In this work, it is proposed to engage modified LSPB trajectory with particle swarm optimization (PSO) so as to create through points on the trajectory. The assumption of normal LSPB method that parabolic part is centered in time around waypoints is replaced by proposed coefficients for calculating the time duration of the linear part. These coefficients are functions of velocities between through points. The velocities are obtained by PSO so as to force the LSPB trajectory passing exactly through the specified path points. Also, relations for velocity correction and exact v
... Show More