The way used to estimate the fuzzy reliability differs according to the nature of the information of failure time which has been dealt in this research.The information of failure times has no probable distribution to explain it , in addition it has fuzzy quality.The research includes fuzzy reliability estimation of three periods ,the first one from 1986 to 2013,the second one from 2013 to 2033 while the third one from 2033 to 2066 .Four failure time have been chosen to identify the membership function of fuzzy trapezoid represented in the pervious years after taking in consideration the estimation of most researchers, proffional geologists and the technician who is incharge of maintaining of Mosul Dam project. By using matlab programme , acpecial programme of research was designed to estimate the fuzzy reliability of last three periods ,according to the results it was found that fuzzy reliability of Al.mosul dam in the recent time reaches to 0.5 approxmatly while the fuzzy reliability of Al.mosul dam after 20 years will reach to 0.1,ie, the danger of actual collapse of the dam will be in 2033 ,So that it is important to build a new dam making sure from chosing a suitable location with respect to soil quilty , geological and clamatic which suround the location , This is to avoid the same mistake which makes us lose 33 years from the hypothetical life time of Mosul dam according to the estimation of the company which build the dam.
Significant advances in horizontal well drilling technology have been made in recent years. The conventional productivity equations for single phase flowing at steady state conditions have been used and solved using Microsoft Excel for various reservoir properties and different horizontal well lengths.
The deviation between the actual field data, and that obtained by the software based on conventional equations have been adjusted to introduce some parameters inserted in the conventional equation.
The new formula for calculating flow efficiency was derived and applied with the best proposed values of coefficients ψ=0.7 and ω= 1.4. The simulated results fitted the field data.
Various reservoir and field parameters including late
This work aimed to estimate the frequency of mitochondrial inborn errors of metabolism (MIEMs) in patients presenting with family history and IEM-picture who referred for advance IEM assay in Mosul province and Kurdistan region. This study was observational study conducted on 364 cases referred from different general /or private pediatric clinics with unexplained sign and symptoms and suspension of mitochondrial dysfunction. The study included 364 children with an age ranging from 1 month to 1 year. Started from January 2018 to January 2020. All patients referred with their full history review, notes about their clinical examination, and laboratory investigations including blood ammonia, serum lactate/ pyruvate, arterial blood gases. In
... Show MoreThis paper shews how to estimate the parameter of generalized exponential Rayleigh (GER) distribution by three estimation methods. The first one is maximum likelihood estimator method the second one is moment employing estimation method (MEM), the third one is rank set sampling estimator method (RSSEM)The simulation technique is used for all these estimation methods to find the parameters for generalized exponential Rayleigh distribution. Finally using the mean squares error criterion to compare between these estimation methods to find which of these methods are best to the others
Productivity estimating of ready mixed concrete batch plant is an essential tool for the successful completion of the construction process. It is defined as the output of the system per unit of time. Usually, the actual productivity values of construction equipment in the site are not consistent with the nominal ones. Therefore, it is necessary to make a comprehensive evaluation of the nominal productivity of equipment concerning the effected factors and then re-evaluate them according to the actual values.
In this paper, the forecasting system was employed is an Artificial Intelligence technique (AI). It is represented by Artificial Neural Network (ANN) to establish the predicted model to estimate wet ready mixe
... Show MoreRutting is a crucial concern impacting asphalt concrete pavements’ stability and long-term performance, negatively affecting vehicle drivers’ comfort and safety. This research aims to evaluate the permanent deformation of pavement under different traffic and environmental conditions using an Artificial Neural Network (ANN) prediction model. The model was built based on the outcomes of an experimental uniaxial repeated loading test of 306 cylindrical specimens. Twelve independent variables representing the materials’ properties, mix design parameters, loading settings, and environmental conditions were implemented in the model, resulting in a total of 3214 data points. The network accomplished high prediction accuracy with an R
... Show MoreEstimation of the names and verbs of some letters to consider the grammatical industry
This paper deals with, Bayesian estimation of the parameters of Gamma distribution under Generalized Weighted loss function, based on Gamma and Exponential priors for the shape and scale parameters, respectively. Moment, Maximum likelihood estimators and Lindley’s approximation have been used effectively in Bayesian estimation. Based on Monte Carlo simulation method, those estimators are compared in terms of the mean squared errors (MSE’s).
تقدير النموذج اللوجستي باستخدام اوزان بيز المتسلسل
The purpose of this article is to improve and minimize noise from the signal by studying wavelet transforms and showing how to use the most effective ones for processing and analysis. As both the Discrete Wavelet Transformation method was used, we will outline some transformation techniques along with the methodology for applying them to remove noise from the signal. Proceeds based on the threshold value and the threshold functions Lifting Transformation, Wavelet Transformation, and Packet Discrete Wavelet Transformation. Using AMSE, A comparison was made between them , and the best was selected. When the aforementioned techniques were applied to actual data that was represented by each of the prices, it became evident that the lift
... Show MoreThe sunrise, sunset, and day length times for Baghdad (Latitude =33.34º N, Longitude =44.43º E) were calculated with high accuracy on a daily basis during 2019. The results showed that the earliest time of sunrise in Baghdad was at 4h: 53m from 5 Jun. to 20 Jun while the latest was at 7h: 07m from 5 Jan. to 11 Jan. The earliest time of sunset in Baghdad was at16 h: 55m from 30 Nov. to 10 Dec. whereas the latest was at 19h: 16m from 25 Jun. to 5 Jul. The minimum period of day length in Baghdad was 9h: 57m) in 17 Dec. whereas the maximum period was 14h: 22m) in 20 Jun. Day length was calculated and compared among regions of different latitudes(0, 15, 30, 45 and 60 north).